1. PROJECT OVERVIEW
2 / 10
2. Project Personnel
3. WORK PROGRESS
Previous
Reporting Cumulative Cumulative
No Work Description Week Deviation %
week % Actual % Planned %
Cumulative%
Schematic Drawing &
1
Calculation
3 Procurement
4 / 10
Previous
Reporting Cumulative Cumulative
No Work Description Week Deviation %
week % Actual % Planned %
Cumulative%
5 / 10
4. WORK OBJECTIVE OF 4th QUARTER AND CURRENT MONTH
6 / 10
5. WORK OF THIS WEEK
• Escalator & Elevator:
o Escalator & Elevator relevant drawings: Meeting with MOVILIFT Personal
from Italy, has been conducted on 13-Oct-2022. MOVILIFT is preparing
drawing and document as per BUCG guidance. Target Date 22-10-2022.
• Cold Storage System of CTB:
o Draft Technical proposal has been shared with BUCG by Whatsapp on 17-
Oct-2022. Actual submission Target Date 21-10-2022.
• Shop Drawing Works (Target):
o Shop drawings to be prepared and submitted as per shop drawing schedule
4.1.12.2.4.2_Shop Drawing Submission Schedule for PTB
➢ ADM Pre-embedment (submission for approval)
➢ PTB Pre-embedment (submission for approval)
➢ Utility Tunnel route (Submission for review)
➢ Control tower connection details (submission for approval)
• PTB Grounding system drawing (Submitted):
o PTB Grounding system drawings Rev 02 has been submitted on 02-Oct-
2022. Waiting for feedback.
• Pre embedment pipe layout (Draft Submitted):
o Pre embedment drawings for ADM building work has been shared for
review by Whatsapp on 16-Oct-2022.
• FHS:
o A coordination meeting has been held on 16-10-2022. Will submit the RFI
by today.
o Foreign design contractor will come here in Sylhet by 21-10-2022
• STP WTP:
o The sub-contractor has submitted the technical proposal.
o Aeroness has checked the submittal, Preparing the presentation.
o Target submission date 22-10-2022 (WTP)
o Target submission date 24-10-2022 (STP)
• Baggage Handling System: RFI regarding the meeting is shared.
• PBB: As per the information getting from CAAB, CE Sir will review the letter by this
week.
• Admin Building Grounding System Work: AERONESS Started the Grounding System
Work for Admin Building. WIR No. OIA-BU-CA-EM-ADM-001.
• PTB Grounding System Work: Grounding system work for PTB is ongoing.
7 / 10
6. WORK PLAN OF NEXT WEEK
• Revise prepared drawings: (as per requirement)
o ADM Pre embedment drawings final submission
o PTB Grounding system drawings (if consultant has any suggestion)
o To finalize technical proposal for CTB Cold Storage.
o STP Technical Submittal
o WTP Technical Submittal
o FFS (Pipe and Accessories) RMC Submittal
7. PROGRESS PHOTOS
N/A.
Planned % for
No Work Description Planned % for ’2022
next week
1 Detailed Design/Shop Drawings
1.1 Air Side (AS)
1.2 Land Side (LS)
1.3 General (GE)
1.4 Passenger Terminal Building (PTB)
1.5 Cargo Building (CAR)
1.6 Rescue and Fire Fighting Station (FIR)
Operation Building & Control Tower
1.7
(CON)
1.8 Administrative Building (ADM)
1.9 Maintenance Building (MAI)
1.10 AFL Station (AFL)
1.11 Utility Station (UTI)
1.12 Cargo Annex Building (ANX)
Sewage Treatment Plant (STP) & Water
1.13
Treatment Plant (WTP)
2 Procurement
Air Side (AS)
Land Side (LS)
General (GE)
8 / 10
Passenger Terminal Building (PTB)
Cargo Building (CAR)
Rescue and Fire Fighting Station (FIR)
Operation Building & Control Tower
(CON)
Administrative Building (ADM)
Maintenance Building (MAI)
AFL Station (AFL)
Utility Station (UTI)
Cargo Annex Building (ANX)
Sewage Treatment Plant (STP) & Water
Treatment Plant (WTP)
3 Installation & Commissioning
3.1 Air Side (AS)
3.2 Land Side (LS)
3.3 General (GE)
3.4 Passenger Terminal Building (PTB)
3.5 Cargo Building (CAR)
3.6 Rescue and Fire Fighting Station (FIR)
Operation Building & Control Tower
3.7
(CON)
3.8 Administrative Building (ADM)
3.9 Maintenance Building (MAI)
3.10 AFL Station (AFL)
3.11 Utility Station (UTI)
3.12 Cargo Annex Building (ANX)
3.13 Sewage Treatment Plant (STP)
Status
Document Document Ref. No Docum
No Date Description (Open or
Type ent
Close)
(RFI/TRN/MC Ref.
/LET) No
9 / 10
10. ISSUES TO BE SOLVED
➢ N/A
12. INTERNAL ACTIVITY OF AERONESS INTERNATIONAL
Ongoing Activities:
➢ Electrical, HVAC, Special Items suppliers are to be finalized and engaged for drawings.
➢ BHS Procurement Discussion Still ongoing.
➢ Special items suppliers are being engaged to prepare the drawings/technical proposal.
➢ STP, WTP supplier Communication regarding technical parameters of the proposal.
➢ LPS grounding drawings for PTB is on progress to get approval.
10 / 10