REQUIRED TESTING NUMBER FOR SOIL EMBANKMENT


ACCORDING TO SPECIFICATIONS

Regency No. Batch Functional Length (Km) Start Km End Km

Report Date : Effective Length (Km) Start Km End Km

Contractor Name

TESTING METHOD SPEC. REQUIREMENT TESTING FREQUENCY


NO. KIND OF TEST SNI AASHTO EMB SUBGRADE BASIC PERIO- DIARY REMARKS
DICALLY
01 Sieve Analysis 03-1968-1990 T - 27 - - ▲ ●
02 Hydrometer 03-3422-1994 T - 88 - - ▲ ●
03 Liquid Limit 03-1967-1990 T - 89 - - ▲ ●
04 Plastic Limit & Pl. Index 03-1966-1989 T - 90/91 - - ▲ ● PI max. 6% for selected Emb.
05 Mouisture Content - - ▲ ● ○
06 Standard Proctor 03-1742-1989 T - 99 - - ▲ ●
07 CBR (Laboratory) 03-1744-1989 T - 193 min. 6% min. 6% ▲ ● Min. 10% for selected Emb.
08 Specific Gravity T - 100 - - ▲ ●
09 Classification of Soils M - 145 No. as A-7-6 or CH ▲ ●
10 Determining Expansive T - 258 maks. 1.25 maks. 1.25 ▲ ●
11 Field Density 03-2828-1992 T - 191 95% 100% - - ¯
12 Proof-Rolling No movements - - ∆
13 Dynamic Cone Penetrometer - - - - x
LEGEND : ▲ Every Beginning ● Every 1.000 Cu.m ∆ Every laying after compacted
Every Quarry/Borrow material (minimum 1 test) ○ Every laying (2 times during compacted)
Every Change Quality x Instruction by Engineer
Every Trial ¯ Every 200 meter (min. 1 test)