WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP) IBRD Loan 8043-IND

PACKAGE :
PROVINCE :

SIEVE ANALYSIS
AASHTO T 11- 90 & T 27-88

Location : ......................................................................... Sample No. : ....................................................................................


Type of Work : ......................................................................... Tested by : ....................................................................................
Type of Material : ......................................................................... Date Tested : ....................................................................................

Sample Weight : ....................... gr Sample Weight : ....................... gr


SIEVE NO. CUMULATIVE CUMULATIVE AVERAGE SPECIFICATION
INDIV. WT. INDIV. WT.
RETAINED RETAINED
WT. RET. % RET. % FINER WT. RET. % RET. % FINER

2"

1 1/2"

1"

3/4"

3/8"

#4

# 10

# 40

# 200

REMARK _______________________________________________________________________________________________________________________
_______________________________________________________________________________________________________________________
_______________________________________________________________________________________________________________________
UNIFIED SOILS CLASSIFICATION SYSTEM
COARSE
SILT FINE SAND INTERMEDIATE SAND FINE GRAVEL COARSE GRAVEL
SAND

U.S. STANDARD SIEVE SIZE


MICRON
5 10 20 50 200 100 50 40 30 20 16 10 8 4 3/8" 1/2" 3/4" 1" 11/2" 2" 21/2" 3"
100 100

90 90

80 80

70 70
TOTAL PERCENT PASSING
TOTAL PERCENT PASSING

60 60

50 50

40 40

30 30

20 20

10 10

0 0
10 20 50 100 800 1000 5000 10000 50000 MICRON

0.0005 0.001 0.005 0.01 0.05 0.1 0.5 1 2 3 INCH

EQUIVALENT GRAIN DIAMETER

Prepared by contractor Checked by consultant Approved by PM's staff


Name : Name : Name :
Position : Position : Position :
Date : Date : Date :
Signature : Signature : Signature :