You are on page 1of 1

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP) IBRD Loan 8043-IND

PACKAGE :
PROVINCE :

CBR LABORATORY TEST


AASHTO T 193 - 81
KM. POST/STA HOLE No.
MATERIAL DATE OF MADE

COLOUR TECHNICIAN

COARSE AGGREGATE FINE AGGREGATE CHECKED BY


RAMMER OPTIMUM

NUMBER OF LAYER BLOW / LAYER WATER CONTENT BEFORE SOAKING

PISTON AREA AFTER SOAKING

VELOCITY No

WEIGHT OF LOAD MOULD DIA ( cm )


MACHINE TEST WEIGHT ( gr )
SAMPLE DATA

HEIGHT OF MOULD ( cm ) SAMPLE AREA


HEIGHT OF SAMPLE SURFACE ( cm ) VOLUME OF SAMPLE inc2
HEIGHT OF SAMPLE ( cm ) VOLUME OF OF SAMPLE ft3

VOLUME OF SAMPLE ( AFTER SOAKING ) cm3


UNIT WEIGHT OF SAMPLE DETERMINING OF WATER CONTENT

BEFORE AFTER WHEN AFTER


DETERMINATION DETERMANATION INCREASING
SOAKING SOAKING COMPACTING SOAKING

WEIGHT OF MOULD AND SAMPLE CONTAINER

WEIGHT OF MOULD WEIGHT OF WET SAMPLE


WEIGHT OF WET SAMPLE WEIGHT OF DRY SAMPLE

WEIGHT OF DRY SAMPLE WEIGHT LOSS

WET UNIT WEIGHT gr/cm3 WATER CONTENT ( % )


DRY UNIT WEIGHT gr/cm3
PENETRATION DATA

SIEVE PASSING PLASTIC LIQUID LIMITS LOAD ( pon ) STANDARD CORRECTED


PENETRATION
( psi ) CBR
SIZE (%) LIMIT LIMIT INDEX DIAL TOTAL LOAD

3/4" 0.025
No.4 0.050

No.200 0.075
SWELLING 0.100 3.000
INITIAL HEIGHT OF SAMPLE 0.150

SOAKING SWELLING 0.200 4.500


DATE
PERIOD DIAL READING inc % 0.250

0.300 5.700

0.350
0.400 6.900

0.450

0.500 7.800

REMARK :

Prepared by Contractor Checked by Consultant Approved by PM's staff


Name : Name : Name :

Position : Position : Position :

Date : Date : Date :

Signature : Signature : Signature :

1 513164968.xls

You might also like