1 DATA SHEET FOR DIESEL FUEL STORAGE TANK

2 CLIENT : DOCUMENT NO :

o
3 GNPOC DIF-0015-MEC-ED-004
4 PROJECT : SHEET NO :
5 GREATER DIFFRA FPF & FLOWLINES 1 OF 3
6 EQUIPMENT NAME : JOB NO :
7 Greater Nile Petroleum Company OGP Technical Services DIESEL FUEL STORAGE TANK 4002-A92
OGP Technical Services SdnSdn
BhdBhd
Limited
8 TAG NO : LOCATION :
9 TK-11004 DIFFRA, SUDAN
10 General
11 Service Diesel Oil Storage Content Diesel oil
12 Quantity required One (1) Type Fixed cone roof
13 Process Data
14 Hazardous classification Net capacity m3 300
15 Density of liquid max./min kg/m 3
800/820 Nominal capacity m3 308
16 Viscosity @ storage temp cP 2 Tank inside diameter ID mm 7000
17 Vapour density kg/Nm3 - Tank shell height H mm 8000
18 Operating temp max/norm/min 0
C 50/35/15 Cup inside diameter m -
19 Operating pressure norm/min mm WCg Atm Cup shell height m -
20 Design temp (max/min) 0
C 85/10 Max. filling level tank mm 7360
21 Design pressure (int/vacuum) mm WCg atm Internal -
22 Test pressure mm WC As per code Bottom slope 1:120 away from ctr
23 Filling rate m3/h 20 Roof slope 1 in 6
24 Withdrawal rate m3/h 2 Roof load uniform live per code
25 Blanketting gas pressure mm WCg - Reid Vapor Pressure (RVP) <1 psi
26 Flash point/pour point (if any) 0
C -
27
28 Mechanical Design Data
29 Design code API 650 Hydraulic test As per code
30 Venting code API 2000 Nondestructive test As per code
31 Corrosion allowance botom mm 1.5 Internal painting none
32 Corrosion allow. shell mm 1.5
33 Corrosion allow. roof mm 1.5 External painting As per spec 8400
34 Corrosion allow. for roof int. structure mm 1.5 Pickling and passivation None
35 Joint efficiency As per code Insulation bottom material/thk None
36 Zone coefficient Z per UBC 0.25 Insulation shell material/thk (mm) None
37 Importance factor 1 Insulation roof material/thk (mm) None
38 Site amplification factor 1.5 Insulation cladding material/thk (mm) None
39 Wind load acc. to
40 Design wind speed km/h 135
41 Inspection by Third Party
42 Materials Of construction
43 Parts/components Material Remark Parts/Components Material Remark
44 Bottom annular plate A36 or equivalent Gaskets: Compr'd aramide fibre
45 Bottom sketch plate A36 or equivalent Internals, welded A36/A106 Gr B
46 Shell plate A36 or equivalent
47 Compression ring A36 or equivalent
48 Roof structure A36 or equivalent
49 Roof plate A36 or equivalent
50 Roof centre ring A36 or equivalent
51 Suspended deck
52 Stiffeners A36 or equivalent
53 Anchors
54 Floating deck
55 Clean out door A36 or equivalent PWHT
56 Clips A36 or equivalent
57 Pipes A106 Gr B
58 Flanges A105
59 Bolts/nuts A193-B7/A194-2H
60 0 Issued for comment ZBM MK SH 25/11/02
61 B Issued for comment ZBM MK SH 14/11/02
62 A Issued for IDC ZBM MK SH 06/11/02
63 Revision Description Prepared by Checked by Approved by Date

602306155.xls
65 Project : GREATER DIFFRA FPF & FLOWLINES
66 Client : GNPOC, SUDAN
67 Job No.: 4002-A94
68 Doc No. : DIF-0015-MEC-ED-004 , SHT 2 OF 3
69 Revision : 0
70 Nozzles schedule
71 Noz. No. off Description DN inch Rating Standard Flange CL elev. Remark
72 Ref type & from tank
73 N1 1 Feed inlet 3 150 B16.5 facing
WNRF bottom
2000
74 N2 1 Diesel outlet 6 150 B16.5 WNRF 200
75 N3 1 Spare w/ blind 2 150 B16.5 WNRF 1500
76 N4 1 Drain 2 150 B16.5 WNRF 175
77 N5 1 Atm vent 6 150 B16.5 WNRF roof with flame arrestor
78 N6 1 Level indicator 4 150 B16.5 WNRF roof Note-6
79 N7 1 Thief hatch 6 150 B16.5 WNRF roof
80 N8 1 TI 2 300 B16.5 WNRF 500
81 N9 A/B 2 Level transmitter 2 150 B16.5 WNRF 300/656
82 N10 2 Blow off hatch 16 150 B16.5 WNRF roof Note-4
83 N12 1 Fuel return from heater treater 2 150 B16.5 WNRF 1500
84 M1 1 Roof manhole with B/F 24 As per API 650 roof with hinge
85 M2 1 Shell manhole with B/F 24 As per API 650 700 with hinge
86 M3 1 Shell cleanout door 24X24 As per API 650 with hinge
87
88
89
90
91
92
93
94
95
96
97
98 Note
99
100 1. Tank accessories to be supplied by tank vendor; spiral stairway, walkway, handrail
101 2. Cathodic protection system for external of tank to be provided.
102 3. Applicable GNPOC spec. # 4410-A, 8400, 8550
103 4. Tank shall be provided with emergency vent in accordance with API 2000. Nozzle size for N 10 to be confirmed by tank vendor.
104 5. Tank shall be anchored.
105 6. Nozzle N6 shall be provided with two anchor bolts at tank roof and two anchor bolts at tank bottom for level indicator floats.
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130 o
602306155.xls

You might also like