Professional Documents
Culture Documents
2d Intermediate #30 184 29
2d Intermediate #30 184 29
H
A A-A ( 1 : 4 )
H
103,50
G G
F
A 4,70
1 F
1886,30
2000,00
B 25,50
10,00
45
7, 2
0(
PC
56,50
C 6,0
0 R R-R ( 1 : 4 )
0,65
D) R 4
2x45
3 ,92
E 38 E
,2 4
200,00
103,50
2
30,00
3 7
290,00 (PCD)
501,78
400,00
177,00
279,06
349,00
254,00
200,00
200,00
250.00
5/8"
R
- T-T ( 1 : 4 )
/8"
T 5
6,70
100,00X2MM
D
1 2,70 D
160,00
200,00
37,62 R6 51,70
5,0
38,80
0
C
2 4,00
18,10
14,40
18,10
B 4,70
100,00
109,00
T 30,00
C
B-B ( 1 : 4 ) mencapai 321-375 GHN (Brinnel Hardness Number)
2. Dynamic Balance: Residual unbalance tidak boleh melebihi 3.7 Oz-In C
(2.854 gram-mm) pada masing masing balance plane (Berat + 830 lbs)
3. Run out radial (unit terpasang) maks. 0.05 mm/2m panjang.
A
F2
1"
9. Gear hub disupply tidak terakit dengan intermediate shaft karena item 8
6
4 HEX BOLT 1"-13UNF-2A x 170 MM 16 PCS AISI 4340
1"
Metric
K-K ( 1 :2 ) Fatchur Rochim Syukron Masruri Achmad Dwi Nugroho 13.02.2019
A 153,00
Title
A
PT. PERTAMINA (Persero) RU V INTERMEDIATE SHAFT 24 SPLINES
Rotating Equipment Inspection Engineering Tag No. Edition Sheet
Balikpapan KK-3-02 ABC Rev.7 1/3
12 11 10 9 8 7 6 5 4 3 2 1