Punjab General Industries Private Limited Doc No CH-SMS-03

Activity Chart Rev no 00


As per ISO 9001:2015 & IATF 16949:2016 Rev Date 12.03.2021
Incoming scrap

Fail Test sample in lab

Charge scrap in furnace for melting (if scrap sample report is ok )

Slag off
Report
Test sample

Make full level F/c with molten metal

Add ferro alloys and achieve temperature

If LRF &VD not required Test sample Report

Tap and transfer for further process in LRF

Test sample Report

Complete refining and achieve temperature

If VD not required

Transfer for further process in VD

Transfer for casting at CCM OR Ingot

Casting completed.

√ Master Copy √ Controlled Copy Uncontrolled Copy Obsolete Copy

Prepared by : Engineer QA Controlled by: QMS-MR Approved by: Head QA


Page 1 of 1