Summary for Rebar Fabrication & Installation Recard

Manpower
Fabrication Installation Total
No Date Shift Item Type
Manpower
A A B C D

18-Apr-18 Morning 5 5 10 Pile Cap Rebar CT1

18-Apr-18 Evening 5 6 6 17 Pile Cap Rebar CT2

CT1
19-Apr-18 Morning 7 5 5 5 22 Pile Cap Rebar

CT2
2
19-Apr-18 Evening 5 5 5 4 19 Pile Cap Rebar CT2

19-Apr-18 Night 5 5 5 5 20 Pile Cap Rebar CT1

20-Apr-18 Morning 10 5 5 5 5 30 Pile Cap Rebar CT1

CT4
3 20-Apr-18 Evening 8 5 5 18 Pile Cap Rebar
CT4
3

20-Apr-18 Night 7 5 5 5 22 Pile Cap Rebar CT1

21-Apr-18 Morning 11 5 5 5 5 31 Pile Cap Rebar CT1

CT4
4 21-Apr-18 Evening 7 4 4 4 19 Pile Cap Rebar
CT4

21-Apr-18 Night 7 5 5 5 22 Pile Cap Rebar CT1

Beam

22-Apr-18 Morning 8 4 4 5 21 Pile Cap Rebar


CT1

5 CT4
22-Apr-18 Evening 13 5 5 23 Pile Cap Rebar
CT4

22-Apr-18 Night 7 5 5 4 21 Pile Cap Rebar CT1

Beam

23-Apr-18 Morning 8 4 4 5 21 Pile Cap Rebar


CT1

6 CT2
23-Apr-18 Evening Pile Cap Rebar
6
23-Apr-18 Evening Pile Cap Rebar
CT2

23-Apr-18 Night Pile Cap Rebar CT1


Qty
Weight/Nos Total ( Kg )
(Nos)

Fabrication 4 67.73 270.92

Installation 4 67.73 270.92

Fabrication 2 620.5 1241

Installation 2 620.5 1241

Fabrication 16 67.73 1083.68

Installation 8 67.73 541.84

Fabrication 6 620.5 3723

Installation 6 620.5 3723

Installation 8 620.5 4964

Fabrication, S3CT1 125 3.47 433.75

Installation 17 67.73 1151.41

Fabrication 393.42

Installation 2 620.5 1241


Fabrication ( F1 ) 140 1.163 162.82

Installation 10 67.73 677.3

Fabrication 1714.65

Installation 17 67.73 1151.41

Fabrication 312.11

Installation 3 620.5 1861.5

Fabrication ( F1,F2 ) 756.76

Installation 12 67.73 812.76

Fabrication 38.22

Fabrication 1776.49

Installation 17 67.73 1151.41

Fabrication 581.36

Installation 1.25 620.5 775.625

Fabrication 640.43

Installation 12 67.73 812.76

Fabrication 30.69

Fabrication 1692.5

Installation 19 67.73 1286.87

Fabrication 366.87
Installation 4 620.5 2482

Fabrication 345.59

Installation 12 67.73 345.59


Name : REBAR Fabrication ( Record Only )
Project Name : WILMAR MYANMAR Consumer Pack Plant Sub Structure ( WM-CPP)
Develper : WILMAR Edible Oil Co.,Ltd
Client : Penta-Ocean Construction Co.,Ltd
Sub-Contractor : Khakaborazi Co.,Ltd

Bar Ø ( mm )
Number of Bars Length of Pile Cap Bar Total Total

Unit
Sr. Member Bar Mark Bar Shape in Each Member Each Bar Qty Number Length
( mm ) ( mm ) ( Nos ) ( Nos ) (m)
Revision
Letter
205

205
CT1 12 Nos 14 1310 225 3150 4126.5 REV-00
1 F1
Pile Cap

900

CT1
1200

2 F2 1200 12 Nos 14 3300 225 3150 10395 REV-00


Pile Cap

900

924
924

924

12 Nos 3 3912 225 675 2640.6 REV-00


CT1
3 S3
Pile Cap

924

22 Nos 18 2715 27 486 1319.49 REV-00


CT1
3 M5U-DZ3,3a
Pile Cap

22 Nos 6 2740 27 162 443.88 REV-00


CT1
3 M6U-DZ3,3a
Pile Cap

CT2
4 M2Z-DZ2 25 Nos 14 2450 28 392 960.4 REV-00
Pile Cap

CT2
5 M2U-DZ2 25 Nos 10 2450 28 280 686 REV-00
Pile Cap

CT2
6 F1 12 Nos 13 2640 28 364 960.96 REV-00
Pile Cap

CT2
7 F2 22 Nos 13 4490 28 364 1634.36 REV-00
Pile Cap

CT2
8 S1 12 Nos 13 2640 28 364 960.96 REV-00
Pile Cap

12 Nos 23 3076 28 644 1980.944 REV-00


CT2
9 S2
Pile Cap

12 Nos 23 2380 28 644 1532.72 REV-00


CT2
10 S2
Pile Cap

12 Nos 23 1660 28 644 1069.04 REV-00


CT2
11 S2
Pile Cap

12 Nos 10 3960 28 280 1108.8 REV-00


CT2
12 S3
Pile Cap

Beam Rebar
230
530

530

1 Beam Stirrup 10 Nos 1650 REV-00

230

230

Torsion Bar
2 Beam 10 Nos 405 REV-00
75

35

Stirrup

230

Sample Shape

Group A - 7 Nos

Group B - 7 Nos

Group C - 7 Nos

Group D - 7 Nos