The First 10 pages of the Report have to be revisited (rewriten).
I suggest that you follow the format of our last Interim Report to revise. Especially, it must be clearly stated that
(i) the existing as-built condition (large pile eccentricity)
(ii) their on-site proposed modified construction of beams and pile caps (iii) final computer analysis by using the above (i) and (ii) (iv) Final conclusion (HOPE all are OK !)