Item Description Remark
WIKA SUBCONT
GENERAL PROVISION
1 GENERAL
1.1 Bond
(1) Performance bond Ο If any
(2) Retention bond Ο If any
1.2 Insurance
(1) Construction All Risk Insurance Ο
(2) General Liability Insurance Ο
(3) Worker's compensation insurance Ο BPJS/JAMSOTEK
1.4 QA/QC
Quality Assurance Ο
Quality Control Ο
1.6 Permit
Man power permit to DISNAKER Bontang Ο
Man power permit to KIE Ο
Vehicle & Heavy Equipment permit to KIE Ο
2 GENERAL SUPPLIES
2.1 Water
(1) For construction and site office Ο
2.2 Fuel
(1) For Construction Ο
(2) For heavy equipment construction Ο
(3) For Truck and car Ο
2.3 Electricity for construction, for accomodation, site office and etc ( Genset & DB Panel )
(1) For construction Ο
(2) For accomodation Ο
(3) For Site office Ο
3 ENGINEERING
4.1 Erection
(1) Coordination for equipment delivery and erection Ο
(2) Control workforce including supervision Ο
Split of work for Foundation & Floor Temporary Office
Provide by
No
Item Description Remark
WIKA SUBCONT
(3) Workforce Ο
(4) Work schedule preparation Ο
(5) Monitor and report work schedule Ο
(6) Quality control Ο
(7) Unloading material from trailer/truck Ο
(8) Handling control Ο
(9) Handling report Ο
5 TRANSPORTATION
5.2 Transportation of the construction equipment and tools to site/from site ( Mob-Demob) Ο
5.3 Transportation of the equipment and material from site storage area to erection point Ο
2 FIELD ENGINEERING
Provide by
No
Item Description Remark
WIKA SUBCONT
2.5 Report Ο
(1) Site Organization Chart
(2) Construction Schedule (Planning and Actual)
a. Master schedule
b. Daily schedule
c. Weekly schedule
d. Monthly Schedule
(3) Manpower Schedule
a. Estimated monthly schedule
b. Actual ( Daily and Monthly )
(4) The Certificate and Qualification for License Work
(5) Inspection and Test Report
(6) Photograph Progress Report
(7) Employee List
(8) Tools and Heavy Equipment
a. Heavy equipment schedule
b. Tools and Heavy equipment list
(9) Safety report
(10) Damage/Accident report
(11) Other Records and Reports Reasonable Requested by contractor
1 Preparation work Ο
2 Foundation work Ο
3 Rebar work Ο
4 Concrete work Ο
5 Floor work Ο
6 Paving block work Ο
7 Fresh water installation Ο
8 Waste water installation Ο
9 Landscaping Ο
SPLIT OF MATERIAL
1 Concrete Ο
2 Wiremesh Ο
3 Ceramic Ο
4 Paving Block Ο
5 U ditch Ο
6 Closet Ο
7 Wastafle Ο
8 Urinoir Ο
Split of work for Foundation & Floor Temporary Office
Provide by
No
Item Description Remark
WIKA SUBCONT
9 Pipa PVC Ο
10 Valve Ο
11 Septic Tank Ο