You are on page 1of 1

CLIENT : DHAYA MAJU LTAT SDN BHD CALC.

SHEET : 1
PROJECT : KVDT PHASE 2 DATE : 5-Nov-19
CALC BY : ZIANA CHECKED BY: AINUL DRG. REF : -

Preliminary Culvert Design For Kajang to Bangi

Q = peak flow (m3/s) Proposed Size


Proposed Chainage (Ch)
No. Proposed Crossings Catchment Area, ha Q5 Q50 Q100 width (m) depth (m)
(Based on Topographical Map)
KAJANG STATION KM 414700
1 C1KB 414.724 32.73 8.06 12.41 13.88 3.0 1.5
2 C2KB 415.300 55.95 12.71 19.57 21.88 3.6 2.4
3 C3KB 416.000 9.19 4.34 6.68 7.47 2.4 1.8
4 C3KB-A 416.180 93.58 20.90 30.28 33.85 3.6 2.4
5 C4KB 416.925 81.79 10.14 14.69 16.43 3.0 1.5
6 C5KB 419.200 21.27 6.18 9.52 10.64 2.4 1.8
7 C6KB 419.725 21.58 5.43 8.36 9.35 2.4 1.8
8 C7KB 420.250 7.42 2.71 4.15 4.64 1.8Ø
9 C8KB 420.325 5.40 2.04 3.11 3.48 1.8Ø
10 C9KB 420.800 248.43 25.98 37.64 42.08 6.0 6.0
11 C10KB 421.225 4.26 1.66 2.53 2.83 1.8Ø
12 C11KB 422.150 22.16 2.92 5.28 5.91 2.4 1.8
13 C12KB 422.380 8.17 1.41 2.56 2.86 1.8Ø
14 C13KB 423.275 18.16 2.34 4.23 4.73 1.8Ø
15 C14KB 423.350 7.65 1.14 2.07 2.31 1.8Ø
16 C15KB 424.360 137.76 9.46 13.71 15.33 3.0 1.5
17 C16KB 424.800 7.52 1.22 2.21 2.47 1.8Ø
BANGI STATION KM 424800

NOTES:
1. Final culvert design size shall be subjected to final detail survey
2. Q100 level will be subjected to final detail survey

You might also like