2:03 PM

No: 41.01.09/ Petrobangla Date: 23-24/02/2010 (from 8:00 to 8:00)


Production & Marketing Division Gas in MMCFD
3, Kawran Bazar, Dhaka-1215 Units: Condensate/NGL in BBLD
LPG in Kg
Daily Gas & Condensate Production and Distribution Report
I. Production III. LPG Production
Gas No.of Produc Production Production Pro.as a % of Pro.as a % of
Company Fields ing Wells Capacity Gas Condensate T.Cap(Gas) T. Prod(Gas)
Titas 14 420 407.4 429.0 20.4 20.4 NGL To Production
Bakhrabad 4 34 35.9 24.0 1.7 1.7 LPG Plant LPG MS
Habiganj 9 240 239.5 15.0 1.8 1.8 465.4 n/a n/a
1. BGFCL
Narsingdi 2 35 34.2 71.1 1.7 1.7
Meghna 0 0 0.0 0.0 0.0 0.0 N-S & RA pipeline
Sub-Total 29 729 717.0 539.1 35.8 35.9 Delivered from N-S pipeline
Sylhet 1 2 6.5 78.9 0.3 0.3 AB 344.7 ,,
Kailashtila #1 2 23 22.4 202.0 1.1 1.1 BB: -1 141.6 ,,
2. SGFL Kailashtila #2 4 74 72.3 599.4 3.6 3.6 BB: - 2 204.2 ,,
Rashidpur 5 53 49.6 50.4 2.5 2.5 VS3: 54.8 ,,
Beanibazar 2 18 15.4 254.8 0.8 0.8 AM 418.0 ,,
Sub-Total 14 170 166.2 1185.5 8.3 8.3 Total: 1163.3 mmcfd
Salda 2 11 8.3 4.1 0.4 0.4
Fenchuganj 2 32 24.8 42.5 1.2 1.2 Remarks:
3. BAPEX
Shahbazpur 1 15 7.4 0.3 0.4 0.4
Sub-Total 5 58 40.5 46.9 2.0 2.0
Sub-Total (1+2+3) 48 957 923.7 1771.5 46.2 46.3
4. IOCs
CAIRN Sangu 6 35 31.7 14.8 1.6 1.6
Jalalabad 4 230 160.9 1456.7 8.0 8.1
CHEVRON Maulavibazar 4 75 59.7 90.4 3.0 3.0
Bibiyana 12 600 698.5 3641.6 34.9 35.0
NIKO Feni 1 3 1.9 2.5 0.1 0.1
TULLOW Bangura 4 100 120.4 136.0 6.0 6.0
Sub-Total 31 1043 1073.0 5342.1 53.6 53.7
Grand Total (1+2+3+4): 79 2000 1996.7 7113.6 99.8 100.0
II. Company-wise Distribution
Power Fertilizer
Company Others-Supl. Total
Power Plants Demand Supply Company Max.Demand Supply
Ashuganj (610 MW) 139.0 137.6 ZFCL 52.0 52.9 Remarks:
Ghorasal (845 MW)* 185.0 180.8 JFCL 45.0 35.5
Siddhirganj (190 MW) 48.0 39.8 UFFL 45.0 36.2
Siddhirganj (120X2 MW) 20.0 0.0 PUFF 14.0 8.8 *APS-unit 1 shutdown.
Haripur (SBU 96 MW)* 25.0 17.0 *SPS 240 MW shutdown.
1. TGTDCL Haripur(NEPC)110 MW* 20.0 11.5 *Haripur 360 MW shutdown.
Haripur P. P. 360 MW 55.0
Meghna P. P. 450 MW 75.0 70.2
Tongi (105 MW) 25.0 13.8
RPCL (210 MW) 35.0 18.5
Madhabdi REB 35 MW 7.2 7.1 Total TGTDCL Power (including
Ashulia REB 45 MW 9.6 6.8 non-grid power) = 555.2
Tangail 22 MW SIPP 4.8 4.1
Narsingdi 22 MW SIPP 4.8 3.5
Maona 33 MW SIPP 7.5 5.9
Rupganj, N'ganj-SIPP (33) 7.5 4.9 Total TGTDCL (including
Sub-Total 668.4 521.5 156.0 133.4 806.0 1461.0 non-grid power) = 1494.6
Rauzan(2x180 MW)* 90.0 30.9 CUFL 52.0 8.8 2.1 Remarks:
2. BGSL Sikalbaha (40 MW)* 0.0 4.8 KAFCO 63.0 55.0 172.2 *Rauzan 1 Unit shutdown
Comilla REB 24 MW 5.0 5.1
Feni-22 MW SIPP 4.8 1.2 Total BGSL Power (including
Mohipal-11 MW SIPP 2.4 2.2 non-grid power) = 60.1
Barabkunda 22 MW SIPP 5.0 4.1
Jangalia-33 MW SIPP 7.5 6.6 Total BGSL (including
Sub-Total 114.7 54.8 115.0 63.8 174.3 292.9 non-grid power) = 298.2
Shahjibazar 2x30 MW 16.8 19.8 NGFF 18.0 16.3 Remarks:
S.Bazar 3 yrs rental 50 MW 7.2 7.0
S.Bazar 15 yrs rent 86 MW 19.2 19.3
Fenchuganj CC1 90 MW 16.8 16.2
Fenchuganj CC2 90 MW* 0.0 0.0 *Fenchuganj CC 2 shutdown
3. JGTDSL Kumargaon 20 MW 4.8 1.9 *F.ganj 3 yrs rent 50 MW shutdown.
K.gaon 3 yrs rent 50 MW 9.6 7.8
K.gaon 15 yrs rent 10 MW 2.4 2.4
Habiganj 11 MW SIPP 2.4 2.5
F.ganj 15 yrs rent 50 MW 10.0 10.4
F.ganj 3 yrs rent 50 MW 7.5 0.0
Sub-Total 96.7 87.3 18.0 16.3 51.2 154.8
Westmont 70 MW 25.0 10.9 Remarks:
4. PGCL Baghabari (100+71 MW) 47.0 43.6
Bogra 15 yrs rent (20 MW) 4.8 4.4
Ullapara 11 MW SIPP 2.4 2.4
Sub-Total 79.2 61.3 0.0 16.5 77.8
5. BAPEX Bhola 3 yrs rent 34.5 MW 10.0 7.4 0 0.0 7.4
Total : 969.0 732.4 289.0 213.5 1048.0 1993.9
Non-Grid Power : 785.4 (Considering diversity factor 0.85)
Meghna Energy 1.5
Rahim Energy 7.9 Remarks :
TGTDCL Unique Power 7.1
Alpha Power 20.0 1.6
Shah Power 1.3
CSI Power* 3.9
Abdul Monem Power 3.0
Malancha Holdings 5.7
A. S. M. Power 1.6
Sub-Total 20.0 33.6 33.6
BGSL Malancha Hold.45 MW 5.3 5.3
Total Non-Grid Power : 38.9 38.9
Grand Total 989.0 771.3 289.0 213.5 1048.0 2032.8
% of Total Distribution 37.9 10.5 51.6 100
Copy to:
1. Chairman, Petrobangla.
2. Chairman/Member (Generation), BPDB (Fax: 9564765 / 9551093 / 9551296)
3. Director (Finance/PSC/Operation & Mines/Planning), Petrobangla. (Signed by)
4. PS to Hon' ble State Minister, Ministry of Power, Energy & Mineral Resources (Fax: 7170464). General Manager
5. PS to Secretary, Energy & Mineral Resources Division, MOEMR (Fax: 7161110). Production & Marketing Div.
6. Chevron/ CAIRN /Hydrocarbon Unit/ IT Dept.(www. petrobangla.org.bd) Tel: 9132092
1:13 PM

No: 41.01.09/ Petrobangla Date: 22-23/02/2010 (from 8:00 to 8:00)


Production & Marketing Division Gas in MMCFD
3, Kawran Bazar, Dhaka-1215 Units: Condensate/NGL in BBLD
LPG in Kg
Daily Gas & Condensate Production and Distribution Report
I. Production III. LPG Production
Gas No.of Produc Production Production Pro.as a % of Pro.as a % of
Company Fields ing Wells Capacity Gas Condensate T.Cap(Gas) T. Prod(Gas)
Titas 14 420 406.0 428.0 20.3 20.7 NGL To Production
Bakhrabad 4 34 35.6 22.0 1.7 1.7 LPG Plant LPG MS
Habiganj 9 240 239.0 14.9 1.8 1.8 465.4 n/a n/a
1. BGFCL
Narsingdi 2 35 34.2 73.7 1.7 1.7
Meghna 0 0 0.0 0.0 0.0 0.0 N-S & RA pipeline
Sub-Total 29 729 714.8 538.6 35.7 36.4 Delivered from N-S pipeline
Sylhet 1 2 6.4 60.8 0.3 0.3 AB 319.6 ,,
Kailashtila #1 2 23 21.3 193.5 1.1 1.1 BB: -1 140.2 ,,
2. SGFL Kailashtila #2 4 74 74.9 609.4 3.7 3.8 BB: - 2 198.4 ,,
Rashidpur 5 53 49.2 48.6 2.5 2.5 VS3: 55.6 ,,
Beanibazar 2 18 15.5 271.5 0.8 0.8 AM 411.2 ,,
Sub-Total 14 170 167.4 1183.8 8.4 8.5 Total: 1125.0 mmcfd
Salda 2 11 8.1 4.0 0.4 0.4
Fenchuganj 2 32 24.7 44.5 1.2 1.3 Remarks:
3. BAPEX
Shahbazpur 1 15 7.8 0.1 0.4 0.4
Sub-Total 5 58 40.5 48.6 2.0 2.1
Sub-Total (1+2+3) 48 957 922.7 1771.0 46.1 47.0
4. IOCs
CAIRN Sangu 6 35 30.9 12.1 1.5 1.6
Jalalabad 4 230 161.7 1408.8 8.1 8.2
CHEVRON Maulavibazar 4 75 58.9 18.9 2.9 3.0
Bibiyana 12 600 666.0 3290.3 33.3 33.9
NIKO Feni 1 3 1.9 2.5 0.1 0.1
TULLOW Bangura 4 100 120.5 136.0 6.0 6.1
Sub-Total 31 1043 1039.8 4868.6 52.0 53.0
Grand Total (1+2+3+4): 79 2000 1962.5 6639.6 98.1 100.0
II. Company-wise Distribution
Power Fertilizer
Company Others-Supl. Total
Power Plants Demand Supply Company Max.Demand Supply
Ashuganj (610 MW)* 139.0 137.2 ZFCL 52.0 52.9 Remarks:
Ghorasal (845 MW)* 185.0 165.6 JFCL 45.0 41.6
Siddhirganj (190 MW) 48.0 34.2 UFFL 45.0 36.0
Siddhirganj (120X2 MW) 20.0 7.1 PUFF 14.0 8.5 *APS-unit 1 shutdown.
Haripur (SBU 96 MW) 25.0 19.3 *GPS-unit 3 shutdown.
1. TGTDCL Haripur(NEPC)110 MW 20.0 14.0 *Horipur 360 MW shutdown.
Haripur P. P. 360 MW* 55.0 0.0
Meghna P. P. 450 MW 75.0 70.6
Tongi (105 MW) 25.0 11.8
RPCL (210 MW) 35.0 20.7
Madhabdi REB 35 MW 7.2 7.2 Total TGTDCL Power (including
Ashulia REB 45 MW 9.6 9.4 non-grid power) = 554.2
Tangail 22 MW SIPP 4.8 4.1
Narsingdi 22 MW SIPP 4.8 3.9
Maona 33 MW SIPP 7.5 6.0
Rupganj, N'ganj-SIPP (33) 7.5 4.3 Total TGTDCL (including
Sub-Total 668.4 515.5 156.0 139.0 805.7 1460.2 non-grid power) = 1499.0
Rauzan(2x180 MW) 90.0 15.3 CUFL 52.0 10.3 2.5 Remarks:
2. BGSL Sikalbaha (40 MW)* 0.0 0.5 KAFCO 63.0 55.3 163.3 *Sikalbaha shutdown.
Comilla REB 24 MW 5.0 4.7
Feni-22 MW SIPP 4.8 4.4 Total BGSL Power (including
Mohipal-11 MW SIPP 2.4 1.8 non-grid power) = 43.1
Barabkunda 22 MW SIPP 5.0 4.6
Jangalia-33 MW SIPP 7.5 6.6 Total BGSL (including
Sub-Total 114.7 37.9 115.0 65.6 165.7 269.2 non-grid power) = 274.4
Shahjibazar 2x30 MW 16.8 18.6 NGFF 18.0 16.7 Remarks:
S.Bazar 3 yrs rental 50 MW 7.2 7.1
S.Bazar 15 yrs rent 86 MW 19.2 19.3
Fenchuganj CC1 90 MW 16.8 15.6
Fenchuganj CC2 90 MW* 0.0 0.0 *Fenchuganj CC 2 shutdown
3. JGTDSL Kumargaon 20 MW 4.8 2.3 *F.ganj 3 yrs rent 50 MW shutdown.
K.gaon 3 yrs rent 50 MW 9.6 8.4
K.gaon 15 yrs rent 10 MW 2.4 2.0
Habiganj 11 MW SIPP 2.4 2.1
F.ganj 15 yrs rent 50 MW 10.0 10.2
F.ganj 3 yrs rent 50 MW 7.5 0.0
Sub-Total 96.7 85.5 18.0 16.7 52.8 155.0
Westmont 70 MW 25.0 12.9 Remarks:
4. PGCL Baghabari (100+71 MW) 47.0 50.2
Bogra 15 yrs rent (20 MW) 4.8 4.4
Ullapara 11 MW SIPP 2.4 2.3
Sub-Total 79.2 69.7 0.0 16.5 86.2
5. BAPEX Bhola 3 yrs rent 34.5 MW 10.0 7.8 0 0.0 7.8
Total : 969.0 716.3 289.0 221.4 1040.8 1978.4
Non-Grid Power : 785.4 (Considering diversity factor 0.85)
Meghna Energy 1.0
Rahim Energy 9.1 Remarks :
TGTDCL Unique Power 7.1
Alpha Power 20.0 1.8
Shah Power 2.0
CSI Power 6.5
Abdul Monem Power 2.9
Malancha Holdings 6.8
A. S. M. Power 1.7
Sub-Total 20.0 38.7 38.7
BGSL Malancha Hold.45 MW 5.2 5.2
Total Non-Grid Power : 44.0 44.0
Grand Total 989.0 760.3 289.0 221.4 1040.8 2022.4
% of Total Distribution 37.6 10.9 51.5 100
Copy to:
1. Chairman, Petrobangla.
2. Chairman/Member (Generation), BPDB (Fax: 9564765 / 9551093 / 9551296).
3. Director (Finance/PSC/Operation & Mines/Planning), Petrobangla. (Signed by)
4. PS to Hon' ble State Minister, Ministry of Power, Energy & Mineral Resources (Fax: 7170464). General Manager
5. PS to Secretary, Energy & Mineral Resources Division, MOEMR (Fax: 7161110). Production & Marketing Div.
6. Chevron/ CAIRN /Hydrocarbon Unit/ IT Dept.(www. petrobangla.org.bd) Tel: 9132092
10:13 AM

No: 41.01.09/ Petrobangla Date: 21-22/02/2010 (from 8:00 to 8:00)


Production & Marketing Division Gas in MMCFD
3, Kawran Bazar, Dhaka-1215 Units: Condensate/NGL in BBLD
LPG in Kg
Daily Gas & Condensate Production and Distribution Report
I. Production III. LPG Production
Gas No.of Produc Production Production Pro.as a % of Pro.as a % of
Company Fields ing Wells Capacity Gas Condensate T.Cap(Gas) T. Prod(Gas)
Titas 14 420 408.0 429.0 20.4 20.8 NGL To Production
Bakhrabad 4 34 34.0 22.0 1.7 1.7 LPG Plant LPG MS
Habiganj 9 240 238.0 14.6 1.7 1.7 408.8 n/a n/a
1. BGFCL
Narsingdi 2 35 34.1 72.2 1.7 1.7
Meghna 0 0 0.0 0.0 0.0 0.0 N-S & RA pipeline
Sub-Total 29 729 714.1 537.8 35.7 36.4 Delivered from N-S pipeline
Sylhet 1 2 6.7 69.6 0.3 0.3 AB 337.1 ,,
Kailashtila #1 2 23 20.6 182.8 1.0 1.0 BB: -1 140.4 ,,
2. SGFL Kailashtila #2 4 74 75.7 600.1 3.8 3.9 BB: - 2 191.8 ,,
Rashidpur 5 53 49.4 50.3 2.5 2.5 VS3: 53.8 ,,
Beanibazar 2 18 15.3 266.3 0.8 0.8 AM 395.7 ,,
Sub-Total 14 170 167.7 1169.0 8.4 8.5 Total: 1118.9 mmcfd
Salda 2 11 7.8 4.0 0.4 0.4
Fenchuganj 2 32 24.7 44.8 1.2 1.3 Remarks:
3. BAPEX
Shahbazpur 1 15 7.4 0.3 0.4 0.4
Sub-Total 5 58 39.9 49.1 2.0 2.0
Sub-Total (1+2+3) 48 957 921.7 1755.8 46.1 47.0
4. IOCs
CAIRN Sangu 6 35 31.1 12.0 1.6 1.6
Jalalabad 4 230 162.2 1320.3 8.1 8.3
CHEVRON Maulavibazar 4 75 59.7 11.1 3.0 3.0
Bibiyana 12 600 665.3 3245.6 33.3 33.9
NIKO Feni 1 3 1.9 2.2 0.1 0.1
TULLOW Bangura 4 100 120.5 137.0 6.0 6.1
Sub-Total 31 1043 1040.8 4728.2 52.0 53.0
Grand Total (1+2+3+4): 79 2000 1962.4 6484.0 98.1 100.0
II. Company-wise Distribution
Power Fertilizer
Company Others-Supl. Total
Power Plants Demand Supply Company Max.Demand Supply
Ashuganj (610 MW)* 139.0 137.7 ZFCL 52.0 52.6 Remarks:
Ghorasal (845 MW)* 185.0 141.8 JFCL 45.0 42.4
Siddhirganj (190 MW) 48.0 25.3 UFFL 45.0 36.2 *APS-unit 1 shutdown.
Siddhirganj (120X2 MW) 20.0 28.7 PUFF 14.0 8.5 *GPS-unit 1, 3 shutdown.
Haripur (SBU 96 MW) 25.0 7.2 *Tongi shutdown.
1. TGTDCL Haripur(NEPC)110 MW 20.0 8.0
Haripur P. P. 360 MW 55.0 32.2
Meghna P. P. 450 MW 75.0 70.0
Tongi (105 MW)* 25.0 0.0
RPCL (210 MW) 35.0 19.8
Madhabdi REB 35 MW 7.2 7.3 Total TGTDCL Power (including
Ashulia REB 45 MW 9.6 8.0 non-grid power) = 538.3
Tangail 22 MW SIPP 4.8 4.0
Narsingdi 22 MW SIPP 4.8 3.8
Maona 33 MW SIPP 7.5 5.7
Rupganj, N'ganj-SIPP (33) 7.5 4.0 Total TGTDCL (including
Sub-Total 668.4 503.4 156.0 139.7 709.9 1353.0 non-grid power) = 1387.9
Rauzan(2x180 MW)* 90.0 0.0 CUFL 52.0 24.7 2.4 Remarks:
2. BGSL Sikalbaha (40 MW)* 0.0 0.0 KAFCO 63.0 51.8 148.5 *Rauzan & Sikalbaha shutdown.
Comilla REB 24 MW 5.0 5.5
Feni-22 MW SIPP 4.8 4.5 Total BGSL Power (including
Mohipal-11 MW SIPP 2.4 1.8 non-grid power) = 26.0
Barabkunda 22 MW SIPP 5.0 4.2
Jangalia-33 MW SIPP 7.5 7.0 Total BGSL (including
Sub-Total 114.7 23.1 115.0 76.5 150.9 250.5 non-grid power) = 253.4
Shahjibazar 2x30 MW 16.8 19.2 NGFF 18.0 16.9 Remarks:
S.Bazar 3 yrs rental 50 MW 7.2 7.0
S.Bazar 15 yrs rent 86 MW 19.2 19.2
Fenchuganj CC1 90 MW 16.8 17.0
Fenchuganj CC2 90 MW* 0.0 0.0 *Fenchuganj CC 2 shutdown
3. JGTDSL Kumargaon 20 MW 4.8 1.9 *F.ganj 3 yrs rent 50 MW shutdown.
K.gaon 3 yrs rent 50 MW 9.6 8.1
K.gaon 15 yrs rent 10 MW 2.4 2.1
Habiganj 11 MW SIPP 2.4 2.0
F.ganj 15 yrs rent 50 MW 10.0 10.8
F.ganj 3 yrs rent 50 MW 7.5 0.0
Sub-Total 96.7 87.4 18.0 16.9 51.5 155.9
Westmont 70 MW 25.0 21.5 Remarks:
4. PGCL Baghabari (100+71 MW) 47.0 29.4
Bogra 15 yrs rent (20 MW) 4.8 4.4
Ullapara 11 MW SIPP 2.4 2.4
Sub-Total 79.2 57.7 0.0 16.5 74.2
5. BAPEX Bhola 3 yrs rent 34.5 MW 10.0 7.4 0 0.0 7.4
Total : 969.0 679.0 289.0 233.1 928.9 1841.0
Non-Grid Power : 785.4 (Considering diversity factor 0.85)
Meghna Energy 1.4
Rahim Energy 8.2 Remarks :
TGTDCL Unique Power 7.0
Alpha Power 20.0 1.7
Shah Power 2.7
CSI Power* 5.8 *CSI - shutdown.
Abdul Monem Power 2.9
Malancha Holdings 4.0
A. S. M. Power 1.4
Sub-Total 20.0 34.9 34.9
BGSL Malancha Hold.45 MW 2.9 2.9
Total Non-Grid Power : 37.8 37.8
Grand Total 989.0 716.9 289.0 233.1 928.9 1878.8
% of Total Distribution 38.2 12.4 49.4 100
Copy to:
1. Chairman, Petrobangla.
2. Chairman/Member (Generation), BPDB (Fax: 9564765 / 9551093 / 9551296).
3. Director (Finance/PSC/Operation & Mines/Planning), Petrobangla. (Signed by)
4. PS to Hon' ble State Minister, Ministry of Power, Energy & Mineral Resources (Fax: 7170464). General Manager
5. PS to Secretary, Energy & Mineral Resources Division, MOEMR (Fax: 7161110). Production & Marketing Div.
6. Chevron/ CAIRN /Hydrocarbon Unit/ IT Dept.(www. petrobangla.org.bd) Tel: 9132092