You are on page 1of 2

GF Mezzanine offices punch points:

Carpet cut pieces are laid at Junction box area – Sobha,

Glass rubber beading to be provide at all the doors-Sobha,

Ceiling touch up paints to be done- Sobha,

Fire detector to be provided at Meeting room and Full cabin -1,-Honey well,

Insulation pipe color to be made black over drain line pipe- S&W HVAC,

Conduit pipe to be made in passion at some places-S&W Elec,

Tube lights and functioning at left side of workstations- 5nos- S&W Elec,

Full Cabin-1 Junction box dummy plate to be provided- S&W Elec,

Full Cabin-1 Conduit pipe finishing- Sobha,

Wooden frame peel off/ bulge repairs- please check with all frame,

Temporary partition removal-Sobha,

Access control – Solus,

Carpet cleaning- Sobha,

Printers

Meeting room table socket fixing,

Ceiling one coat painting

Tube lights hanging wire modifications

Manager cabin table dummy plate

Pantry options

Curtains/Blinds for glass partitions,

Stair case entrance


Lights in stair case to be provided

You might also like