ITEM WISE COMPLETION STATUS OF TOWER 3 (ARCHITECTURAL FINISHES WORKS)

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed

FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed

WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed

COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed

FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed

COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed


Level-1 FALSE WORK (Dry area) Completed Completed Completed Completed Completed Completed

FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed

WOODEN DOORS Completed Completed Completed Completed Completed Completed

WARDROBES Completed Completed Completed Completed Completed Completed

KITCHEN CABINETS Completed Completed Completed Completed Completed Completed

CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed

ALUMINUM LOUVER DOORS Completed Completed Completed Completed Completed Completed

FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-2 FALSE WORK (Dry area)
Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS Completed Completed Completed Completed Completed Completed
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-3
FALSE WORK (Dry area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS Completed Completed Completed Completed Completed Completed
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-4 FALSE WORK (Dry area)
Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS Completed Completed Completed Completed Completed Completed
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-5 FALSE WORK (Dry area)
Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS N/A N/A N/A N/A N/A N/A
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-6 FALSE WORK (Dry area)
Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS N/A N/A N/A N/A N/A N/A
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-7 FALSE WORK (Dry area)
Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS N/A N/A N/A N/A N/A N/A
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed

Level-8
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-8
FALSE WORK (Dry area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS N/A N/A N/A N/A N/A N/A
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-9 FALSE WORK (Dry area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS N/A N/A N/A N/A N/A N/A
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A

FLOOR ACIVITY Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G

PAINT FINISHES Partial

FLOOR TILES (Dry area) Completed Completed Completed Completed Completed Completed
FLOOR TILES (Wet area) Completed Completed Completed Completed Completed Completed
WALL TILE (Wet&Dry area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
COUNTER TOPS(wet area) Completed Completed Completed Completed Completed Completed
Level-10 FALSE WORK (Dry area) Completed Completed Completed Completed Completed Completed
FALSE WORK (Wet area) Completed Completed Completed Completed Completed Completed
WOODEN DOORS Completed Completed Completed Completed Completed Completed
WARDROBES Completed Completed Completed Completed Completed Completed
KITCHEN CABINETS Completed Completed Completed Completed Completed Completed
CURTAIN WALL WINDOWS Completed Completed Completed Completed Completed Completed
ALUMINUM LOUVER DOORS N/A N/A N/A N/A N/A N/A
FIRE RATED DOORS N/A N/A N/A N/A N/A N/A
RAL FINISHES WORKS)
Date: 31-Oct-20
LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over

Completed
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A Light Pelmet
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over

Completed
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over

Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed

LIFT LOBBY REMARKS

Will be Done at the Time of


Customer Hand over
Completed
Completed
N/A
N/A
N/A
Completed
N/A
N/A
N/A
N/A
N/A
N/A
Completed
Completed
ITEM WISE COMPLETION STATUS OF TOWER 3 (MECHANICAL & PLUMBING WORKS)
Date:
FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY Date of Completion REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-1
ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A
Faucits Installation Complete Complete Complete Complete Complete Complete N/A N/A
water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-2 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A

Faucits Installation Will be Done at the Time of Customer Hand over

water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A 18-Oct-20
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-3 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A

Faucits Installation Will be Done at the Time of Customer Hand over

water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A Complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A Complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A

Level-4
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-4 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A

Faucits Installation Will be Done at the Time of Customer Hand over

water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-5 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A

Will be Done at the Time of Customer Hand over


Faucits Installation
water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-6 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A

Faucits Installation Will be Done at the Time of Customer Hand over


water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-7 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A
Will be Done at the Time of Customer Hand over
Faucits Installation
water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete Complete Complete Complete Complete N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-8 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A
Will be Done at the Time of Customer Hand over
Faucits Installation
water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector Complete Complete 2-Nov-20 2-Nov-20 Complete 2-Nov-20 N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete Complete Complete Complete N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-9 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A

Faucits Installation Will be Done at the Time of Customer Hand over


water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20

FLOOR ITEM Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Meter Room LIFT LOBBY REMARKS

Air Devices Complete Complete Complete Complete Complete Complete N/A complete
A/C Installation Complete Complete Complete Complete Complete Complete N/A complete
Motorized Fire Damper N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
BMS System N/A N/A N/A N/A N/A N/A N/A 20-Nov-20 Material not Procured
Mulitgas Detector 2-Nov-20 2-Nov-20 2-Nov-20 2-Nov-20 2-Nov-20 2-Nov-20 N/A N/A
Push Button Complete Complete Complete Complete Complete Complete N/A N/A
solenoid connection with FACP Complete Complete Complete 2-Nov-20 2-Nov-20 2-Nov-20 N/A N/A
Gas Meter Installation N/A N/A N/A N/A N/A N/A 20-Nov-20 N/A Material at site
Sprinkler Installation Not in Our Scope
Level-10 ZCV Installation Not in Our Scope
Fire Hose Cabinet Installation Not in Our Scope
Gas Water Heater Complete Complete Complete Complete Complete Complete N/A N/A
Fixture Installation Complete Complete Complete Complete Complete Complete N/A N/A
Faucits Installation Will be Done at the Time of Customer Hand over

water meter Installation N/A N/A N/A N/A N/A N/A Complete N/A
PRV Installation N/A N/A N/A N/A N/A N/A Complete N/A
Garbage Chute Doors Installation N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
Garbage Chute sprinkler & jet Spray N/A N/A N/A N/A N/A N/A N/A 30-Nov-20
31-Oct-20
REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured
Material at site

REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured

Material at site
REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured

Material at site

REMARKS

Material not Procured


Material not Procured

Material at site
ITEM WISE COMPLETION STATUS OF TOWER 3 (ELECTRICAL & COMMUNICATION WORKS)

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby Date of
Completion
Electrical Power Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Site office for Completed N/A
Structured Cabling Completed Completed Completed Completed
contractor Completed Completed
Level-1 Will be Install at the time of
Audio Intercom Will be Install at the time of Handing over Handing over

CATV Completed Completed Completed Completed Completed N/A

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-2
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed Completed

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-3
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed Completed

Will be Install at
CCTV the time of
Handing over
N/A N/A N/A N/A N/A N/A
Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-4
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed Completed

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-5
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed Completed

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-6
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed 25-Oct-20

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting Completed Completed Completed Completed Completed Completed Completed
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-7
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed 25-Oct-20

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-8
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed 25-Oct-20

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed Completed
Electrical Lighting 24-Oct-20 24-Oct-20 24-Oct-20 24-Oct-20 24-Oct-20 24-Oct-20 24-Oct-20
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System Completed Completed Completed Completed Completed Completed N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-9
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed 25-Oct-20

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over

Floor Item Aprtment-B Aprtment-C Aprtment-D Aprtment-E Aprtment-F Aprtment-G Lift Lobby
Electrical Power Completed Completed Completed Completed Completed Completed 25-Oct-20
Electrical Lighting 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20 25-Oct-20
Fire Alarm System Completed Completed Completed Completed Completed Completed Completed
Gas Detection System 23-Oct-20 23-Oct-20 23-Oct-20 23-Oct-20 23-Oct-20 23-Oct-20 N/A
Structured Cabling Completed Completed Completed Completed Completed Completed Completed
Level-10
Audio Intercom Will be Install at the time of Handing over
CATV Completed Completed Completed Completed Completed Completed 25-Oct-20

Will be Install at
CCTV N/A N/A N/A N/A N/A N/A the time of
Handing over
CATION WORKS)
Date: 31-Oct-2020
Remarks

Mirror ligths in bathrooms and lights in servce rooms not fixed

Remarks

Mirror ligths in bathrooms and lights in servce rooms not fixed

Remarks

Mirror ligths in bathrooms and lights in servce rooms not fixed

Will be Install at the time of Handing over

Remarks

Mirror ligths in bathrooms and lights in servce rooms not fixed

Remarks
Termination of incoming cables for DBs in El. Room not done
Mirror Light Not Install

Termination in rack not done

Remarks
Termination of incoming cables for DBs in El. Room not done
Mirror Light Not Install

Termination in rack not done


Will be Install at the time of Handing over
Will be Install at the time of Handing over

Only cables pulled


Remarks
Termination of incoming cables for DBs in El. Room not done
Mirror Light Not Install

Termination in rack not done

Remarks

Termination is not Done yet.

Remarks
Termination of incoming cables for DBs in El. Room not done

Conduiting, cabling and devices installation not done

Remarks
Termination of incoming cables for DBs in El. Room not done

Conduiting, cabling and devices installation not done


Termination in IT rack not done