Construction stage % of Current stage 1st Current stage Current stage
completion Inspection 2nd Inspection 3rd Inspection Preliminaries, sub walling and slab 15 15 15 15 15 15 15 casting D.P.C. and G.F. walling to shuttering 20 20 20 20 20 20 20 level Shuttering reinforcement, conduits, slab cast parapet and finishes material. OR
Timber roof frames, polythene 15 0 7.5 10.5 10 10
roofed over Ceiling brandering, door window 15 0 13.5 7 7.5 7.5 and cupboard frames and electrical conduit fixed Water piping fixed and plastered 5 0 5 5 5 out Ceiling board, plumbing carpentry 10 0 0 8 5 5 septic tank, manholes and window panes. Electrical reticulation, electrical 5 2 2 2 fitting and main services line. Sanitary, Kitchen fitments, filing, 8 0 0 0 3 floor finishes and skirting. Painting weathering final touches 7 3 3 3 3.5 and access road Certificate of occupation.
Total 100% 40% 64% 45.5% 68%
INTERIM VALUATION SCHEDULE
DOUBLE STOREY BUILDING
Construction stage % of Current stage 1st Current stage Current stage
completion Inspection 2nd Inspection 3rd Inspection Preliminaries, sub walling and slab 15 15 casting D.P.C. and G.F. walling to shuttering 10 10 level Shuttering reinforcement, conduits, 5 5
Slab cast 10 10
First floor walling to plate/ring 10 10
beam. Shuttering reinforcement, conduits, slab cast parapet and finishes material. OR
Timber roof frames, polythene 15 15
roofed over Ceiling brandering, door window 10 2.5 and cupboard frames and electrical conduit fixed Water piping fixed and plastered 5 0 out Ceiling board, plumbing carpentry 5 0 septic tank, manholes and window panes. Electrical reticulation, electrical 5 0 fitting and main services line. Sanitary, Kitchen fitments, filing, 5 0 floor finishes and skirting. Painting weathering final touches 5 0 and access road Certificate of occupation. -
Total 100% 68
INTERIM VALUATION SCHEDULE
TRIPLE STOREY BUILDING Construction stage % of Current stage 1st Current stage Current stage completion Inspection 2nd Inspection 3rd Inspection Preliminaries, sub walling and slab 15 15 casting D.P.C. and G.F. walling to shuttering 7 7 level Shuttering reinforcement, conduits, 3 3
Slab cast 7 7
First floor walling to ring beam. 5 5
Shuttering reinforcement, conduits, 3 3
Slab cast 7 7
Second floor walling to plate 5 5
level/ring beam. Shuttering reinforcement, with conduits, slab cast parapet and finishes material. OR
Timber roof frames, polythene 18 18
roofed over Ceiling brandering, door window 5 2.5 and cupboard frames and electrical conduit fixed Water piping fixed and plastered 5 2 out Ceiling board, plumbing carpentry 5 2.5 septic tank, manholes and window panes. Electrical reticulation, electrical 5 4.75 fitting and main services line. Sanitary, Kitchen fitments, filing, 5 0.25 floor finishes and skirting. Painting weathering final touches 5 0.5 and access road Certificate of occupation. -
Total 100% 82.5%
INTERIM VALUATION SCHEDULE
FOUR STOREY BUILDING Construction stage % of Current stage 1st Current stage Current stage 3rd completion Inspection 2nd Inspection Inspection Preliminaries 2 Foundation 12 Ground floor slab 4 Ground floor walling 3 1st Floor slab 4 1st Floor walling 3 2nd Floor slab 4 2nd Floor walling 3 3rd Floor slab 4 3rd Floor walling 3 Roofing 8 Doors, Windows & Glazing Ground floor 3 1st Floor 3 2nd Floor 3 3rd Floor 3 Floor Finishes Ground floor 1.5 1st Floor 1.5 2nd Floor 1.5 3rd Floor 1.5 Wall Finishes Ground floor 1.5 1st Floor 1.5 2nd Floor 1.5 3rd Floor 1.5 Ceiling Ground floor 1.5 1st Floor 1.5 2nd Floor 1.5 3rd Floor 1.5 Painting 4 Sanitary & Other Fittings 5 Plumbing & Drainage 5 Wiring, Conduit & Installation 5 General Making Good 1 Total 100%