Admin Building 8th Fl

Activity No
Civil & Plumbing- Demolish and Chipping
1
2
3
Plumbing - Installation Works
4
5
6
7
8
9
Civil - MASON WORK
10
11
12
13
14
15
16
17
18
19
20
21
MECHANICAL WORK
1
2
3
ELECTRICAL WORK
1
2
3
4
5

Note: This scheudle is adapted after the procurement of sufficient material in BOM.
Admin Building 8th Floor Toil
Task Description
& Plumbing- Demolish and Chipping
Dismentle of Urinal, Wash Basin fixture, and all kind of Plumbing fixtures.
Dismentle of Phenolic Partition, wall Mirror, wash basin counter top, Janitorial Wooden door.
Demolish and Chipping of wall & floor tile and wall chipping of related plumbing work.
bing - Installation Works
Close and Re-route of Hot and Cold Potable water line all plumbing fixtures.
Installation of New Line for Handicape Chair & Urinal
Installation of Sanitary, Drain & Vent Pipe Line.
installation of Urinal and all Plumbing accessories Fixture.
installation of Handicape WC With Grab Bar.
Installation of Wash Basin Mixer.
MASON WORK
Installation of New Gypsum wall for handicape toilet & Janitorial Room.
Installation of New CMU wall for Handicape toilet.
Installation of New Gypsum Ceiling in Handicape Toilet.
Fixing of Floor and Wall Tile in Handicape toilet.
Fixing of Floor and Wall Tile in Male toilet.
Installation of New Phenolic Partition in Male Toilet.(Third Party)
Installation of New Wooden Doors Janitorial and Handicape Toilet. (Third Party)
Installation of Wash Basin Mirror and Counter Top Male Toilet & Handicape Toilet. (Third Party)
Installation of Marble Counter in Male Toilet. (Third Party)
Installation of Wooden Decoration in Male Toilet. (Third Party)
Installation of New Glass Partition in front of Handicape Toilet. (Third Party)
Painting of Wall & Ceiling in Male Toilet and Handicape Toilet.
HANICAL WORK
Fabrication of the whole extension duct on the work shop.
Installation of the duct with diffuser inside the ceiling
Final comission by fixing the duct ceiling and volume damper positioning with air balance
TRICAL WORK
Removing all lights and switches
Removing the cables from switches to lights and EMT and flexible inside ceiling.
Installation of Metal Boxes with EMT pipes and EMT Flexible
Cable pulling for all lights and switches with testing and comissioning.
installation and termination of lights and switches with tagging of cables and switches.

: This scheudle is adapted after the procurement of sufficient material in BOM.


th Floor Toilet Renovaition schedule
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Duration Manpower

3
1

3
2
3
6
8
2

2
3
4

0
1
1

1
1
1
1
1
28 29 30 31 1 2 3 4 5