You are on page 1of 10

SRI VAIBHAVA SAI H

Sr No
A
1
2
3
4
5
6
7
8
9
10
11
12
13

14
15
16
17
18

19
20
21
22
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
C
18
19
20
21
22
23
24
25
26
27
28
D
29
30
31
32
33
34
35
E
1
2
3
4
5
6
F
1
2
3
4
5
6
7
8
9
10
11
12
G
1
2
3
4
5
6
H
1
2
3
4
5
6
7
8
9

10
I
1
2
3
4
5
6
7
8
#
1
2

5
6
SRI VAIBHAVA SAI HOMES PVT LTD

Schedule & Scope of Work


Structure Part
Site Surveying (Company's Scope)
Marking & Grid lines Fixing (Company & Contractor Scope)
Excavation Work & Dressing work (Company's Scope)
Anti Termite Treatment before Footing
PCC for Footings
Marking for Columns
Footings Barbinding, Shuttering & Concrete work
Column Marking with Starter laying above Footings/Pedastaals
Columns upto Plinth Beam Bottam work
Back filling & Soil compaction work(Company's Scope)
Anti Termite Treatment Chemical Laying on Bottam of Plinth PCC
Plinth beam PCC & Beams Marking , Form work, Concrete work
Back filling & (Company's Scope)
Soil compaction work inside of Plinth Beams
Plinth Floor PCC work
Columns upto Staircase Midlanding level & Staircase waist slab completion
Columns Upto GF Beam bottam level
Remainig Typical Columns & Slabs for all Floors(With includes Shuttering, Barbinding & Concrete work)
Cleaning and maintaining the work place and keeping all materials in proper placement at the work site strictly maintain by contractor
Scaffolding works
Above Terrace Slab Structure Part work
Staircase Headroom Columns & Slabs as per Drawing
Lift Head room Columns & Slabs as per Drawing
Water Tanks Columns upto Bottam Slab, Tank Bottam Slab, 9'' RCC Walls & Top Covered Slabs.
Embedded Items like GI Flaunges, Sleeves fixing in Watertanks
Super Structure Part
Hacking & Ceiling Plaster Work
Brick work Layout & Brick work with 02 No of RCC Beds
Door Frames fixing along with Brick Work laying
Wall Electrical Conduits Packing with Chicken Mesh
Columns, Beams & Brick work Joining areas Chicken Mesh fixing work.
Bull Mark Laying & Internal Plaster with Spone Finish
Windows Edges finishing as per Template with accurate 90 deg. Angles at all four corners
RCC: Kitchen Platforms,Counters, Cup Boards Loft Slabs & Chajjas Work
Cup Boards inside RCC Planks with Finishing work
Cleaning & Maintain the Wooden Door Frames is Completely Contractors scope only.
External Plaster with 02 Coats Sponge/Smooth finish including Chicken Mesh fixing in Vertical & Horizantol at Beam & Columns junctions.
External Plaster Purpose wooden Scaffolding / Paranja Contractors Scope Only
Plumbing & Electrical Embedded items packing & Patch works
Toilet inside Ledge Wall Brick work & Plaster for Concealed Flush Tank (It will be Depend As per Plan)
Elevation Masonry works As per Drawing.
Flooring Touch Ups, Granite Counters Packings at Kitchen Platforms, Ledge walls & Staircase Waist Slabs Granite side Finishing work
Water Curing For Structure , Super Structure & Tiling Related Completely Contractor's Scope.
Cellar Level Works
Septic Tanks as per Drawing
Water Sumps as per Drawing
Compound Wall : PCC, RR Masonry, Beam Laying at Plinth Level , Brick Work & 02 Coats Plaster
Plumbing Related Manholes, Chambers Masonry Works.
Security Rooms, Power Rooms, DG Beds Making & Toilet Rooms as per Drawing
Transformer Yard Related Civil works As per Drawing
Main Gates Fixing Related all Civil Works
Compound wall Out Side Drain Brick Work & Plastering work with Cover Slabs
Planter Boxes & Kerb Walls Civil Masonry works as per Drawing.
Project Entrance Ramps, Staircases works As per Drawings
Cellar & Drive ways finishing with Screed Concrete or VDF or Parking Tiles as per Drawing. (Which would be Applicable at the time of Execution)
Terrace Level Works
Parapit Wall Brick Work & Plaster
Staircase Head Room Civil Masonry Works
Lift Head room Civil Masonry Works
Water Tank Internal Water proof Plaster & Tank inside Waterproof Screed Concrete Works
Water Tank External 02 Coats Plaster
Terrace Floor Waterproof Screed Concrete work
Plumbing Pipes Related Pedastals Making & Finishing work
Water Proof Works
Toilets Inside Dead Mortar Cleaning
Bore Packings with GP2
Applying of Brush Bond & Latex 100 Chemical
1st coat of Water proof plaster with Hanch Concrete finish
After Plumbing lines Brick Batters Laying with Water proof Cement Mortar
above Cement Screed Concrete as per Specification
Tiling & Flooring Works
Toilets Ceramic Wall Dado with plaster laying upto 7 feet height along with utilities wall cladding
Toilets , Balconies & Utilities Floor laying with 03 mm Spacer joints with epoxy grouting
Flats inside 2'x2' Vetrified Laying with Paper Joints & grouting
Kitchen Platforms Granite Counters laying & Edge Polish as per Specification
Granite Cutting inside of Kitchen Platform & Edge finishing according to the SS Sink
Gas hole to be Provided
2' Height Kitchen Dado Ceramic tile Laying work as per Specification
Utilies, Balconies & Corridors Ledge wall Above Granite Laying & Finishing work as per Specification.
Staircase Treads, Risers, Mid Landing & Skirtings Laying & Finishing work as per Spefiction.
Corridors Area Granite / Anti Skid Tiles Laying & Finishing work as per Specification (Flooring Design with Granite Borders / Tiles As specified)
All Granite Edge finish with Half Round polish or unless otherwise specified
TV Panel Wall Tile Cladding as per Specification
Painting Works
Internal Painting Works : 02 Coats of Putty, Papering , Primer & 02 Coats of Emulsion Paint.
External Painting Works : 02 Coats Putty or Texture Finish as per Specification & Primer with 02 Coats of Emulsion Paint.
Door Frames & Shutters : Applying of Wood Putty , Primer & 02 Coats of Enamul Painting
Grills & MS Gates Painting As applicable as per Specification.
Painting Related Wooden Scaffolding/Paranja contractors Scope Only
Painting Material & Emery or Disc Papers material supplied by Company & Remaing material like Brush , Rollers Contractors scope only.
Electrical Works
Slab Pipe Laying (Conduiting)
Walls Grew Cutting
Walls Pipe Laying & Board Fixing
TV, Net, Telephone Pipe Laing(Ground)
Internal Wiring
Switch Board Fixing
Mains Running & DB Fixing
Flats Final Testing & Handing over
Panel Board fixing, Cable Connections, DG Cable Connections, Watchmen Room Connections, Lift Inside Complete Electrical Works, Motor Connection, Common Area Lightings,
Gate Lite Fixing, Earth Pits Connection All Complete Electrical Works with Complete Labour including Tools.
Complete Electrical Work would be Executed by According to Drawing only
Plumbing Works
PVC & CPVC Concealed Internal Works
Toilets Internal Plumbing concealed work
Outside SWR & Water Line Works
Head Rooms & Water Tank Connections
Soil Lines & Below Ground SWR Lines, Common Areas work
CP & Sanitary Fixing Works
Final Handing over Works
All Plumbing Work would be Executed as per Drawing only
Key Points
Measurement Shouldiebe
Terrace Level works considered
Water Slab Surface
Tanks, Staircase area
Head L*B (Physical
Rooms Measurement
& Lift Rooms only)
works should be Considered in 1st Slab Area only. For these works no Additional or Saparate Area
would not be considered.
Alignment, lining, leveling of every work activity should be perfect and joining of bricks and filling of gaps should be done with utmost care and cleaning of cement mortar on
door frames, window frames etc. should be done immediately as and when noticed irrespective of waiting till the closure of the work for the day
Cleaning and maintaining the work place and keeping all materials in proper placement at the work site strictly at the end of day’s work should be done by the contractor
Cleaning & Handing over to Customer