PJ-10040, DM STAFF ACCOODATION BUILDING

MEP WORKS STATUS TRACKING SHEE

FIRST FIX of works like Conduits on Floor


Sl No Building / Floor / Area
Electrical Tele/Data
Building - 1
Ground Floor
1 Flat No 01
2 Flat No 02 100% 100%
3 Flat No 03 100% 100%
4 Flat No 04
5 Flat No 05
6 Flat No 06
7 Flat No 07
8 Flat No 08
9 Flat No 09
10 Flat No 10
11 Main Corridor
12 Reception / Main Entrance
13 Entrance 2
14 Substation & LV Room 75%

BUILDING - 2
Ground Floor
15 Flat No 01
16 Flat No 02
17 Flat No 03
18 Flat No 04
19 Flat No 05
20 Flat No 06
21 Flat No 07
22 Flat No 08
23 Flat No 09
24 Flat No 10
25 Main Corridor
26 Reception / Main Entrance
27 Entrance 2
28 U/G Pump Room & WT Area 50%
29 Substation & LV Room 75%

BUILDING - 3
Ground Floor
30 Flat No 01
31 Flat No 02
32 Flat No 03
33 Flat No 04
34 Flat No 05
35 Flat No 06
36 Flat No 07
37 Flat No 08
38 Flat No 09
39 Flat No 10
40 Main Corridor
41 Reception / Main Entrance
42 Entrance 2
43 Substation & LV Room 75%
COODATION BUILDING ON PLOT NO 226 5458 AT AL TWAR FIRST
ATUS TRACKING SHEET - ELECTRICAL- as on 06.02.2017

of works like Conduits on Floor slab, Wall Chasing work, Back Box fixing, Conduit fixing on wall / floor etc
Intercom Fire Alarm CCTV SMATV

100% 100% 100% 100%


100% 100% 100% 100%
WAR FIRST
7

uit fixing on wall / floor etc


LPG System LCP

100% N/A
100% N/A
10040, DM STAFF ACCOODATION BUILDING ON PLOT NO 226 5458 AT AL TWA
MEP WORKS STATUS TRACKING SHEET - MECHANICAL- as on 06.02.2017

pex pipe laying


Wall Chasing

Wall Chasing

Wall Chasing
false ceiling
PPR above
pex elbow
Sl No Building / Floor / Area

fixing
Building - 1
Ground Floor
1 Flat No 01
2 Flat No 02
3 Flat No 03
4 Flat No 04
5 Flat No 05
6 Flat No 06
7 Flat No 07
8 Flat No 08
9 Flat No 09
10 Flat No 10
11 Main Corridor
12 Reception / Main Entrance
13 Entrance 2
14 Substation & LV Room 75%

BUILDING - 2
Ground Floor
15 Flat No 01
16 Flat No 02
17 Flat No 03
18 Flat No 04
19 Flat No 05
20 Flat No 06
21 Flat No 07
22 Flat No 08
23 Flat No 09
24 Flat No 10
25 Main Corridor
26 Reception / Main Entrance
27 Entrance 2
28 U/G Pump Room & WT Area 50%
29 Substation & LV Room 75%

BUILDING - 3
Ground Floor
30 Flat No 01
31 Flat No 02
32 Flat No 03
33 Flat No 04
34 Flat No 05
35 Flat No 06
36 Flat No 07
37 Flat No 08
38 Flat No 09
39 Flat No 10
40 Main Corridor
41 Reception / Main Entrance
42 Entrance 2
43 Substation & LV Room 75%
26 5458 AT AL TWAR FIRST
- as on 06.02.2017
Wall Chasing

Wall Chasing