You are on page 1of 3

FLOOR PROTECTION STATUS OF CREST-21

125 SQ.YRDS. 100 SQ.YRDS.


S.No. Location 6 7 8 9 10 11 12 13 74 75 76 77 78 79 80 81 82 83 84 85 86
1 Utility/Service S01
2 Staircase Lobby
Stilt Floor
3 Utility Store S02
4 Toilet-T01
5 Living/Dining S04
6 Passage Area
7 Toilet-T02 Upper Ground Floor
8 B01 & B02 Balcony
9 Kitchen Area S05
10 B02 & B03 Balcony
11 Passage Area
First Floor
12 Toilet-T03
13 Toilet-T02
14 Toilet-T04
15 Passage Area Second Floor
16 Accessible Terrace
17 Staircase Basement-SF
Total 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17

Tile work pending or either


Remarks being carried out
Tile work along with
protection found.
WIP Work in progress
FLOOR PROTECTION STATUS OF EVOKE-26
300 SQ.YRDS.
S.No. Location 22 23 24 25 26 27 28 29
1 Multipurpose Hall
2 Powder Room-T02
3 Toilet-T01 Basement
4 Service Utility S01(a)
5 Servant Room S01
6 Living/Dining S04
7 Foyer S03
8 Toilet-T04 Ground Floor
9 Toilet-T03
Remarks
10 Kitchen K01
11 B01 & B02 & B03 & B04 Balcony Tile/Italian work pending or either being carried out
12 Lobby S07 & Kitchen K02 Tile work along with protection found.
13 Toilet-T05 First Floor WIP Work in progress
14 Toilet-T06
15 Toilet-T07
16 Toilet-T08
17 Passage Area
18 Pantry K03 Second Floor
19 Balcony B05
20 Toilet-T09
21 Staircase Basement-SF
Total 18 20 20 20 20 20 19 21

220 SQ.YRDS.
S.No. Location 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
1 Multipurpose Hall
3 Toilet-T01
Basement
4 Service Utility S01
5 Servant Room S20
6 Living/Dining S03
7 Lobby S05
Ground Floor
8 Toilet-T02
10 Kitchen S04
11 B01 & B02 & B03 Balcony
12 Family Room S12
13 Lift Lobby S08 First Floor
14 Toilet-T04
15 Toilet-T03
16 Toilet-T05
17 Lobby S15
Second Floor
18 Pantry S16
19 Balcony B04
20 Toilet-T06
Third Floor
21 Lobby S19
22 Staircase Basement-SF
Total 16 17 17 17 17 17 16 15 16 19 18 17 19 19 17 17 17 17
ing or either being carried out
rk along with protection found.
Work in progress