You are on page 1of 4
LIANG CHI BIG SIZE COOLING TOWER ‘System: Use an alloy aluminum sprinkle head; require little or no head pressure and minimum maintenance. Inlet Louvers: Non-rusting PVC plastic mesh provides easy access to sump while preventing foreign objects from entering water basin. ximum dispersion of water and creates a roof FRP guaranteed low maintenance & long term 8. A large diameter outlet pipe draws a constant supply of cooled water from basin to serve the facility. ‘Optional extras available: 1. Drift Eliminator, minimizing drift loss to below 0.1% of circulating water. os ‘Mat, reducing noise from water droplets pouring down into the basin. i te PT LIANG CHI INDONESIA Head Office = ‘Surabaya : GRHA PRABA SAMANTA Top :62.91-0492096, e407880 Te i 4. Daan Moget Km, 12 No. 9 Jakarta 11790 Fax. :62-31-8497438, 8497433 Fax : 62-22-6124001, 6124002 Email :lei@sby.oas, Email : oasbdg@rad.net.id Telp : 62-21 6193099, 6193212, 6196349 ese Z (6196962, 6195963, 54380039 (Hunting) . Semarang : ere 162: (uml) « Telp-:62-24-7619899, 7611102 Telp. : 62-61-7862129 Fox : 62-21 6195341 Ee eee Fax: 62-61-7861960, 7861940 Email: liangchiindonesia@oas.co.id Email :lolamg@telkom.ne: Email: seltechi@indosat.net.id hengky @seltech.co.id

You might also like