Professional Documents
Culture Documents
4
6
Installing a PXB800 Ancillary Note: Disconnect the earthing wire before Fig. 1). Retain the nuts and washers to secure
you fully remove the door (item 3 in Fig. 1). the zonal display.
Expansion Box
6 Attach the PXB800 ancillary expansion box to 4 The zonal display is attached to the door by
the secured mounting frame. Engage the 3 engaging the studs on the inside of the door
The PXB800 is supplied with a mounting frame hooks at the top of the housing with the slots with holes in the protruding parts on the top
that is separated from the housing. The neces- (item 3 in Fig. 2) in the mounting frame. and the bottom of the zonal display. Ensure
sary fixings are supplied also. Attach the 7 Secure the housing with the supplied screws the display is attached the correct way up.
mounting frame to a PROFILE panel or to a (item 9 in Fig. 1). Use sufficient torque when 5 Using the nuts and washers removed in step
PBB801 battery box using locating hooks. tightening the screws to ensure all fixings are 1 3 to secure the zonal display to the door using
secure. sufficient torque.
The mounting frame can be rotated to fix the 8 The breakouts in the PXB800 housing align 6 Refit the door by engaging the bottom of the
PXB800 either above or below the fire alarm with the breakouts in the panel enclosure or door with the slots in the housing. Reconnect
control panel or the housing to which it is being housing (item 2 in Fig. 1). Route all cables the earth cable to the door and press the door
attached. between the housings using the breakouts. closed.
Fit the supplied grommets to prevent cable
To install the PXB800 ancillary expansion box, chafe. 4
complete these steps: 2 Installing Modules
9 Fit the supplied earth link cable between the
two housings using the supplied nut and Mounting holes are provided to secure ancillary
washers (refer to Fig. 3). Use the arrange- Fig. 3: Fitting the Earth link cable between enclosures modules to the plate attached to the back of the
Ensure that the PXB800 ancillary ment of the nut and washer already fitted in 1 – Grommet PXB800 housing (refer to item 11 in Fig. 1).
expansion box is level when you the PXB800 as a guide. 2 – PXB800 housing There are holes in arrangements to match the
fit it. 3 – Other housing (another PX type shown) various modules that can be fitted in the hous-
4 – Earth link cable ing.
1
1 Engage the locating hooks on the mounting
frame with the mating part on the panel or the Fit the modules by either using press-fit plastic
Installing the PZ4x and PZ8x stand-offs fitted to plain holes or pillars screwed
housing mounting frame (refer to item 1 in
Fig. 2). 3
Zonal Display into the threaded holes in the modules fixing
2 Use the mounting frame as a template for To fit the zonal display to the door of the plate and screws to attach the modules to the
marking the four required drill holes for the PXB800, complete these steps: pillars (refer to Fig. 4).
fixings (item 2 in Fig. 2). 1 Press down on the door spring catch and pull-
3 Drill holes in the four positions marked in step ing the door outwards (refer to item 6 in Fig.
Some third-party modules require DIN rail
2. Ensure that the drill holes are the correct 1) to remove the door of the PXB800 housing.
2 mounting. In this case, use screws to secure a
size and depth for the supplied fixings. Care should be taken as the earth link cable
length of DIN rail suitable for the quantity and
4 Secure the mounting frame in position with connecting the door to the housing is short.
type of module to the module fixing plate.
the locating hooks engaged between the 2 Disconnect the earth cable and remove the
PXB800 mounting frame and the housing it is Fig. 2: Mounting frame door (item 3 in Fig. 1). The fitting of modules is made easier by
being fixed to. 1 – Mounting frame locating hooks 3 Remove the nuts and washers securing the
2 – Mounting frame slots removing the door. See step 1 in the section
5 Press down the spring latch tab and pull the blanking piece bracket to the door. The entitled “Installing the PZ4x and PZ8x Zonal Dis-
3 – Drill hole locations bracket and blanking pieces are not needed to
top of the door outward to remove the door of play”.
the PXB800 (item 4 in Fig.1) mount the zonal display (items 5, 7, and 8 in
2/4 Fixing instructions Doc. version 1.0 Fixing instructions Doc. version 1.0 3/4