Prj Unit Q'ty U/price Amount A9B number
Budget HQ PO Hornsea2 EA 360 $ 130.00 $ 46,800.00
Fryslan EA 300 $ 130.00 $ 39,000.00
660 $ 85,800.00
1st PO
Hornsea2 EA 138 $ 83.45 $ 11,515.52
SHT
Fryslan EA 0 $ -
138 $ 11,515.52
Hornsea2 EA 44 $ 83.49 $ 3,673.56
GY
Fryslan EA 80 $ 76.27 $ 6,101.21
124 $ 9,774.76
REMAIN BUDGET (1) 398 $ 64,509.72
2nd PO
Hornsea2 EA 90 $ 103.35 $ 9,301.67 A9B10242837
SHT
Fryslan EA 12 $ 94.33 $ 1,131.93 A9B10267898
102 $ 10,433.60
REMAIN BUDGET (2) 296 $ 54,076.12
3rd PO
Hornsea2 EA 50 $ 78.02 $ 3,900.78 A9B102528849-01/02/03
SHT A9B102528849-04/05/06 &
Fryslan EA 56 $ 72.46 $ 4,057.62
A9B10267900-01
106 $ 7,958.40
REMAIN BUDGET (3) 190 $ 46,117.72
470 $ 39,682.28 $ 84.43
Storage feet situation
1 Purchase storage feet from SGRE Rentel 144 (Set)
2 We make more to store Hornsea 1 120 (Set)
3 Weight of 01 Set sotrage feet 1.0209 (ton) Prepared by : Tran Cong Minh
4 Weight of sotrage feet - approximate 269.5176
5 Refer Minh Viet price for 120 Sets VND 5,249,948,660.00
6 Price in USD per set $ 1,862 Date : 6 Jun. 20
7 Scrap price per set $ 306.3
8 Drilling cost per 05 time $ 780.0
9 Fit& weld round bar per time $ 660.0
10 Total additional cost to fill and drill the hole $ 1,440.0
11 Actual saving cost for 1 Set =(6)-(7)-(10) $ 115
12 Actual saving cost for 470 Sets in 2020 $ 54,245
Confirmed by : Nguyen The Kien
Date : 6 Jun. 20
Appendix - Worksheet: Saving cost for Improvement No .2
Issue No CSVN-PT-SC20-2
Issue Date
COST ESTIMATION Page
01 Oct.20
1 of 1
Project Name : Improvement for VESTAS LDST Project
Title : Using NCR steel plate to fabricate LDST's storage feet
* Report by team : Protech team
No Description Unit Quantity Unit price Amount Remark
Amount of material (in case purchase new material)
- Steel Plate 50mm KG 30960 $ 0.8 $ 24,768
- Steel Plate 43mm KG 6562 $ 0.8 $ 5,250
1
- Steel Plate 21mm KG 315 $ 0.7 $ 221
- Steel Plate 13mm KG 63 $ 0.7 $ 44
Total (1) $ 30,282
For 8 pcs of LDST's storage feet
Amount of NCR steel plate (in case treat it like scrap)
- Steel Plate 50mm ( reuse Beams of the old model) KG 30960 $ 0.4 $ 12,384
2 - Steel Plate 43mm KG 6562 $ 0.4 $ 2,625
- Steel Plate 21mm KG 315 $ 0.35 $ 110
- Steel Plate 13mm KG 63 $ 0.35 $ 22
Total (2) $ 15,141
Total amount difference ( Item 1- Item 2) $ 15,141
e : 01 Oct.20
Prepared by : Tran Quoc Dat Confirmed by : Vo Chau Danh
Issue No CSVN-PT-SC20-1 MH Saving when combine 2 skirts B1&B2 to be 1 skirt of project Vestas LDST 5T Rosow Enetrag
COST REPORT Issue Date 01 Jun.20
No Process MH Saving/section (hrs) Sec' Q'ty Total MH (hrs)
[for changes] Page 1 of 1
Project Name : VT_SP54889_44950556_Klinksberg Humberg PJ (LDST,Ger)_1T
1 Cutting 2.17 5 13.0
Change No (ECN/SD…) :
Change title : N/A 2 Bevelling 2.52 5 15.1
* Report by team : Protech team 3 Bending 1.32 5 7.9
No Description Unit Quantity Unit price Amount Remark
4 Lseam 1.25 5 7.5
Man hours
Black tower -man hour Hr 17.0 $ 6.0 $ 102 Refer Mr. VT Dat calculation 5 FU 1.53 5 9.2
1 NDT Service (VT/MT/UT) Hr 1.7 $ 6.0 $ 10 6 Cirseam 3.25 5 19.5
7 Complete 2.04 5 12.2
Material and Consumable Total 84.4
Steel weight reduction Ton 1.064 $ 690.0 $ 734 Refer Mr. WI Park' s MTO Note:
Oxygen gas consumable LS $ 34.5 $ 5.0 $ 173 Time at the table is just calculating by process only, not included other small processes
2 Eletric power KWh 19711 $ 0.09 $ 1,774 Lincoln Ideal arc fuction but also take time and waste our resources such as unloading steel plate, arrange steel
Welding wire KG 77.6 $ 1.3 $ 99 Welding concumable estimation plate, moving steel plate to bending 3090-CA, storage ... & consumable (Oxy, CO2, Gas,
Weding flux KG 100.8 $ 1.5 $ 148 Welding consumable...) if not combined
Grinding disk EA 5 $ 1.0 $ 5
Equipment / Facility / Tools
Crane 30T Hr 1 $ 15.0 $ 15 Handle from storage to cut-> bevel
3
->Roll-> >Long -. Fit-up
Late PO / Shipment
4 Reduce lead time for LDST's segment Hr 17
Others
Number of section increasing Sect. 1
5
xxxx
Title : Change weld bead shape from Concave to smooth transition weld shape
*Team : Protech
No Description Unit Quantity Unit price Amount
Date : 01 Jun. 20
Issue No
Issue Date
Page
Customer :
Change Date :
Remark
Date : 01 Jun.20
I. VESTAS MY 44951066 V136 82m_10 Towers+21 Bottom Sections, Terra Gen Project, USA
II - Purchasing Packages for VESTAS V164 9.5 MW Door shell and Cond Air Segment
CSWIND
4th Floor, Baekseok Daehak Building, 129-12, Dongseo-Daero,
Seobuk-Gu, Cheonan-Si, Choongcheongnam-Do, Korea 31109
Phone: +82-41-901-1800 | Fax: +82-41-901-1999 | www.cswind.com
For 1 CAS
No. Item Name Material Specifications Drawing No. QTY Thk Width Length 1 CAS QTY Thk
x x
[Pcs] [mm] [mm] [mm] [Ton] [Pcs] [mm]
1 COND. AIR SEGMENT EN10025-2 S355J2 CEV Max 0.43, EN10204 3.1 75957104 R0 1 65.0 x 2,000 x 2,565 2.091 1 65.00
III- Purchasing Packages for VESTAS 44950659 V150m- DS(Vestas ESJ2 Mexico project 26 Tower
CSWIND
4th Floor, Baekseok Daehak Building, 129-12, Dongseo-Daer
Seobuk-Gu, Cheonan-Si, Choongcheongnam-Do, Korea 3110
Phone: +82-41-901-1800 | Fax: +82-41-901-1999 | www.cswind
For 1 Segment
No. Item Name Material Specifications Drawing No. QTY Thk Width Length 1 S
x x
[Pcs] [mm] [mm] [mm]
1 DOOR SEGMENT EN10025-2 S355K2 CEV Max 0.43, EN10204 3.1 75953910_R00 1 90.0 x 2,930 x 2,073
Date : 12 Mar
Prepared by : Tran Co
Prepared by
Tran Cong Minh Confirmed Nguyen
b The Kien
ir Segment
, Dongseo-Daero,
-Do, Korea 31109
9 | www.cswind.com
Sum1 121.139
Diff1 -11.357
WIND
k Building, 129-12, Dongseo-Daero,
hoongcheongnam-Do, Korea 31109
: +82-41-901-1999 | www.cswind.com
For 2 Segments
QTY Thk Width Length 2 Segments 2 Segments
x x
[Pcs] [mm] [mm] [mm] [Ton] [Ton]
1 90.00 x 2,960 x 4,911 10.270 10.270
10.270 10.270
For 2 Segments
QTY Thk Width Length 2 Segments 2 Segments
x x
[Pcs] [mm] [mm] [mm] [Ton] [Ton]
1 90.00 x 2,960 x 4,911 10.270 10.270
10.270 10.270
Difference: 3.074
Total 21,579
Prepared by : Tran Cong Minh Confirmed by : Nguyen The Kien