SUMMARY COMPARISON PRICE OF TENDER 13 UNIT MV

ARCHI AND M/E WORKS

NO. DESCRIPTION VOLUME

I PRELIMINARIES 13.00 unit

II OMISSION ME UNDERGROUND PIPE & SPARING 13.00 unit

III ARCHITECT & ME WORKS


1 UNIT 32, 33
a. Franklyn Unit with Pool unit 32 & 33 2.00 unit
b. Omission Volume
- External Wall Plastering (168.05) m2
- External Wall Painting (168.05) m2
- Timber Strip fixed window Type MW-01 - nos
- 10mm thk fixed clear glass window Type GW-04 - nos
2 UNIT 35, 36, 37
a. Franklyn Unit with Pool unit 35, 36 & 37 3.00 unit
e. Omission Volume
- External Wall Plastering (284.90) m2
- External Wall Painting (284.90) m2
- Timber Strip fixed window Type MW-01 (1.00) nos
- 10mm thk fixed clear glass window Type GW-04 (1.00) nos
3 UNIT 38, 39
a. Franklyn Unit with Pool unit 38 & 39 2.00 unit
b. Omission Volume
- External Wall Plastering (234.50) m2
- External Wall Painting (234.50) m2
- Timber Strip fixed window Type MW-01 - nos
- 10mm thk fixed clear glass window Type GW-04 - nos
4 UNIT 50, 51
a. Franklyn Unit with Pool unit 50 & 51 2.00 unit
b. Omission Volume
- External Wall Plastering (234.50) m2
- External Wall Painting (234.50) m2
- Timber Strip fixed window Type MW-01 - nos
- 10mm thk fixed clear glass window Type GW-04 - nos
5 UNIT 52, 53
a. Franklyn Unit with Pool unit 52 & 53 2.00 unit
e. Omission Volume
- External Wall Plastering (234.50) m2
- External Wall Painting (234.50) m2
- Timber Strip fixed window Type MW-01 - nos
- 10mm thk fixed clear glass window Type GW-04 - nos
6 UNIT 107, 108
a. Franklyn Unit with Pool 2.00 unit
b. Omission Volume
- External Wall Plastering (254.70) m2
- External Wall Painting (254.70) m2
- Timber Strip fixed window Type MW-01 (2.00) nos
- 10mm thk fixed clear glass window Type GW-05 (2.00) nos
TOTAL 13.00 unit
ROUNDED
F TENDER 13 UNIT MV
ORKS

UNIT RATE SUM TOTAL

SGD 2,513.27 SGD 32,672.51 SGD 32,672.51

SGD 1,985.00 SGD 25,805.00 SGD (25,805.00)

SGD 207,721.59
SGD 104,959.00 SGD 209,918.00

SGD 8.94 SGD (1,502.37)


SGD 4.13 SGD (694.05)
SGD 480.00 SGD -
SGD 127.00 SGD -
SGD 310,546.36
SGD 104,959.00 SGD 314,877.00

SGD 8.94 SGD (2,547.01)


SGD 4.13 SGD (1,176.64)
SGD 480.00 SGD (480.00)
SGD 127.00 SGD (127.00)
SGD 206,853.09
SGD 104,959.00 SGD 209,918.00

SGD 8.94 SGD (2,096.43)


SGD 4.13 SGD (968.49)
SGD 480.00 SGD -
SGD 127.00 SGD -
SGD 206,853.09
SGD 104,959.00 SGD 209,918.00

SGD 8.94 SGD (2,096.43)


SGD 4.13 SGD (968.49)
SGD 480.00 SGD -
SGD 127.00 SGD -
SGD 206,853.09
SGD 104,959.00 SGD 209,918.00

SGD 8.94 SGD (2,096.43)


SGD 4.13 SGD (968.49)
SGD 480.00 SGD -
SGD 127.00 SGD -
SGD 205,375.07
SGD 104,959.00 SGD 209,918.00

SGD 8.94 SGD (2,277.02)


SGD 4.13 SGD (1,051.91)
SGD 480.00 SGD (960.00)
SGD 127.00 SGD (254.00)
SGD 1,351,069.79
SGD 1,351,000.00
RENCANA ANGGARAN PELAKSANAAN PEKERJAAN ARSITEK & ME 13 UNI
CURRENCY : S$ = Rp
NO DESCRIPTION UNIT

I PRELIMINARIES
1 Transport tukang Civil Jawa-Batam 20 org (PP) org
2 Transport tukang screed P' EKO Jawa-Batam 4 org (PP) org
3 Sewa rumah termasuk air dan listrik 1 unit selama 5 bulan (MDR) unit
4 Sewa rumah termasuk air dan listrik 1 unit selama 5 bulan (EKO) unit
5 Transport camp-proyek 27 org (PP) org
6 BBM Genset 50 KVA selama 5 bulan ltr
7 Sewa crane 20T selama 2 bulan unit
8 BBM crane 20T ltr
9 Asuransi Jamsostek ls
10 Asuransi CAR ls
11 Performance bond ls
12 Sewa scaffolding selama 3 bulan set
13 Alat bantu penerangan (kabel2, lampu dll) selama 5 bulan ls
14 Gaji harian proyek dan security 10 org selama 5 bulan org
15 Tunjangan makan, handphone & transport 8 org staff proyek org
16 Biaya kebersihan jalan bln
SUB TOTAL P
SUB TOTAL PRELIMINARIES +
II MATERIAL UTAMA CIVIL WORKS
1 Semen @ 5okg zak
2 Bata merah pcs
3 Pasir cuci m3
4 Mozzaik TSQ 344S lbr
5 Mozaik IS MIX 107 lbr
6 Semen putih @40kg zak
7 Pebble wash 5mm @ 25kg zak
8 Keramik white horse 30x30cm m2
9 Besi beton dia 10mm kg
10 Besi beton dia 8mm kg
11 AM 50 kg
12 AM 40 @ 25kg zak
13 AM 30 ltr
14 HCL @ 900ml klg
15 Dempul RJ kg
16 Transport mozzaik Jawa-Batam (Rp 500/lbr) lbr
17 Sealer waterbase ltr
18 Corner bead unit
SUB TOTAL MA
SUB TOTAL MATERIAL UTAMA +
III PEKERJAAN LAINNYA (BELUM ADA SPK)
1 Pemasangan sanitary ware unit
2 Supply & install floor drain nos
3 Supply & install roof drain nos
4 Supply & install clean out nos
5 Supply & install water heater nos
6 Supply & install water meter nos
7 Supply & install KWH meter nos
8 Supply & install Alarm Panel 4 zone ex pyrogard nos
9 Supply & install Alumunium Door SD-03 nos
10 Supply & install magnetic keylock system nos
11 Supply & install stainless steel swimming pool hand railing nos
12 Supply & install RWDP unit
13 Supply door & window ironmongeries unit
14 Supply Air Conditioner unit
15 Supply & install handle twisted wood with stainless steel unit
16 Lawn Depan unit
SUB TOTAL PEKER
SUB TOTAL PEKERJAAN LAINNYA +
IV SPK MANDOR
1 Terrazzo (material & upah), termasuk upah saja screed unit
2 White cement (material & upah), tdk termasuk screed unit
3 Upah saja pasang Mozzaik dinding & lantai + screed unit
4 Upah saja screed white cement unit
5 Upah saja pebble wash lantai utama termasuk screed unit
6 Upah saja pebble wash bordes & anak tangga termasuk screed unit
7 Upah saja screed dan acian waterproofing dak tangga & canopy unit
8 Upah mandor civil MV 32, 33 unit
9 Upah mandor civil MV 35, 36, 37 unit
10 Upah mandor civil MV 38, 39 unit
11 Upah mandor civil MV 50, 51 unit
12 Upah mandor civil MV 52, 53 unit
13 Upah mandor civil MV 107, 108 unit
14 Upah mandor finishing dak tangga (soffit) unit
SUB TOTA
SUB TOTAL SPK MANDOR +
V SUBCONT
1 Alumunium Door & Window (SRI INDAH) ls
2 Timber Door & Window (TARUMAS) ls
3 Ceiling (KACAMAS) ls
4 Painting (KARIMUN JAYA) ls
5 ME (SUKSES JAYA GEMILANG) ls
6 Waterproofing (SAPTA) ls
7 Staircase Railing (AHO) ls
8 Swimming Pool (CIPTAN) ls
9 AC (VIOLA JAYA) ls
SUB T
SUB TOTAL SUBCONT +
TOTAL
TOTAL OF COST (INCLU
CONTRACT 13 UNITS (RATE FOLLOW LA
PRO
PERCENTAGE OF PRO
ARSITEK & ME 13 UNIT VILLA MONTIGO
7,000
REAL COST
QTY RATE (S$) AMOUNT (S$)

20.00 157.14 3,142.86


4.00 157.14 628.57
1.00 714.29 714.29
1.00 714.29 714.29
75.00 77.14 5,785.71
6,250.00 1.21 7,589.29
1.00 5,714.29 5,714.29
1,200.00 1.21 1,457.14
1.00 1,050.00 1,050.00
1.00 2,100.00 2,100.00
1.00 2,100.00 2,100.00
650.00 11.57 7,521.43
1.00 2,000.00 2,000.00
10.00 1,500.00 15,000.00
8.00 428.57 3,428.57
5.00 142.86 714.29
SUB TOTAL PRELIMINARIES 59,660.71
TOTAL PRELIMINARIES + MARKUP 10% 65,626.79

7,599.80 7.14 54,284.29


567,372.00 0.06 32,421.26
957.19 32.00 30,630.08
6,398.60 3.43 21,938.06
4,232.80 2.71 11,489.03
731.90 14.00 10,246.60
1,125.80 15.00 16,887.00
114.40 12.50 1,430.00
10,227.10 1.05 10,738.46
2,503.80 1.10 2,754.18
278.20 2.14 596.14
76.96 24.29 1,869.03
465.01 7.14 3,321.50
126.10 4.29 540.43
436.80 2.00 873.60
10,631.40 0.07 759.39
145.47 6.00 872.82
13.00 485.00 6,305.00
SUB TOTAL MATERIAL UTAMA 207,956.85
OTAL MATERIAL UTAMA + MARKUP 15% 239,150.38

13.00 797.13 10,362.69


91.00 40.70 3,703.34
78.00 63.85 4,980.30
39.00 58.96 2,299.32
13.00 525.00 6,825.00
13.00 54.87 713.27
13.00 204.43 2,657.53
13.00 1,250.44 16,255.75
13.00 500.00 6,500.00
13.00 353.98 4,601.77
13.00 132.74 1,725.66
13.00 243.10 3,160.30
13.00 1,253.00 16,289.00
13.00 2,114.29 27,485.71
13.00 465.00 6,045.00
13.00 88.70 1,153.05
SUB TOTAL PEKERJAAN LAINNYA 114,757.68
AL PEKERJAAN LAINNYA + MARKUP 15% 131,971.33

13.00 5,330.71 69,299.28


13.00 438.36 5,698.72
13.00 637.29 8,284.71
13.00 77.36 1,005.65
13.00 671.55 8,730.19
13.00 1,046.00 13,598.00
13.00 448.00 5,824.00
2.00 11,979.14 23,958.29
3.00 17,846.86 53,540.57
2.00 11,732.29 23,464.57
2.00 11,732.29 23,464.57
2.00 11,732.29 23,464.57
2.00 11,657.29 23,314.57
13.00 173.35 2,253.57
SUB TOTAL SPK MANDOR 285,901.27
UB TOTAL SPK MANDOR + MARKUP 15% 328,786.46

1.00 50,864.67 50,864.67


1.00 211,051.86 211,051.86
1.00 30,859.66 30,859.66
1.00 28,937.20 28,937.20
1.00 141,450.27 141,450.27
1.00 11,961.07 11,961.07
1.00 8,465.48 8,465.48
1.00 25,844.00 25,844.00
1.00 6,685.71 6,685.71
SUB TOTAL SUBCONT 516,119.92
SUB TOTAL SUBCONT + MARKUP 13% 583,215.51
TOTAL OF REAL COST 1,184,396.44
TOTAL OF COST (INCLUDED MARKUP) 1,348,750.47
UNITS (RATE FOLLOW LAST CONTRACT) 1,351,000.00
PROFIT POTENTIAL 166,603.56
PERCENTAGE OF PROFIT POTENTIAL 12.33%
SURAT PERINTAH KERJA
NO : 001/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : YANTO
ALAMAT : BATAM
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : MENGERJAKAN PEKERJAAN FINISHING (DINDING, KERAMIK, CEILING, PO
(UNIT 32, 33) = 2 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
A BLOCKWALL AND WALL FINISHES
Pasangan bata merah termasuk kawat exmet / stek besi joint terhadap balok
A.1 dan kolom beton dan lintel / kolom praktis, pembersihan dan pasang
scaffolding untuk dinding luar dan dalam
Plester dan acian termasuk additive campuran air adukan anti crack,
A.2 alumunium corner bead pada sudut dinding, skonengan, pembersihan dan
pasang scaffolding
- Dinding Luar
- Dinding Dalam
Tambahan slab beton canopy master bathroom termasuk pasang stek besi dan
A.4
finishing
Tempat duduk beton di teras dak atap termasuk pasang stek besi (tidak di
A.5
finish)
B FLOOR FINISHES
B.6 Pasangan keramik lantai 300x300mm di maid dan store room
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian balok, kolom dan dinding slab tangga dan lainnya
C.3
pada ruangan tangga (exposed)
P SWIMMING POOL
Concrete bench pada drop lantai dan overflow kolam renang termasuk pasang
1
stek besi
OTHERS
1 Bantuan makan lembur
2 Bongkar scaffolding
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Transport tenaga dari jawa Rp 550.000/org/sekali jalan untuk 6 bulan ditanggung Jatim
4 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : DELAPAN PULUH TIGA JUTA DELAPAN RATUS LIMA PULUH EMPAT RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO YANTO
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 002/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : YANTO
ALAMAT : BATAM
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : MENGERJAKAN PEKERJAAN FINISHING (DINDING, KERAMIK, CEILING, PO
(UNIT 35, 36, 37) = 3 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
A BLOCKWALL AND WALL FINISHES
Pasangan bata merah termasuk kawat exmet / stek besi joint terhadap balok
A.1 dan kolom beton dan lintel / kolom praktis, pembersihan dan pasang
scaffolding untuk dinding luar dan dalam
Plester dan acian termasuk additive campuran air adukan anti crack,
A.2 alumunium corner bead pada sudut dinding, skonengan, pembersihan dan
pasang scaffolding
- Dinding Luar
- Dinding Dalam
Tambahan slab beton canopy master bathroom termasuk pasang stek besi dan
A.4
finishing
Tempat duduk beton di teras dak atap termasuk pasang stek besi (tidak di
A.5
finish)
B FLOOR FINISHES
B.6 Pasangan keramik lantai 300x300mm di maid dan store room
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian balok, kolom dan dinding slab tangga dan lainnya
C.3
pada ruangan tangga (exposed)
P SWIMMING POOL
Concrete bench pada drop lantai dan overflow kolam renang termasuk pasang
1
stek besi
OTHERS
1 Bantuan makan lembur
2 Bongkar scaffolding
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Transport tenaga dari jawa Rp 550.000/org/sekali jalan untuk 6 bulan ditanggung Jatim
4 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : SERATUS DUA PULUH EMPAT JUTA SEMBILAN RATUS DUA PULUH DELAPAN RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO YANTO
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 003/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : . . . . . . . . . . . . (MANDOR JAKARTA)
ALAMAT : JAKARTA
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : MENGERJAKAN PEKERJAAN FINISHING (DINDING, KERAMIK, CEILING, PO
(UNIT 38, 39) = 2 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
A BLOCKWALL AND WALL FINISHES
Pasangan bata merah termasuk kawat exmet / stek besi joint terhadap balok
A.1 dan kolom beton dan lintel / kolom praktis, pembersihan dan pasang
scaffolding untuk dinding luar dan dalam
Plester dan acian termasuk additive campuran air adukan anti crack,
A.2 alumunium corner bead pada sudut dinding, skonengan, pembersihan dan
pasang scaffolding
- Dinding Luar
- Dinding Dalam
Tambahan slab beton canopy master bathroom termasuk pasang stek besi dan
A.4
finishing
Tempat duduk beton di teras dak atap termasuk pasang stek besi (tidak di
A.5
finish)
B FLOOR FINISHES
B.6 Pasangan keramik lantai 300x300mm di maid dan store room
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian balok, kolom dan dinding slab tangga dan lainnya
C.3
pada ruangan tangga (exposed)
P SWIMMING POOL
Concrete bench pada drop lantai dan overflow kolam renang termasuk pasang
1
stek besi
OTHERS
1 Bantuan makan lembur
2 Bongkar scaffolding
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Transport tenaga dari jawa Rp 550.000/org/sekali jalan untuk 6 bulan ditanggung Jatim
4 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : DELAPAN PULUH DUA JUTA SERATUS DUA PULUH ENAM RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO ............
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 004/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : . . . . . . . . . . . . . (MANDOR JAKARTA)
ALAMAT : JAKARTA
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : MENGERJAKAN PEKERJAAN FINISHING (DINDING, KERAMIK, CEILING, PO
(UNIT 50, 51) = 2 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
A BLOCKWALL AND WALL FINISHES
Pasangan bata merah termasuk kawat exmet / stek besi joint terhadap balok
A.1 dan kolom beton dan lintel / kolom praktis, pembersihan dan pasang
scaffolding untuk dinding luar dan dalam
Plester dan acian termasuk additive campuran air adukan anti crack,
A.2 alumunium corner bead pada sudut dinding, skonengan, pembersihan dan
pasang scaffolding
- Dinding Luar
- Dinding Dalam
Tambahan slab beton canopy master bathroom termasuk pasang stek besi dan
A.4
finishing
Tempat duduk beton di teras dak atap termasuk pasang stek besi (tidak di
A.5
finish)
B FLOOR FINISHES
B.6 Pasangan keramik lantai 300x300mm di maid dan store room
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian balok, kolom dan dinding slab tangga dan lainnya
C.3
pada ruangan tangga (exposed)
P SWIMMING POOL
Concrete bench pada drop lantai dan overflow kolam renang termasuk pasang
1
stek besi
OTHERS
1 Bantuan makan lembur
2 Bongkar scaffolding
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Transport tenaga dari jawa Rp 550.000/org/sekali jalan untuk 6 bulan ditanggung Jatim
4 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : DELAPAN PULUH DUA JUTA SERATUS DUA PULUH ENAM RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO ..............
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER
(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 005/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : . . . . . . . . . . . . (MANDOR JAKARTA)
ALAMAT : JAKARTA
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : MENGERJAKAN PEKERJAAN FINISHING (DINDING, KERAMIK, CEILING, PO
(UNIT 52, 53) = 2 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
A BLOCKWALL AND WALL FINISHES
Pasangan bata merah termasuk kawat exmet / stek besi joint terhadap balok
A.1 dan kolom beton dan lintel / kolom praktis, pembersihan dan pasang
scaffolding untuk dinding luar dan dalam
Plester dan acian termasuk additive campuran air adukan anti crack,
A.2 alumunium corner bead pada sudut dinding, skonengan, pembersihan dan
pasang scaffolding
- Dinding Luar
- Dinding Dalam
Tambahan slab beton canopy master bathroom termasuk pasang stek besi dan
A.4
finishing
Tempat duduk beton di teras dak atap termasuk pasang stek besi (tidak di
A.5
finish)
B FLOOR FINISHES
B.6 Pasangan keramik lantai 300x300mm di maid dan store room
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian balok, kolom dan dinding slab tangga dan lainnya
C.3
pada ruangan tangga (exposed)
P SWIMMING POOL
Concrete bench pada drop lantai dan overflow kolam renang termasuk pasang
1
stek besi
OTHERS
1 Bantuan makan lembur
2 Bongkar scaffolding
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Transport tenaga dari jawa Rp 550.000/org/sekali jalan untuk 6 bulan ditanggung Jatim
4 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : DELAPAN PULUH DUA JUTA SERATUS DUA PULUH ENAM RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO .............
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 006/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : YANTO
ALAMAT : BATAM
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : MENGERJAKAN PEKERJAAN FINISHING (DINDING, KERAMIK, CEILING, PO
(UNIT 107, 108) = 2 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
A BLOCKWALL AND WALL FINISHES
Pasangan bata merah termasuk kawat exmet / stek besi joint terhadap balok
A.1 dan kolom beton dan lintel / kolom praktis, pembersihan dan pasang
scaffolding untuk dinding luar dan dalam
Plester dan acian termasuk additive campuran air adukan anti crack,
A.2 alumunium corner bead pada sudut dinding, skonengan, pembersihan dan
pasang scaffolding
- Dinding Luar
- Dinding Dalam
Tambahan slab beton canopy master bathroom termasuk pasang stek besi dan
A.4
finishing
Tempat duduk beton di teras dak atap termasuk pasang stek besi (tidak di
A.5
finish)
B FLOOR FINISHES
B.6 Pasangan keramik lantai 300x300mm di maid dan store room
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian balok, kolom dan dinding slab tangga dan lainnya
C.3
pada ruangan tangga (exposed)
P SWIMMING POOL
Concrete bench pada drop lantai dan overflow kolam renang termasuk pasang
1
stek besi
OTHERS
1 Bantuan makan lembur
2 Bongkar scaffolding
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Transport tenaga dari jawa Rp 550.000/org/sekali jalan untuk 6 bulan ditanggung Jatim
4 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : DELAPAN PULUH SATU JUTA ENAM RATUS SATU RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO YANTO
(2) PELAKSANA (1) MANDOR
IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 007/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : BAHRAIN
ALAMAT : BREBES
JABATAN : MANDOR BORONG UPAH
: MENGERJAKAN PEKERJAAN FINISHING SOFFIT DAK TUTUP TANGGA, DAK B
KEPERLUAN
DINDING TEPI ANAK TANGGA (PLESTERAN, ACIAN, DEMPUL DAN SEALER)
(UNIT 32 S/D 53 & 107, 108) = 13 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
CEILING / CONCRETE SURFACE FINISHES (TIDAK TERMASUK DAK
C
TUTUP TANGGA, SLAB DAN BORDES TANGGA
Finishing plesteran / acian / dempul / sealer dak tutup tangga, dak bordes, dak
C.3
anak tangga dan dinding tepi anak tangga (exposed)
Dak bordes Lt. 1, dak anak tangga, dinding anak tangga dari Lt.1 ke Bordes Lt.
a
1 (tidak termasuk balok dan kolom struktur)
b Dak dan balok Lt. 2 tangga (tidak termasuk balok dan kolom struktur)
Dak bordes Lt. 2, dak anak tangga, dinding anak tangga dari Lt.2 ke Bordes Lt.
c
2 (tidak termasuk balok dan kolom struktur)
Dak & dinding anak tangga dari bordes Lt.2 ke Lt. 3 tangga, dan dan balok Lt. 3
d
tangga (tidak termasuk balok dan kolom struktur)
e Dak tutup tangga (tidak termasuk balok dan kolom struktur)
f Dak canopy entrance (sisi bawah saja)
OTHERS
1 Bantuan makan lembur
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : LIMA BELAS JUTA TUJUH RATUS TUJUH PULUH LIMA RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO WARNA
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 008/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : YANTO
ALAMAT : BATAM
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : PEKERJAAN SCREED DAN ACIAN WATERPROOFING DAK TANGGA & CANOP
(UNIT 32 S/D 37 & 107, 108) = 7 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
Screed dan acian langsung dak atas tangga dan canopy beton, termasuk
perapihan kelilingnya dan pengetesan rendaman waterproofing
1 Unit 32, 33
2 Unit 35, 36, 37
3 Unit 107, 108
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : TIGA JUTA SERATUS TIGA PULUH ENAM RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO YANTO
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER

SURAT PERINTAH KERJA


NO : 009/MDR/MONTIGO/ARCHI & ME 13 UNITS VILLA/NONGSA

PROYEK : MONTIGO RESORTS


BAGIAN : ARCHI & ME WORKS - 13 UNITS VILLA
LOKASI : NONGSA, BATAM

DENGAN INI KAMI TUGASKAN KEPADA :


NAMA : . . . . . . . . . (MANDOR JAKARTA)
ALAMAT : JAKARTA
JABATAN : MANDOR BORONG UPAH
KEPERLUAN : PEKERJAAN SCREED DAN ACIAN WATERPROOFING DAK TANGGA & CANOP
(UNIT 38 S/D 53) = 6 UNIT
NO. NO.
ITEM PEKERJAAN
BQ URUT
Screed dan acian langsung dak atas tangga dan canopy beton, termasuk
perapihan kelilingnya dan pengetesan rendaman waterproofing
1 Unit 38, 39
2 Unit 50, 51
3 Unit 52, 53
GRAND TOTAL O
DIBU
CATATAN :
1 Mandor bertanggung jawab atas Pembersihan sampah bangunan sampai mengumpulkan diluar bangun
2 Bantuan Sewa Tempat tinggal Rp 700.000/bulan/rumah termasuk listrik & air (kap satu rumah
3 Mandor harus bersedia lembur sesuai kebutuhan lapangan dan segala sesuatu biaya akibat lembur sud
TERBILANG : DUA JUTA ENAM RATUS DELAPAN PULUH DELAPAN RIBU RUPIAH

PEMBERI TUGAS YANG MENERIMA TUGAS

SUMARNO .......
(2) PELAKSANA (1) MANDOR

IR. ARIAHADIE
(3) SITE ENG. (4) SITE MANAGER

(9) DIREKTUR PT
IR. DANI H. TARIGAN
IR. CAROLUS BM (6) PROJECT COORDINATOR
(5) PROJECT MANAGER
H KERJA
UNITS VILLA/NONGSA/IV/11

AMIK, CEILING, POOL, DLL)


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 970.40 30,000.0 29,112,000

m2 493.95 26,000.0 12,842,700


m2 1,278.60 22,500.0 28,768,500
unit 2.00 600,000.0 1,200,000

unit 2.00 750,000.0 1,500,000


-
m2 16.00 25,000.0 400,000
-

m2 112.51 22,500.0 2,531,475


-

unit 2.00 750,000.0 1,500,000


-
unit 2.00 1,000,000.0 2,000,000
unit 2.00 2,000,000.0 4,000,000
GRAND TOTAL OF COST 83,854,675
DIBULATKAN 83,854,000

umpulkan diluar bangunan


kap satu rumah ±25 org)

biaya akibat lembur sudah termasuk didalam harga


DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

AMIK, CEILING, POOL, DLL)


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 1,455.60 30,000.0 43,668,000


-

m2 708.10 26,000.0 18,410,600


m2 1,917.90 22,500.0 43,152,750
unit 3.00 600,000.0 1,800,000

unit 3.00 750,000.0 2,250,000


-
m2 24.00 25,000.0 600,000
-

m2 168.77 22,500.0 3,797,213


-

unit 3.00 750,000.0 2,250,000


-
unit 3.00 1,000,000.0 3,000,000
unit 3.00 2,000,000.0 6,000,000
GRAND TOTAL OF COST 124,928,563
DIBULATKAN 124,928,000

umpulkan diluar bangunan


kap satu rumah ±25 org)

biaya akibat lembur sudah termasuk didalam harga


RIBU RUPIAH
DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA
H KERJA
UNITS VILLA/NONGSA/IV/11

AMIK, CEILING, POOL, DLL)


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 970.40 30,000.0 29,112,000

m2 427.50 26,000.0 11,115,000


m2 1,278.60 22,500.0 28,768,500
unit 2.00 600,000.0 1,200,000

unit 2.00 750,000.0 1,500,000


-
m2 16.00 25,000.0 400,000
-

m2 112.51 22,500.0 2,531,475


-

unit 2.00 750,000.0 1,500,000


-
unit 2.00 1,000,000.0 2,000,000
unit 2.00 2,000,000.0 4,000,000
GRAND TOTAL OF COST 82,126,975
DIBULATKAN 82,126,000
umpulkan diluar bangunan
kap satu rumah ±25 org)

biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

AMIK, CEILING, POOL, DLL)


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)
m2 970.40 30,000.0 29,112,000

m2 427.50 26,000.0 11,115,000


m2 1,278.60 22,500.0 28,768,500
unit 2.00 600,000.0 1,200,000

unit 2.00 750,000.0 1,500,000


-
m2 16.00 25,000.0 400,000
-

m2 112.51 22,500.0 2,531,475


-

unit 2.00 750,000.0 1,500,000


-
unit 2.00 1,000,000.0 2,000,000
unit 2.00 2,000,000.0 4,000,000
GRAND TOTAL OF COST 82,126,975
DIBULATKAN 82,126,000

umpulkan diluar bangunan


kap satu rumah ±25 org)

biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL
IR. YUDY CAHYONO
(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

AMIK, CEILING, POOL, DLL)


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 970.40 30,000.0 29,112,000

m2 427.50 26,000.0 11,115,000


m2 1,278.60 22,500.0 28,768,500
unit 2.00 600,000.0 1,200,000

unit 2.00 750,000.0 1,500,000


-
m2 16.00 25,000.0 400,000
-

m2 112.51 22,500.0 2,531,475


-

unit 2.00 750,000.0 1,500,000


-
unit 2.00 1,000,000.0 2,000,000
unit 2.00 2,000,000.0 4,000,000
GRAND TOTAL OF COST 82,126,975
DIBULATKAN 82,126,000

umpulkan diluar bangunan


kap satu rumah ±25 org)

biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

AMIK, CEILING, POOL, DLL)


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 970.40 30,000.0 29,112,000

m2 407.30 26,000.0 10,589,800


m2 1,278.60 22,500.0 28,768,500
unit 2.00 600,000.0 1,200,000

unit 2.00 750,000.0 1,500,000


-
m2 16.00 25,000.0 400,000
-

m2 112.51 22,500.0 2,531,475


-

unit 2.00 750,000.0 1,500,000


-
unit 2.00 1,000,000.0 2,000,000
unit 2.00 2,000,000.0 4,000,000
GRAND TOTAL OF COST 81,601,775
DIBULATKAN 81,601,000

umpulkan diluar bangunan


kap satu rumah ±25 org)

biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL
IR. YUDY CAHYONO
(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

TUP TANGGA, DAK BORDES, DAK ANAK TANGGA DAN


PUL DAN SEALER)
FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 124.61 20,000.0 2,492,100


m2 69.16 20,000.0 1,383,200
m2 124.61 20,000.0 2,492,100

m2 141.12 20,000.0 2,822,300


m2 196.04 20,000.0 3,920,800
m2 68.25 20,000.0 1,365,000
-
unit 13.00 100,000.0 1,300,000
GRAND TOTAL OF COST 15,775,500
DIBULATKAN 15,775,000

umpulkan diluar bangunan


kap satu rumah ±25 org)
biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 14 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

K TANGGA & CANOPY


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)

m2 44.80 20,000.0 896,000


m2 67.20 20,000.0 1,344,000
m2 44.80 20,000.0 896,000
GRAND TOTAL OF COST 3,136,000
DIBULATKAN 3,136,000

umpulkan diluar bangunan


kap satu rumah ±25 org)
biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA

H KERJA
UNITS VILLA/NONGSA/IV/11

K TANGGA & CANOPY


FRANKLYN UNIT WITH POOL
HARGA SAT TOTAL HARGA
UNIT QTY
(RP) (RP)
m2 44.80 20,000.0 896,000
m2 44.80 20,000.0 896,000
m2 44.80 20,000.0 896,000
GRAND TOTAL OF COST 2,688,000
DIBULATKAN 2,688,000

umpulkan diluar bangunan


kap satu rumah ±25 org)
biaya akibat lembur sudah termasuk didalam harga

DIKELUARKAN DI : BATAM
TANGGAL : 12 APRIL 2011
DISETUJUI OLEH

IR. DARIUS TARIGAN IR. DINA HARY V.


(7) Ka. PERENCANAAN (8) COST CONTROL

IR. YUDY CAHYONO


(9) DIREKTUR PT. JATIM MUSTIKA NUSA
BQ FRANKLYN UNIT WITH POOL

NO. DESCRIPTION UNIT QTY FLOOR QTY UNIT PRICE SUM SUB TOTAL

A BLOCKWALL AND WALL FINISHES


A.1 Supply and fix 1 layer brickwall of m2 485.20 SGD 17.92 SGD 8,694.78
100mm thick for external and internal
wall, complete with neccasry concrete
pier and beams
- 1st Floor 214.00
- 2nd Floor 205.00
- Roof 66.20
A.2 Render / Plaster
- External Render / Plaster m2 331.00 SGD 8.94 SGD 2,959.14
- 1st Floor 120.00
- 2nd Floor 107.00
- Roof 104.00
- Internal Render / Plaster m2 639.30 SGD 8.26 SGD 5,280.62
- 1st Floor 308.00
- 2nd Floor 303.00
- Roof 28.30
A.3 Wall Paint
- External Paint m2 331.00 SGD 4.13 SGD 1,367.03
- 1st Floor 120.00
- 2nd Floor 107.00
- Roof 104.00
- Internal Paint m2 639.30 SGD 2.72 SGD 1,738.90
- 1st Floor 308.00
- 2nd Floor 303.00
- Roof 28.30
A.4 Concrete Canopy at Master Bathroom ls 1.00 SGD 450.00 SGD 450.00
A.5 Concrete Bench at roof ls 1.00 SGD 912.00 SGD 912.00

COLLECTION A SGD 21,402.47

B FLOOR FINISHES AND WALL FINISHES


B.1 White Terrazzo (TZ-01) m2 128.00 SGD 51.98 SGD 6,653.44
- 1st Floor 55.70
- 2nd Floor 72.30
- Roof -
B.2 White Pebble Wash (PW-01) m2 - 9.00 SGD 25.00 SGD 225.00
- 1st Floor -
- 2nd Floor 9.00
- Roof -
B.3 White epoxy paint and Screed at Roof m2 - SGD 14.70 SGD -
B.4 Matt White Dove Mosaic tile (50x50) m2 3.32 SGD 56.50 SGD 187.58
with black grout (TL-02)
- 1st Floor 1.35
- 2nd Floor 1.97
- Roof -
B.5 Matt Blue Glazed Mosaic tile (50x50) m2 44.75 SGD 68.30 SGD 3,056.43
with white grout (TL-02) for swimming
B.6 pool
300x300 White ceramic Tile (TL-01) at m2 8.08 SGD 28.00 SGD 226.24
Maid and Store Room
B.7 Waterproofing Double Coating for m2 57.55 SGD 12.17 SGD 700.38
Swimming Pool and Screed
B.8 Waterproofing Single Coating and Screed m2 139.70 SGD 6.09 SGD 850.07
- 1st Floor (powder room and canopy) 12.30
- 2nd Floor 24.40
- Roof 103.00
B.9 Timber Decking & Wall at Master m2 4.50 SGD 406.00 SGD 1,827.00
Bathroom
B.10 Lawn (Grass, included top soil filling) m2 6.00 SGD 17.00 SGD 102.00
B.11 Timber Border at Toilet m 11.29 SGD 9.23 SGD 104.21
- 1st Floor 5.35
- 2nd Floor 5.94
B.12 Timber Ledger 140x50mm (WD-01) m 9.40 SGD 39.23 SGD 368.76
- 1st Floor 4.90
- 2nd Floor 4.50

35 of 40
NO. DESCRIPTION UNIT QTY FLOOR QTY UNIT PRICE SUM SUB TOTAL

COLLECTION B SGD 14,301.11

C CEILLING & PARTITION


C.1 9mm Fibrous plaster ceilling board in m2 62.30 SGD 14.60 SGD 909.58
white acrylic emulsion paint finish to
math c/w frame & support plus acess
hatch
- 1st Floor 39.80
- 2nd Floor 22.50
- Roof -
C.2 9mm Gypsum board in white acrylic m2 132.70 SGD 13.52 SGD 1,794.10
emulsion paint finish to math c/w frame
& support plus acess hatch
- 1st Floor 61.70
- 2nd Floor 71.00
- Roof -
C.3 Skim coat to soffit of roof slab in white m2 111.93 SGD 5.47 SGD 612.26
acrylic emulsion paint finish

COLLECTION C SGD 3,315.94

D DOOR, WINDOW AND GLASS RAILLING


Supply and fix door and window c/w
frame, accessories and ironmongery
D.1 Door
-SD-01 (timber screen with steel unit 1.00 SGD 516.00 SGD 516.00
frame swing door 2530x1070mm)
- SD-02 (timber screen with steel unit 1.00 SGD 468.00 SGD 468.00
frame swing door 1700x870mm)
- TD-01 (Timber solid swing door unit 1.00 SGD 610.00 SGD 610.00
2455x1100mm)
- TD-02 (Clear glass with timber frame unit 1.00 SGD 2,751.60 SGD 2,751.60
sliding door 2850x7510mm)
- TD-03 (Timber solid swing door unit 3.00 SGD 725.00 SGD 2,175.00
2150x900mm)
- LD-01 (timber louvre swing door unit 3.00 SGD 416.00 SGD 1,248.00
2150x800mm)
- LD-01' (timber solid swing door unit - SGD 416.00 SGD -
2150x800mm)
- GD-01 (fix clear tempered glass with unit 1.00 SGD 711.00 SGD 711.00
swing door 2500x1425mm)
- GD-02 (fix clear tempered glass with unit 1.00 SGD 812.00 SGD 812.00
swing door 2500x1725mm)
- SD-03 (Aluminium swing door unit 1.00 SGD 565.00 SGD 565.00
2150x1165mm)
D.2 Window
- AW-01 (timber sliding window unit 1.00 SGD 960.50 SGD 960.50
2550x2500mm)
- AW-02 (timber sliding window unit 1.00 SGD 1,505.00 SGD 1,505.00
2900x3780mm)
- AW-03 (timber sliding window unit 1.00 SGD 1,096.00 SGD 1,096.00
2900x2680mm)
- AW-04 (timber sliding window unit 1.00 SGD 1,441.00 SGD 1,441.00
3800x2500mm)
- GW-01 (Fix glass window unit 1.00 SGD 217.00 SGD 217.00
2500x975mm)
- GW-02 (timber casement window unit 1.00 SGD 448.00 SGD 448.00
with 10mm fix opaque glass
2500x1100mm)
- GW-03 (timber casement window unit 1.00 SGD 710.00 SGD 710.00
with 10mm fix opaque glass
2500x1090mm)
-GW-04 (Fix glass window unit 1.00 SGD 127.00 SGD 127.00
2800x550mm)
- GW-06 (12mm fix clear glass window unit 1.00 SGD 151.00 SGD 151.00
2500x715mm)
- MW-01 (Timber screen unit 1.00 SGD 480.00 SGD 480.00
2900x1000mm)
D.3 Glass Railling

36 of 40
NO. DESCRIPTION UNIT QTY FLOOR QTY UNIT PRICE SUM SUB TOTAL

- GR-01 (10mm tempered clear glass unit 1.00 SGD 713.00 SGD 713.00
railling 1000x3780mm with timber
capping 30x50mm)
- GR-02 (10mm tempered clear glass unit 1.00 SGD 514.00 SGD 514.00
railling 1000x2580mm with timber
capping 30x50mm)
-
12mm tempered glass at swimming unit 1.00 SGD 452.00 SGD 452.00
pool
D.4 Ventilator Grating for Concealed AC Splite Type
- Grating profil 400x1200mm unit 4.00 SGD 191.00 SGD 764.00

COLLECTION D SGD 19,435.10

E Staircase Finishes
E.1 Staircase Cage with timber screen from m2 51.83 SGD 88.54 SGD 4,589.03
1st to roof level
E.2 M.S. Railling in white paint finish with m' 16.00 SGD 74.10 SGD 1,185.60
balau timber as Handrail
E.3 50x1200x10mm THK Balau timber strip nos 44.00 SGD 7.32 SGD 322.08
to be embedded to staircase

COLLECTION E SGD 6,096.71

F Sanitary Wares (Material by Owner)


- Closet + Hand Shower unit 3.00 SGD 35.10 SGD 105.30
- Wash Basin + tap unit 4.00 SGD 23.40 SGD 93.60
- Bathube + Shower set column unit 1.00 SGD 56.70 SGD 56.70
- Shower Set unit 3.00 SGD 23.40 SGD 70.20
- Paper Holder unit 3.00 SGD 5.90 SGD 17.70
- Soap holder unit 3.00 SGD 5.90 SGD 17.70
- Double Towel Bar / Hanger unit 3.00 SGD 5.90 SGD 17.70
- Kitchen sink and Faucet unit 1.00 SGD 29.30 SGD 29.30
Floor Drain c/w material (ex.
- American standard) unit 7.00 SGD 46.80 SGD 327.60
Clean Out c/w material (ex.
- American standard) unit 3.00 SGD 67.80 SGD 203.40
- Mirrow 2000x1500 c/w material nos 2.00 SGD 255.00 SGD 510.00
- Mirrow 3000x1500 c/w material nos 1.00 SGD 382.00 SGD 382.00
Water heater 80 ltr c/w material (ex.
- Ariston, horizontal type) unit 1.00 SGD 607.00 SGD 607.00

COLLECTION F SGD 2,438.20

COLLECTION ARCHITEC WORK SGD 66,989.53

G ELECTRICAL WORK
1 Lighting point installation c/w switch and nos 53.00 SGD 30.00 SGD 1,590.00
Install Light Fixture (cable : 3x1.5mm
NYA supreme or equivalent in pvc
2 conduit)
1x13A switch socket outlet + Instalation nos 14.00 SGD 55.00 SGD 770.00
3 2x13A switch socket outlet + Instalation nos 8.00 SGD 62.00 SGD 496.00
4 2x13A switch socket-shave outlet + nos 4.00 SGD 55.00 SGD 220.00
Instalation (cable : 3x2.5mm NYA
supreme or equivalent in pvc conduit)
5 2x13A switch socket outlet (External nos 6.00 SGD 79.10 SGD 474.60
Use) + Instalation (cable : 3x2.5mm
NYA supreme or equivalent in pvc
conduit)
AC switch socket outlet + Instalation SGD 272.00
(without isolator, cable : 3x4mm NYA
6 supreme or equivalent in pvc conduit) nos 4.00 SGD 68.00
WH switch socket outlet + Instalation SGD 68.00
(without isolator, cable : 3x4mm NYA
7 supreme or equivalent in pvc conduit) nos 1.00 SGD 68.00
8 Panel 1st Floor nos 1.00 SGD 763.00 SGD 763.00
9 Panel 2nd Floor (install at 1st floor) nos 1.00 SGD 594.00 SGD 594.00
Cable Toevour from Panel to Kwh Meter SGD 25.00
(cable : 4x10mm NYA supreme or
10 equivalent in pvc conduit, maximum : m 5.00 SGD 5.00
11 until outside(3building,
Grounding ohm) excluded nos 1.00 SGD 481.00 SGD 481.00
termination to kwh meter)

37 of 40
NO. DESCRIPTION UNIT QTY FLOOR QTY UNIT PRICE SUM SUB TOTAL

COLLECTION G SGD 5,753.60

H Clean and Hot Water System


- Fresh water instalation pipe uPVC m' 9.13 SGD 6.80 SGD 62.08
class AW Ø 1" c/w accessories
- Fresh water instalation pipe uPVC m' 44.61 SGD 5.70 SGD 254.28
class AW Ø ¾" c/w accessories
Fresh water instalation pipe uPVC m' 62.70 SGD 4.13 SGD 258.95
class AW Ø ½" c/w accessories
- Gate valve Ø 1" nos 2.00 SGD 23.00 SGD 46.00
- Gate valve Ø ¾" nos 4.00 SGD 17.00 SGD 68.00
- Water tap Ø ½" nos 4.00 SGD 12.00 SGD 48.00
- Floating valve Ø ¾" nos 1.00 SGD 40.00 SGD 40.00
- Hot Water Instalation (Lement) c/w m' 60.17 SGD 17.00 SGD 1,022.89
accessories

COLLECTION H SGD 1,800.20

I Waste, Sewage and Vent System


- Waste and sewage water pipe m' 102.00 SGD 10.00 SGD 1,020.00
instalation uPVC SS213 Ø4" c/w
accessories to main sewage IC
- Waste and sewage water pipe m' 72.00 SGD 6.00 SGD 432.00
instalation uPVC SS213 Ø2" c/w
accessories to main sewage IC
- Waste and sewage water pipe m' 42.00 SGD 5.30 SGD 222.60
instalation uPVC SS213 Ø1½" c/w
accessories to main sewage IC
- U Body trap 100mm nos 11.00 SGD 22.10 SGD 243.10

COLLECTION I SGD 1,917.70

J AIR CONDITIONER & VENTILATION


1 Supply and Install Wall mounted AC unit 1.00 SGD 724.00 SGD 724.00
model Split 1,50 HP (ex. LG branded or
equivalent)
2 Supply and Install Wall mounted AC unit 3.00 SGD 1,035.00 SGD 3,105.00
model Split 2 HP (ex. LG branded or
equivalent)
3 Ducting AC Muster Bedroom unit 1.00 SGD 430.00 SGD 430.00
4 Drain Pipe 15mm ls 1.00 SGD 113.00 SGD 113.00
COLLECTION F SGD 4,372.00

K Springkler System
- Instalation pipe black steel sch 40 Ø m' 12.00 SGD 39.00 SGD 468.00
2" c/w accessories
- Instalation pipe black steel sch 40 Ø m' 15.00 SGD 28.00 SGD 420.00
1½" c/w accessories
- Instalation pipe black steel sch 40 Ø m' 12.00 SGD 21.00 SGD 252.00
1¼" c/w accessories
- Instalation pipe black steel sch 40 Ø m' 25.00 SGD 14.00 SGD 350.00
1" c/w accessories
- Sprinkler Head nos 9.00 SGD 25.35 SGD 228.15
- Sprinkler head wall type nos 2.00 SGD 25.35 SGD 50.70
- Gate valve Ø 2" nos 2.00 SGD 99.00 SGD 198.00
- Gate valve Ø 1" nos 1.00 SGD 65.00 SGD 65.00
COLLECTION K SGD 2,031.85

L Fire Alarm System


- Heat Detector + ROR + Instalation nos 8.00 SGD 89.00 SGD 712.00
- Break Glass / Push Button nos 1.00 SGD 111.00 SGD 111.00
- Alarm Bell + light nos 1.00 SGD 97.00 SGD 97.00
- Indicator Lamp nos 1.00 SGD 64.00 SGD 64.00
- Terminal Box Fire Alarm nos 1.00 SGD 198.00 SGD 198.00
- Panel 4 Zone (pyrogard) nos 1.00 SGD 1,413.00 SGD 1,413.00

COLLECTION L SGD 2,595.00

38 of 40
NO. DESCRIPTION UNIT QTY FLOOR QTY UNIT PRICE SUM SUB TOTAL

M TV, Telephone and Network Cable


1 TV Outlet + Instalation nos 3.00 SGD 72.00 SGD 216.00
2 TV Junction Box nos 1.00 SGD 51.00 SGD 51.00
3 Telephone Outlet + Instalation nos 4.00 SGD 69.00 SGD 276.00
4 Telephone Junction Box nos 1.00 SGD 51.00 SGD 51.00

COLLECTION M SGD 594.00

N Rain Water System


Roof Drain Ø4" (ex. Pvc wavin or
- equivalent) nos 6.00 SGD 72.15 SGD 432.90
uPVC SS213 Ø4" c/w accessories
- (max until outside building) m' 60.00 SGD 8.91 SGD 534.60

COLLECTION N SGD 967.50

LIGHTNING PROTECTION SYSTEM


O (FOLLOW EXISTING)
- Aluminium tape c/w accessories sum 1.00 SGD 396.00 SGD 396.00
- Copper tap c/w accessories sum 1.00 SGD 339.00 SGD 339.00
Copper rod c/w accessories
- (grounding : 5 ohm) sum 1.00 SGD 439.00 SGD 439.00

COLLECTION O SGD 1,174.00

P SWIMMING POOL
- Concrete bench 300x775mm ls 1.00 SGD 986.00 SGD 986.00
- Fresh water pipe instalation uPVC ls 1.00 SGD 117.00 SGD 117.00
class AW c/w accessories
- Drain pipe instalation uPVC SS213 ls 1.00 SGD 213.00 SGD 213.00
c/w accessories
- Water pump system Instalation pipe ls 1.00 SGD 1,751.00 SGD 1,751.00
for swimming pool c/w under water
light and transformer
- Supply and fix pump and catridge nos 1.00 SGD 3,167.00 SGD 3,167.00
filter c/w ball valve, check valve, inlet
fitting and electrical panel

COLLECTION P SGD 6,234.00

COLLECTION ME WORK SGD 27,439.85

Q OTHERS

Q.1 White terrazzo for wall and counter m2 13.45 SGD 68.00 SGD 914.60

- Wall at Master Bathroom H = 1050mm 12.70


- Counter lavatory at Bathroom L-2 0.75

Q.2 White cement finishes m2 196.52 SGD 25.00 SGD 4,913.00

- Roof terrace 86.05

- Swimming pool patio / terrace 32.00


- Entrance 5.25

- Stair and bordes 73.22

Q.3 Matt white dove mosaic tile (50x50) with m2 26.28 SGD 59.00 SGD 1,550.52

black grout (TL-02) wall finishes at shower


area

- Powder room L-1 12.37

- Bathroom L-2 13.91


Q.4 Kalsiboard panel for vertical canopy m2 8.50 SGD 18.00 SGD 153.00

- Aircon Box 4.00

- Master bathroom L-2 4.50

Q.5 Gypsum dry wall 9mm thk with emulsion m2 8.70 SGD 15.00 SGD 130.50

39 of 40
NO. DESCRIPTION UNIT QTY FLOOR QTY UNIT PRICE SUM SUB TOTAL

finish paint
- Bedroom L-2 8.70

Q.6 GW-05 (fix glass partition with 2 nos unit 1.00 SGD 2,025.00 SGD 2,025.00

tempered swing door) based on revised

layout 23.08.10
- Master bathroom L-2 1.00

Q.7 Magnetic keylock system for SD-01 unit 1.00 1.00 SGD 400.00 SGD 400.00

Q.8 Stainless steel railing at swimming pool unit 1.00 1.00 SGD 150.00 SGD 150.00

Q.9 Electricity meter (ex. Acrtis) unit 1.00 1.00 SGD 231.00 SGD 231.00
Q.10 Water meter (ex. Actaris) unit 1.00 1.00 SGD 62.00 SGD 62.00

COLLECTION Q SGD 10,529.62

COLLECTION FRANKLYN UNIT WITH POOL SGD 104,959.00