BOQ FOR NRH LAUNDRY CONCRETE SLAB

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Exacavation
1 Surface Excavation 42.9 m3 $ 90.00 $ 3,861.00
2 Excavation for footing 11.3 m $ 90.00 $ 1,017.00

Concrete
25Mpa Concrete as specified in:-
3 Footing 12 m3 $ 1,200.00 $ 14,400.00
4 Slab 26 m3 $ 1,200.00 $ 31,200.00
5 Allow for formwork 1 item $ 1,200.00 $ 1,200.00

Reinforcment
6 F82 Mesh Wire 286 m2 $ 25.00 $ 7,150.00
7 DPC 150MU 286 m2 $ 3.00 $ 858.00
8 D12 steel in footing 306 m $ 9.33 $ 2,854.98
9 D12 Tiees 180 m $ 9.33 $ 1,679.40
10 Galvanized tie wire 10 kg $ 7.00 $ 70.00

Cloth Line
5 25 pcs $ 180.00 $ 4,500.00
65mm dia x 4mm thk x1.83m long
galv pipe
6 M12x120 diana bolts 32 pcs $ 10.00 $ 320.00
7 6mm runing wire 1 roll $ 320.00 $ 320.00

Total Cost Of Material $ 69,430.38

Labour $ 18,051.90
Transport $ 2,777.22
Sub-total $ 90,259.49

Profit and Tax $ 9,025.95


Total Cost Of Project $ 99,285.44