Item Description Total

T01 Introduction, General Rules and Recommendations


T02 Preliminaries
T03 Demolition
T04 Groundworks
T05 Piling
T06 Concrete
T07 Formwork
T08 Reinforcement
T09 Prestressing
T10 Precast Concrete
T11 Tanking and Waterproof Membranes
T12 Masonry
T13 Stonework
T14 Structural Steel
T15 Metalwork
T16 Roofing
T17 Façade Systems
T18 Windows
T19 Glazing
T20 Carpentry
T21 Partitions
T22 Suspended Ceilings
T23 Access Floors
T24 Doors
T25 Hardware
T26 Applied Finishes, Render and Textured Finishes
T27 Tiling, Slab and Paving
T28 Carpet and Resilient Finishes
T29 Painting
T30 Joinery
T31 Furniture, Fittings and Equipment
T32 Hydraulics
T33 Drainage
T34 Electrical Installations

5/16/2019 Page 1
Rawlinsons Ltd
Schedule of Prices Summary

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Total

T35 Mechanical Installations


T36 Transportation Services
T37 Exterior Elements
T38 Fire Protection
T39 Included Sums

5/16/2019 Page 2
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

1 This schedule has been prepared as an example based on the


Australian and New Zealand Standard Method of Measurement
of Building Works 2018 edition to assist the New Zealand
Building Industry understand the impact of the new method of
measurement for Schedules of Quantities
2 This schedule generally follows the rules of the ANZSMM 2018
and the New Zealand guidance notes dated 19 February,
however it also incorporates regionally appropriate
amendments
3 Rawlinsons Limited accepts no liability for loss or damage
occurring from this document

5/16/2019 Page 1
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations


KEY PARTIES
Client
1 Company/Name note
Address
Point of contact
Architect
2 Company/Name note
Address
Point of contact
Structural Engineer
3 Company/Name note
Address
Point of contact
Electrical Engineer
4 Company/Name note
Address
Point of contact
Hydraulic Engineer
5 Company/Name note
Address
Point of contact
Civil Engineer
6 Company/Name note
Address
Point of contact
Quantity Surveyor
7 Company/Name note
Address
Point of contact
SITE
8 Tenderers shall allow to inspect the site during the preparation note
of their tender submission, the point of contact for arranging
site visits is (NAME) (CONTACT DETAILS).
The site shall be handed over to the contractor in (NUMBER)
stages on the (DATE).
The site is located (DESCRIPTION OF LOCATION) with
access by (DESCRIPTION OF ACCESS).
DESCRIPTION OF WORK
9 The scope of the work consists of the construction of a new note
building along with extensive siteworks

5/16/2019 Page 2
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations (Continued)


10 The construction generally comprises reinforced concrete note
foundations and ground floor slab. Structural steel frames
support the Insulated panel, Colorsteel and membrane roofing
systems, internal partitioning is generally timber framed with
aluminium framed glazed openings, aluminium window and
external door joinery, a variety of external wall cladding,
mechanical, electrical, data, plumbing, security and fire
protection services, fittings and fixtures to meet a range of
space requirements, floor coverings, external works and
underground services duct and external drainage and site
works. The approximate gross floor area is 1,280m2
CONDITIONS OF CONTRACT
11 The Conditions of Contract are NZS 3910:2013
12 The specification section covering Special Conditions of item
Contract and Preliminary and General Clauses are tabulated
hereunder in order that tenderers may allow for them should
they deem it necessary. Refer to the Specification for full
descriptions of these clauses, the headings used in this section
of the Schedule of Prices should only be considered as a
framework for the individual allowances that tenderers may
wish to make
GENERAL CONDITIONS OF CONTRACT
13 Tenderers shall allow here for specific items as set out in the item
Conditions of Contract and Schedule 1 - Special Conditions of
Contract - Specific Conditions of Contract
14 The items listed below are an indication of obligations or item
restrictions which may be imposed on the tenderer, the
tenderer shall familiarized themselves with all sections of the
special conditions of contract, specifications and contract
documents, any omission from the list below but otherwise
noted in these documents shall be priced here
Special Conditions of Contract
15 Section 1 INTERPRETATION
16 Section 2 THE CONTRACT
17 Section 3 PERFORMANCE BOND
18 Section 4 SUBCONTRACTS
19 Section 5 GENERAL OBLIGATIONS
20 Section 6 ENGINEERS POWERS & RESPONSIBILITIES
21 Section 7 INDEMNITY
22 Costs and losses incurred by the Principal due to failure of the item
contractor to arrange and keep insurance as required
23 Section 8 INSURANCE
24 Section 9 VARIATIONS
25 Section 10 TIME FOR COMPLETION

5/16/2019 Page 3
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations (Continued)


Specifications
TENDER CONDITIONS
26 Tenders shall be valid for a period of not less than 30 calendar note
days
SCHEDULE OF QUANTITIES
27 This schedule of quantities forms apart of the contract
documents
28 This schedule of quantities is measured generally in item
accordance with the basic principles of Australian and New
Zealand Standard Method of Measurement of Building Works,
2018 Edition, published by the Australian Institute of Quantity
Surveyors, Master Builders of Australia Limited, New Zealand
Institute of Quantity Surveyors and the Registered Master
Builders Association of New Zealand, but any deviation from
the same shall not form the basis of a claim by the Contractor
29 Where dimensions are stated in the descriptions of items in the item
Schedule of Prices, they are generally given in the order: length
x width x height
30 The dimensions stated in this Schedule of Prices are generally item
those shown on the drawings but in some cases they are
scaled from the drawings or have been measured on site and
may not be exact. Dimensions given in descriptions should be
checked on site or sizes confirmed with the Engineer if they are
not clearly stated on the drawings or in the Specification
31 Where dimensions are stated in descriptions the figures item
represent mm but generally mm is not included after the figure.
Where a figure is not mm or quantity is stated within a
description it is generally given in letters or connected with a
hyphen or oblique or an abbreviation is used immediately
following
GENERAL PARTICULARS
Contractual Conditions
Working hours
32 Working hours on the site are not restricted, the contractor is item
required to comply with local territorial authority consent
conditions and noise and nuisance
controls.
Rates and wages and prices of materials
33 Tenderers must price every item individually. In the event of a item
tenderer grouping items for pricing the Engineer reserves the
right to break down the total price amongst the items so
grouped together
34 The rates for all items in this Schedule of Prices shall include item
for supplying and fixing in position except where specifically
otherwise described

5/16/2019 Page 4
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations (Continued)


35 The rates for temporary works shall include unless otherwise item
stated for removal from site on completion and making good as
necessary
Sub-letting
36 The tenderer shall not sub-let or allow the sub-letting of works item
by subcontractor without the approval of the Principal
Progress and final certificates
37 Progress valuations shall be in accordance with section 12 item
38 Progress valuations and progress payment schedules shall be item
submitted in accorance with section 12.1.1
39 Progress valuations shall be carried out in accordance with
section 12.2
40 The final payment claim shall be submitted in accordance with item
section 12.4
Variations
41 Variations shall be administered as required under section 9 item
and the Special Conditions of Contract
Dates for commencement and completion
42 The contractor is to provide a programme and advise a item
proposed completion date
Bonus for early completion
43 No bonus for early completion apply note
Liquidated damages
44 Liquidated damages do not apply note
Rise and fall
45 Cost fluctuations do not apply item
Exemption from duty sales or other taxes
Issue and return of documents
46 The Contractor shall obtain the building consent forms and item
documents from the Principal, retain them on site and return to
the Principal on completion.
Discrepancies
47 The Contractor shall detail any discrepancies in the contract item
documents require clarification or determination, Specification
section 1260 Project Management
Submission of priced schedule of quantities
48 The Contractor shall supply to the Engineer a priced copy of the item
schedule of quantities with 20 days of the award
Contract agreement stamp

5/16/2019 Page 5
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations (Continued)


Payment of taxes
49 Payment of taxes shall be in accordance with section 12.13 item
Notices, permits, fees
Liability
50 The Principals and Contractors indemnity in accordance with item
section 7
Bonds, guarantees
51 The Contractor shall at its own expense provide a performance item
bond calculated to 10% of the contract price in accordance with
3.1
Payment of extra monies
52 All payments will be managed through monthly progress claims note
Authority approvals
53 The Contractor shall at their expense give notice and obtain all item
licences for Temporary Works and methods of carry out the
Contract Works in accordance with 5.11.4
54 The Contractor shall arrange for any necessary documents and item
information be supplied to the client to comply with 5.11 in
accordance with 5.11.5
55 The Contractor shall arrange for all necessary inspections item
required under the building consent documentation,
Specification clause 1234 Documentation
56 The Contractor shall provide for all other Producer statements, item
obtaining Code of Compliance Certificates and Interim Code of
Compliance Certificated, etc as specified
Insurance
57 The Contractor shall provide at its own expense the following item
insurances;
58 Provide for public liability insurance with cover of $10,000,000 item
59 Provide for motor vehicle third party insurance with cover of item
$2,000,000
60 Provide for insurance of the contract works and materials item
61 Provide for contractors plant and all other insurance considered item
necessary
62 Provide for vibration, weakening or removal of support with item
cover of $1,000,000
63 Provide for liability under the Forest and Rural Fire Act 1977 item
with cover of $1,000,000
Updating of programmes
64 The Contractor shall prepare and maintain a programme in item
accordance with section 5.10

5/16/2019 Page 6
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations (Continued)


Quality assurance
65 The Contractor shall prepare, provide for review and implement item
a quality assurance plan in accordance with section 5.18
66 The Contractor shall provide a Quality Assurance Certificate - item
Civil as specified
67 The Contractor shall provide a Quality Assurance Certificate - item
Structural as specified
Maintenance and protection of public and private property
68 The contractor shall allow to protect public and private property item
in accordance with section 5.7
Charts, schedules
Notice boards
69 2400 x 1200 Project sign fixed to temporary fencing describing item
the project
Setting out works
70 The Contractor shall allow to set out the works, including the item
employment of a Registered Surveyor if required
Temporary installations
71 Temporary roads, tracks, crossings and hard-standing item
Services
72 The Contractor is to allow for temporary services connections to item
the site, maintenance and decommissioning and removal on
completion of works
73 The Contractor is to allow for the protection of all existing item
services for the duration of the works
Telephone calls
74 The Contractor is required to make due allowance fore the item
supply, maintenance and decommissioning of
telecommunications equipment to the site, including services
for information technology connections
Temporary screens, fences, hoardings, guard rails etc
75 Temporary fencing, hoardings, planked footways, guardrails, item
gantries, overhead protection, warning and directional signs,
security, etc.
Temporary sheds, sanitary accomodation, etc
76 Temporary office, storage and messing
77 Temporary ablutions
Duties and attendance
Work outside the contract including nominated subcontractors
Supplied goods

5/16/2019 Page 7
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Introduction, General Rules and Recommendations (Continued)


Samples
Testing
Advertising
Footpath levels
Plant equipment and attendance labour
Scaffolding
Attendance
Protection
78 Provide for protection of the completed works item
79 Provide for reinstatement of all areas of the site and leave in item
original condition and to the approval of the Engineer
Cleaning and removal of rubbish
80 The Contractor shall comply with the requirements in item
Specification section 1256
81 Provide for periodic cleaning during the course of the contract item
82 Provide for cleaning on completion including all glass item
Handing over
Defects liability
83 52 Weeks defect liability period item
Security
Supervision and Administration
84 Provide for all costs in connection with site supervision item
85 Provide for all costs in connection with executive on site and all item
off site administration including all correspondence processing
claims, measuring and pricing variations for the contract period
including extensions and the agreement of Final Accounts
86 Provide for all costs in connection with the implementation, item
administration, training and the like for WebFM OMTrack
Documents Module as documented in section 1013 of the
Architectural Specification
Fire Fighting Equipment
Drying
Dewatering
87 The Contractor shall make due allowance for dewatering for item
excation works for the duration of the works
Works below water level
88 Not applicable note

5/16/2019 Page 8
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries
KEY PARTIES
Client
1 Company/Name note
Address
Point of contact
Architect
2 Company/Name note
Address
Point of contact
Structural Engineer
3 Company/Name note
Address
Point of contact
Electrical Engineer
4 Company/Name note
Address
Point of contact
Hydraulic Engineer
5 Company/Name note
Address
Point of contact
Civil Engineer
6 Company/Name note
Address
Point of contact
Quantity Surveyor
7 Company/Lawson Morris-Whyte note
Address
Point of contact
SITE
8 Tenderers shall allow to inspect the site during the preparation note
of their tender submission, the point of contact for arranging
site visits is (NAME) (CONTACT DETAILS).
The site shall be handed over to the contractor in (NUMBER)
stages on the (DATE).
The site is located (DESCRIPTION OF LOCATION) with
access by (DESCRIPTION OF ACCESS).
DESCRIPTION OF WORK
9 The scope of the work consists of the construction of a new note
building along with extensive siteworks

5/16/2019 Page 9
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries (Continued)
10 The construction generally comprises reinforced concrete note
foundations and ground floor slab. Structural steel frames
support the Insulated panel, Colorsteel and membrane roofing
systems, internal partitioning is generally timber framed with
aluminium framed glazed openings, aluminium window and
external door joinery, a variety of external wall cladding,
mechanical, electrical, data, plumbing, security and fire
protection services, fittings and fixtures to meet a range of
space requirements, floor coverings, external works and
underground services duct and external drainage and site
works. The approximate gross floor area is 1,280m2
CONDITIONS OF CONTRACT
11 The Conditions of Contract are NZS 3910:2013
12 The specification section covering Special Conditions of item
Contract and Preliminary and General Clauses are tabulated
hereunder in order that tenderers may allow for them should
they deem it necessary. Refer to the Specification for full
descriptions of these clauses, the headings used in this section
of the Schedule of Prices should only be considered as a
framework for the individual allowances that tenderers may
wish to make
GENERAL CONDITIONS OF CONTRACT
13 Tenderers shall allow here for specific items as set out in the item
Conditions of Contract and Schedule 1 - Special Conditions of
Contract - Specific Conditions of Contract
14 The items listed below are an indication of obligations or item
restrictions which may be imposed on the tenderer, the
tenderer shall familiarized themselves with all sections of the
special conditions of contract, specifications and contract
documents, any omission from the list below but otherwise
noted in these documents shall be priced here
Special Conditions of Contract
15 Section 1 INTERPRETATION
16 Section 2 THE CONTRACT
17 Section 3 PERFORMANCE BOND
18 Section 4 SUBCONTRACTS
19 Section 5 GENERAL OBLIGATIONS
20 Section 6 ENGINEERS POWERS & RESPONSIBILITIES
21 Section 7 INDEMNITY
22 Costs and losses incurred by the Principal due to failure of the item
contractor to arrange and keep insurance as required
23 Section 8 INSURANCE
24 Section 9 VARIATIONS
25 Section 10 TIME FOR COMPLETION

5/16/2019 Page 10
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries (Continued)
Specifications
TENDER CONDITIONS
26 Tenders shall be valid for a period of not less than 30 calendar note
days
SCHEDULE OF QUANTITIES
27 This schedule of quantities forms apart of the contract
documents
28 This schedule of quantities is measured generally in item
accordance with the basic principles of Australian and New
Zealand Standard Method of Measurement of Building Works,
2018 Edition, published by the Australian Institute of Quantity
Surveyors, Master Builders of Australia Limited, New Zealand
Institute of Quantity Surveyors and the Registered Master
Builders Association of New Zealand, but any deviation from
the same shall not form the basis of a claim by the Contractor
29 Where dimensions are stated in the descriptions of items in the item
Schedule of Prices, they are generally given in the order: length
x width x height
30 The dimensions stated in this Schedule of Prices are generally item
those shown on the drawings but in some cases they are
scaled from the drawings or have been measured on site and
may not be exact. Dimensions given in descriptions should be
checked on site or sizes confirmed with the Engineer if they are
not clearly stated on the drawings or in the Specification
31 Where dimensions are stated in descriptions the figures item
represent mm but generally mm is not included after the figure.
Where a figure is not mm or quantity is stated within a
description it is generally given in letters or connected with a
hyphen or oblique or an abbreviation is used immediately
following
GENERAL PARTICULARS
Contractual Conditions
Working hours
32 Working hours on the site are not restricted, the contractor is item
required to comply with local territorial authority consent
conditions and noise and nuisance
controls.
Rates and wages and prices of materials
33 Tenderers must price every item individually. In the event of a item
tenderer grouping items for pricing the Engineer reserves the
right to break down the total price amongst the items so
grouped together
34 The rates for all items in this Schedule of Prices shall include item
for supplying and fixing in position except where specifically
otherwise described

5/16/2019 Page 11
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries (Continued)
35 The rates for temporary works shall include unless otherwise item
stated for removal from site on completion and making good as
necessary
Sub-letting
36 The tenderer shall not sub-let or allow the sub-letting of works item
by subcontractor without the approval of the Principal
Progress and final certificates
37 Progress valuations shall be in accordance with section 12 item
38 Progress valuations and progress payment schedules shall be item
submitted in accorance with section 12.1.1
39 Progress valuations shall be carried out in accordance with
section 12.2
40 The final payment claim shall be submitted in accordance with item
section 12.4
Variations
41 Variations shall be administered as required under section 9 item
and the Special Conditions of Contract
Dates for commencement and completion
42 The contractor is to provide a programme and advise a item
proposed completion date
Bonus for early completion
43 No bonus for early completion apply note
Liquidated damages
44 Liquidated damages do not apply note
Rise and fall
45 Cost fluctuations do not apply item
Exemption from duty sales or other taxes
Issue and return of documents
46 The Contractor shall obtain the building consent forms and item
documents from the Principal, retain them on site and return to
the Principal on completion.
Discrepancies
47 The Contractor shall detail any discrepancies in the contract item
documents require clarification or determination, Specification
section 1260 Project Management
Submission of priced schedule of quantities
48 The Contractor shall supply to the Engineer a priced copy of the item
schedule of quantities with 20 days of the award
Contract agreement stamp

5/16/2019 Page 12
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries (Continued)
Payment of taxes
49 Payment of taxes shall be in accordance with section 12.13 item
Notices, permits, fees
Liability
50 The Principals and Contractors indemnity in accordance with item
section 7
Bonds, guarantees
51 The Contractor shall at its own expense provide a performance item
bond calculated to 10% of the contract price in accordance with
3.1
Payment of extra monies
52 All payments will be managed through monthly progress claims note
Authority approvals
53 The Contractor shall at their expense give notice and obtain all item
licences for Temporary Works and methods of carry out the
Contract Works in accordance with 5.11.4
54 The Contractor shall arrange for any necessary documents and item
information be supplied to the client to comply with 5.11 in
accordance with 5.11.5
55 The Contractor shall arrange for all necessary inspections item
required under the building consent documentation,
Specification clause 1234 Documentation
56 The Contractor shall provide for all other Producer statements, item
obtaining Code of Compliance Certificates and Interim Code of
Compliance Certificated, etc as specified
Insurance
57 The Contractor shall provide at its own expense the following item
insurances;
58 Provide for public liability insurance with cover of $10,000,000 item
59 Provide for motor vehicle third party insurance with cover of item
$2,000,000
60 Provide for insurance of the contract works and materials item
61 Provide for contractors plant and all other insurance considered item
necessary
62 Provide for vibration, weakening or removal of support with item
cover of $1,000,000
63 Provide for liability under the Forest and Rural Fire Act 1977 item
with cover of $1,000,000
Updating of programmes
64 The Contractor shall prepare and maintain a programme in item
accordance with section 5.10

5/16/2019 Page 13
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries (Continued)
Quality assurance
65 The Contractor shall prepare, provide for review and implement item
a quality assurance plan in accordance with section 5.18
66 The Contractor shall provide a Quality Assurance Certificate - item
Civil as specified
67 The Contractor shall provide a Quality Assurance Certificate - item
Structural as specified
Maintenance and protection of public and private property
68 The contractor shall allow to protect public and private property item
in accordance with section 5.7
Charts, schedules
Notice boards
69 2400 x 1200 Project sign fixed to temporary fencing describing item
the project
Setting out works
70 The Contractor shall allow to set out the works, including the item
employment of a Registered Surveyor if required
Temporary installations
71 Temporary roads, tracks, crossings and hard-standing item
Services
72 The Contractor is to allow for temporary services connections to item
the site, maintenance and decommissioning and removal on
completion of works
73 The Contractor is to allow for the protection of all existing item
services for the duration of the works
Telephone calls
74 The Contractor is required to make due allowance fore the item
supply, maintenance and decommissioning of
telecommunications equipment to the site, including services
for information technology connections
Temporary screens, fences, hoardings, guard rails etc
75 Temporary fencing, hoardings, planked footways, guardrails, item
gantries, overhead protection, warning and directional signs,
security, etc.
Temporary sheds, sanitary accomodation, etc
76 Temporary office, storage and messing
77 Temporary ablutions
Duties and attendance
Work outside the contract including nominated subcontractors
Supplied goods

5/16/2019 Page 14
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Preliminaries (Continued)
Samples
Testing
Advertising
Footpath levels
Plant equipment and attendance labour
Scaffolding
Attendance
Protection
78 Provide for protection of the completed works item
79 Provide for reinstatement of all areas of the site and leave in item
original condition and to the approval of the Engineer
Cleaning and removal of rubbish
80 The Contractor shall comply with the requirements in item
Specification section 1256
81 Provide for periodic cleaning during the course of the contract item
82 Provide for cleaning on completion including all glass item
Handing over
Defects liability
83 52 Weeks defect liability period item
Security
Supervision and Administration
84 Provide for all costs in connection with site supervision item
85 Provide for all costs in connection with executive on site and all item
off site administration including all correspondence processing
claims, measuring and pricing variations for the contract period
including extensions and the agreement of Final Accounts
86 Provide for all costs in connection with the implementation, item
administration, training and the like for WebFM OMTrack
Documents Module as documented in section 1013 of the
Architectural Specification
Fire Fighting Equipment
Drying
Dewatering
87 The Contractor shall make due allowance for dewatering for item
excation works for the duration of the works
Works below water level
88 Not applicable note

5/16/2019 Page 15
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Groundworks
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All measurements of excavation and subsequent disposal, item
filling and backfilling have been measured net before
excavation; allow for increase in bulk or decrease in
consolidation
4 Working space has been allowed for in accordance with Health item
and Safety at Work Act Regulation 24. Should any further
working space be deemed necessary, tenderers shall allow for
it here together with the necessary backfilling
5 The rates for excavation shall include for excavating in any item
material met with, excepting hard rock, and tenderers should
ascertain the nature of material to be excavated
6 The rates shall include for levelling, grading, trimming, item
compacting, scabbling and similar to faces of excavations other
than to reduce levels, floor slab and road pavement excavation,
keeping sides plumb and consolidating
7 The rates shall include for all clearing away and backfilling due item
to slips or cave-ins or over excavations that may occur during
the currency of the contract
8 The rates for excavation not exceeding 1.5m deep shall include item
for planking and strutting where necessary
9 Planking and strutting shall be deemed to mean provision of item
everything necessary to retain the sides of excavation including
sheet piling or any other means and the rates shall include for
any excavation, disposal and backfilling necessitated by the
planking and strutting
10 The rates shall include for levelling, grading, trimming and item
similar to faces of filled areas other than to over site, floor slab
and similar filling
11 The rates shall include for dressing around and sealing paper item
and plastic membranes to all penertrations
12 The rates shall include for all necessary plant and equipment, item
removal of spoil and debris
13 Provide for maintaining and upholding the public roadway, item
footpath and adjacent buildings
14 Provide for pumping or other means of dewatering to keep the item
excavation free from water
15 Provide for the disconnecting, sealing off, diverting, removing item
and protecting existing services met with during the excavation
and for making good any damage or disturbance to the
satisfaction of the Architect and Authorities

5/16/2019 Page 16
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Groundworks (Continued)
16 Excavations for services are to be included with their respective item
items in other Sections/Trades and a note will be made giving
cross references
17 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
18 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
19 Allow for quality assurance processes as specified item
20 Allow for all inspections and testing as specified item
BULK EXCAVATION & FILLING
21 Site clearance - Removal and disposal of vegetation, including 1 item
shrubs, redundant fencing and rubbish
22 Strip top soil and turf from section and remove from site, 400 125 m2
deep
23 Strip top soil and turf from section and stockpile on site, 400 2,000 m2
deep (for use in bunding)
24 Provide grading, dry density and optimum water content results 3 no
by NZS 4402:1986, Test 4.1.3 Vibrating Hammer for proposed
backfill material
25 Cut to waste unsuitable material - PROVISIONAL ITEM 50 m3
26 Import, place, condition and compact AP65 in maximum layers 120 m3
of 250 deep
27 Remove from stockpile, screen as necessary and spread 250 m3
topsoil as per plans
28 Remove to waste excess topsoil 250 m3
MAIN BUILDING
EXCAVATION
29 Excavate in hardfill for concrete ground beam 0-1m deep with 556 m3
600 extra width for working space each side and stockpile on
site
30 Excavate in hardfill for concrete ground beam 1-2m deep with 66 m3
600 extra width for working space each side and stockpile on
site
31 Excavate in hardfill for concrete ground beam 1-2m deep with 166 m3
600 extra width for working space each side and remove from
site
32 Excavate in hardfill for concrete pad 1-2m deep with 600 extra 196 m3
width for working space each side and remove from site

5/16/2019 Page 17
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Groundworks (Continued)
33 Excavate in hardfill for concrete slab thickening 300 deep and 60 m2
remove from site including battering
FILLING
34 Backfill to boxing space from stockpiles 0-1m deep 246 m3
35 Backfill to boxing space from stockpiles 1-2m deep 266 m3
SAND BLINDING
36 25 Thick sand blinding beneath concrete slab 1,090 m2
PAPER AND PLASTIC MEMBRANES
37 250 Micron damp proof membrane beneath slab and 1,949 m2
foundations
End of Section

5/16/2019 Page 18
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Concrete
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 Concrete shall be Special grade or High grade complying with item
NZS 3109 : 1997 and shall be from an approved ready-mix
plant
4 All concrete is to be placed into formwork unless otherwise item
stated
5 The rates for concrete shall include for placing concrete, item
vibrating where required, for pouring around rod or mesh
reinforcement and for grouting up holes of spacers
6 The rates shall include for additional concrete required to item
conform to structural and excavated tolerances
7 The rates shall include for pour joints and joints shown on the item
drawings that do not require formwork
8 The rates for concrete shall include for finishing surfaces to falls item
or to the required specification and for curing and protecting
exposed surfaces
9 The rates shall include for making good after the removal of item
formwork and casting in all required items
10 The rates shall include for scabbling other than that required by item
ANZSMM
11 The rates for concrete shall include for water stops, sleeves, item
chases, penetrations, forming of small recesses, sinkings for
floor springs, pockets, cutting and pinning, building in etc
12 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
13 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
14 Allow for all producer statements as specified item
15 Allow for all method statements as specified item
16 Allow for 10 year guarantee covering joints generally as item
specified
17 Allow for 2 year guarantee covering slabs generally as specified item
18 Allow for all quality assurance processes as specified item
19 Allow for all inspections and testing as specified item

5/16/2019 Page 19
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Concrete (Continued)
20 Allow for providing samples of materials and finishes item
MAIN BUILDING
FOUNDATIONS
25 MPa Reinforced Concrete at 28 days
21 In foundation beams 244 m3
22 In foundation pad 65 m3
Sundries
23 U2 Finish to top of foundation beam 375 m2
24 U2 FInish to top of foundation pad 82 m2
GROUND SLAB & THICKENINGS
30 MPa Special Grade Reinforced Concrete at 28 days
25 In slab 0-100 thick :[773 m2] 78 m3
26 In slab 0-100 thick to falls :[16 m2] 2 m3
27 In slab 100-200 thick :[197 m2] 35 m3
28 In slab 100-200 thick to falls :[105 m2] 19 m3
29 In slab thickening 63 m3
30 In strip drain encasement 3 m3
Sundries
31 U3 Finish to slab 970 m2
32 U3 Finish to slab to falls 121 m2
33 30 x 6 Sawcut including approved sealant 202 m
34 40 x 6 Sawcut including approved sealant 84 m
Sundries from other trades
Structural Steel
35 Mastic sealant around base of steel column 67 m
Floor Screed
36 Allow for 10 year manufacturer warranty as specified item
37 Ardex Grout & FLC to falls to shower floor 5 m2
Take delivery and cast in the following items from other trades:
Windows
38 40 x 5 EA Cast in to slab as door sill including ties, 900 long 1 no
(detail 19/A4.02)
Carpentry
39 M16 x 400 4.6/S Threaded rod 85 no
40 M20 x 340 8.8/S Hold down bolt 2 no

5/16/2019 Page 20
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Concrete (Continued)
41 M20 x 400 4.6/S Threaded rod 173 no
Structural Steel
42 M16 x 320 8.8/S Hold down bolt including 50 x 50 x 6 anchor 2 no
plate
43 M20 x 590 4.6/TB Hold down bolt including 50 x 50 x 6 anchor 32 no
plate
44 M20 x 600 8.8/S Hold down bolt 11 no
45 M24 x 580 8.8/TB Hold down bolt 286 no
46 M24 x 610 4.6/TB Hold down bolt 16 no
47 M24 x 630 8.8/TB Hold down bolt including 50 x 50 x 6 anchor 8 no
plate
48 250 x 100 x 12 Anchor plate 22 no
49 540 x 270 x 12 Anchor plate 11 no
50 480 x 310 x 12 Anchor plate 33 no
51 290 x 130 x 16 Anchor plate 8 no
NIB UPSTANDS
30 MPa Reinforced Concrete at 28 days
52 In nib upstand :[52 m] 3 m3
COLUMN ENCASEMENT
30 MPa Reinforced Concrete at 28 days
53 In column encasement 1 m3
Sundries
54 U3 Finish to top of encasement 1 m2
End of Section

5/16/2019 Page 21
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Formwork
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates shall include for all necessary boarding, supports, item
erecting, framing, temporary cambering, cutting, perforations
for reinforcing bars, bolts, straps, ties,hangers, pipes and
similar, angles, removal, cleaning, wetting and treatment with
separating agent before placing concrete, chamfered edges
and splayed internal angles less than 50mm wide on face, filling
tie bolt holes, strutting left after removal of formwork
4 All formwork shall comply with standard of NZS 3114 item
5 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
6 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
MAIN BUILDING
FOUNDATIONS
F1 Formwork to:-
7 Side of foundation beam 481 m2
8 Side of foundation pad 104 m2
GROUND SLAB & THICKENINGS
F1 Formwork to:-
9 Side of strip drain encasement 12 m2
F5 Formwork to:-
10 Side of thickening 5 m2
11 Side of edge thickening 90 m2
Sundries
12 Form 500 x 500 x 150 deep recess for power box in slab 4 no
13 Form 1120 x 900 shower floor set-down and to falls 4 no
14 Form 140 x 45 rebate at edge of concrete slab 11 m
15 Form 180 x 35 rebate at edge of concrete slab 4 m
16 Form 370 x 25 sloping rebate at edge of concrete slab 33 m
17 Form 75 x 110 recess in slab for strip drain 13 m
18 Form 150 x 50 recess in slab for shower strip drain 4 m

5/16/2019 Page 22
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Formwork (Continued)
NIB UPSTANDS
F5 Formwork to:-
19 Side of nib upstand, 0 - 250 high 147 m
Sundries
20 Form 90 x 50 rebate to edge of nib upstand 19 m
21 Form 100 x 50 rebate to edge of nib upstand 4 m
COLUMN ENCASEMENT
F5 Formwork to:-
22 Side of column encasement 2 m2
End of Section

5/16/2019 Page 23
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Reinforcement
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 Deformed mild steel bars described with the prefix D, plain item
round mild steel bars described with the prefix R, high yield
deformed bars with the prefix H and high yield plain round steel
bars with the prefix HR shall comply with NZS 3402. Welded
mesh fabric reinforcement and workmanship shall conform to
the requirements of NZS 3109
4 Laps to all bars have been measured as shown on the item
drawings, as nominated by engineer or at 8m centres as per
ANZSMM 2018 NZ Guidance Notes
5 Allow for welding and weld testing shall comply with NZS 4702 item
6 The weights of rod reinforcement have been calculated from item
standard tables. Rates shall include for rolling margin
7 The rates shall include for cleaning, fabrication, placing, the item
provision of all necessary temporary fixings and supports
including tie wire and chair supports
8 The rates shall include for supplying rod reinforcement in item
lengths up to 10m where required
9 The rates for mesh reinforcement shall include for laps; all item
areas have been measured net
10 Reinforcing steel shall be manufactured by an approved item
supplier as specified
11 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
12 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
13 Allow for all quality assurance processes as specified item
14 Allow for all producer and method statements as specified item
15 Allow for all inspections and testing as specified item
16 Allow for all bending schedules as specified item
MAIN BUILDING
FOUNDATIONS
17 XD10 Starter drilled and epoxied into foundation beam with Hilti 32 no
HIT RE-500, 600 long

5/16/2019 Page 24
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Reinforcement (Continued)
18 XD10 U-bar 7 kg
19 D12 Starter 303 kg
20 XR12 Stirrup 10,496 kg
21 XD12 U-bar 105 kg
22 XD16 Rod 42 kg
23 XD20 Rod 745 kg
24 XD25 Rod 26,471 kg
SLAB, THICKENINGS & NIBS
25 XD10 Rod 105 kg
26 XD10 Starter 182 kg
27 XR10 Stirrup 1,341 kg
28 D12 Starter 1,800 kg
29 XD12 Rod 8,555 kg
30 XD16 Starter 219 kg
31 XD16 Rod 1,159 kg
32 XD20 Rod 9,524 kg
End of Section

5/16/2019 Page 25
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Tanking and Waterproof Membranes


PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates for tanking and waterproofing shall include for item
temprary screeds, grounds and rules
4 The rates shall include for scabbling other than that required by item
ANZSMM
5 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
6 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
Tanking and Waterproofing Membranes
7 STO Flexyl or liquid DPM to rebate, 340 girth 79 m
8 Ardex WPM 001 waterproofing liquid to sill rebate, 370 girth 56 m
9 12 EPS Rigid insulation protection to waterproofing, 150 high 65 m

5/16/2019 Page 26
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Masonry
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 Materials and workmanship shall comply with NZS 4210. item
Concrete blocks shall be Firth or similar approved units
4 Mortar shall comply with Specification Clause 3.7.3 item
5 The preambles and rates to include clauses of the Reinforcing item
Steel trade section shall apply equally to this section
6 The rates shall include for leaving loose bricks or blocks for item
cleaning out cavities, leaving weep holes, forming cavities,
forming rebates reveals and pointing and cleaning down to
reveals where necessary
7 The rates shall include for fractional size blocks, plain and plain item
return blocks and similar blocks, all necessary machine cutting,
cutting to form bond, cutting or forming chases for edges of
floor slabs, cutting or leaving holes and openings as recesses
for and building in pipes, conduits, sleeves and similar as
required for all trades
8 The rates shall include for leaving surfaces rough or raking out item
joints for plastering and flashings, knocking off angles in
preparation for plastering, bedding frames or plates, building in
joists, bearers, or similar, temporary supports to openings,
templates, and for all necessary making good
9 The rates shall include for plumbing angles and reveals to item
openings etc., all temporary tomming and supports and for
protecting adjacent surfaces and finished work
10 The rates shall include for cleaning down as the work proceeds item
and on completion
11 Provide for making and testing samples of mortar and grout as item
Specified
12 The rates shall include for all construction joints as required item
13 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
14 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
15 Allow for all quality assurance processes as specified item
16 Allow for all inspections as specified item
17 Allow for all producer statements as specified item

5/16/2019 Page 27
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Masonry (Continued)
18 Allow for all testing as specified item
MAIN BUILDING
BLOCKWORK
Firth 20 Series RC Masonry Blocks, laid in stretcher bond and
pointed as specified
19 In solid filled exterior wall 58 m2
20 In solid filled interior wall 20 m2
21 400 high lintel block course to four openings 6 m
22 Plain end blocks 18 m
23 Half high block course 7 m
24 Raking cut 200 thick block course for 3.0m high internal wall 8 m
25 Form fair external angle 16 m
26 Form tee intersection 10 m
Grout
27 20 MPa course grout to all cores of 20 series block wall approx. 8 m3
88m2
Reinforcing Steel
28 XD16 Rod 829 kg
End of Section

5/16/2019 Page 28
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Structural Steel
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 Structural Steelwork shall comply with BS:4360, or AS:1204 item
workmanship with NZS:3404, welding and weld testing with
NZS:4702
4 The weights have been calculated from standard tables: no item
allowance has been made for rolling margin
5 Where lengths are stated in the descriptions they are item
approximate only
6 Dimensions for all steelwork must be checked on site item
7 The rates shall include for all shop fabrication work, marking, item
drillings for bolts including those securing timbers, etc shown or
noted on steelwork drawing, black bolts, nuts and any type of
washer, riveted work, counter sinking, and tapping for bolts or
machine screws
8 The rates shall include for cutting to dead lengths, notching and item
machining ends and bearings
9 The rates shall include for supply, fabrication, delivery, hoisting item
and erection of members, except where otherwise described
10 The rates for continuous members shall include for welded item
joints in the length
11 Bolts shall include for nuts, washers and tapered washers as item
required
12 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
13 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
14 The heaviest lift is ... item
15 The highest lift is ... item
GENERAL
16 Allow for all quality assurance processes as specified item
17 Allow for shop drawings as specified item
18 Allow for the provision of all necessary temporary bracing and item
similar items required for erection
19 Allow for all testing and inspections as specified item
20 Allow for all submittals as specified item

5/16/2019 Page 29
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Structural Steel (Continued)


21 Allow for all producer statements as specified item
MAIN BUILDING
FRAMES
The Following Hoisted Fixed at Ground Floor Level with Bolted
Connections
22 700WB130 Portal column :[2/4.3] 1,112 kg
23 700WB130 Portal beam comprising of three sections bolted 3,083 kg
together :[2/3.2 1/17.4]
24 310UB46 Column :[5/4.8 5/5.2] 2,297 kg
25 250UB37 Column :[7/3.9 6/4.2 8/4.6 6/4.7 6/5.1] 5,473 kg
26 200UB30 Column :[1/4.4] 130 kg
27 150 x 9 SHS Column (In 4 no; total weight 792 kg) 21 m
28 150 x 9 SHS Diagonal brace (In 4 no; total weight 1,018 kg) 27 m
29 125 x 9 SHS Column (In 3 no; total weight 337 kg) 11 m
30 89 x 6 SHS Column (In 13 no; total weight 701 kg) 48 m
31 6 End plate (In 20 no) 19 kg
32 8 Stiffener (In 4 no) 4 kg
33 10 Plates, stiffeners and cleats (In 4 no) 10 kg
34 12 Stiffener (In 156 no) 291 kg
35 16 End and base plates (In 34 no) 323 kg
36 20 Plates and stiffeners (In 19 no) 362 kg
37 32 Base plate (In 37 no) 1,365 kg
38 M16 x 0-100 8.8/S Bolt fixing steel to steel 4 no
39 M16 x 0-100 Threaded stud welded to steelwork 294 no
40 M20 x 0-100 8.8/TB Bolt fixing steel to steel 84 no
41 M20 x 0-100 8.8/S Bolt fixing steel to steel 32 no
42 220 x 180 x 20 Thick high strength non-shrink grout pack 1 no
43 250 x 100 x 20 Thick high strength non-shrink grout pack 13 no
44 280 x 140 x 20 Thick high strength non-shrink grout pack 3 no
45 480 x 310 x 30 Thick high strength non-shrink grout pack 33 no
46 500 x 260 x 30 Thick high strength non-shrink grout pack 4 no
47 540 x 240 x 30 Thick high strength non-shrink grout pack 11 no
48 740 x 290 x 30 Thick high strength non-shrink grout pack 2 no
Supply the following to the Concrete Contractor to be cast in
49 40 x 5 Equal Angle (In 1 no) 3 kg

5/16/2019 Page 30
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Structural Steel (Continued)


50 M16 x 300-400 8.8/S Hold down bolt including 50 x 50 x 6 2 no
anchor plate
51 M20 x 500-600 4.6/TB Hold down bolt including 50 x 50 x 6 32 no
anchor plate
52 M24 x 500-600 8.8/TB Hold down bolt 286 no
53 M24 x 600-700 4.6/TB Hold down bolt 16 no
54 M24 x 600-700 8.8/TB Hold down bolt including 50 x 50 x 6 8 no
anchor plate
55 12 Anchor plate (In 44 no) 614 kg
56 16 Anchor plate (In 8 no) 38 kg
The Following Hoisted Fixed at First Floor Level Approximately
3.5m Average Above Ground Level
57 310UB46 Beam :[2/2.4 2/3.0 1/3.6 2/4.2 3/4.6] 1,678 kg
58 250UB37 Beam :[26/3.3] 3,150 kg
59 200UB30 Beam :[1/0.8 1/2.9 1/7.3] 326 kg
60 180UB22 Outrigger :[9/0.8 2/1.3] 209 kg
61 180UB22 Beam :[6/3.1] 413 kg
62 250 PFC Trimmer (In 14 no) 2,228 kg
63 100 x 6 SHS Stub post (In 3 no; total weight 17 kg) 1 m
64 89 x 6 SHS Column (In 25 no; total weight 1,256 kg) 86 m
65 100 x 8 EA (In 3 no) 6 kg
66 6 End plate (In 38 no) 204 kg
67 8 Plates and cleats (In 2 no) 3 kg
68 10 Cleats and stiffeners (In 359 no) 1,200 kg
69 12 Plates and stiffeners (In 48 no) 95 kg
70 16 Splice and end plates (In 69 no) 159 kg
71 25 Splice plate (In 22 no) 366 kg
72 M16 x 0-100 8.8/S Bolt fixing steel to steel 172 no
73 M20 x 0-100 Threaded stud welded to steelwork 80 no
74 M24 x 0-100 8.8/TB Bolt fixing steel to steel 88 no
ROOF FRAMING
The Following Hoisted Fixed at Roof Level Approximately 5.0m
average Above Ground Level
75 410UB60 Rafter :[10/3.0 5/3.4 5/7.7] 5,063 kg
76 310UB46 Rafter :[10/4.4] 1,996 kg
77 310UB46 Beam :[18/2.7] 2,191 kg

5/16/2019 Page 31
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Structural Steel (Continued)


78 250UB37 Rafter :[18/3.0 14/3.7] 3,902 kg
79 250 PFC Beam (In 10 no) 1,318 kg
80 150PFC Rafter (In 2 no) 224 kg
81 150 x 9 SHS Beam (In 8 no; total weight 1,697 kg) 45 m
82 150 x 6 SHS Beam (In 23 no; total weight 2,018 kg) 77 m
83 75 x 6 EA Fly brace (In 32 no) 105 kg
84 65 x 5 EA Roller door support (In 8 no) 147 kg
85 6 Plates and cleats (In 416 no) 1,233 kg
86 8 Plates, cleats and stiffeners (In 76 no) 92 kg
87 10 Plates. cleats and stiffeners (In 18 no) 52 kg
88 10 Continuous tie plate (In 2 no) 195 kg
89 12 Plates, cleats and stiffeners (In 511 no) 2,236 kg
90 16 Splice plate (In 52 no) 59 kg
91 25 Splice plate (In 26 no) 432 kg
92 M12 x 0-100 4.6/S Bolt fixing steel to steel 56 no
93 M16 x 0-100 4.6/S Bolt fixing steel to steel 1,252 no
94 M16 x 0-100 8.8/S Bolt fixing steel to steel 30 no
95 M20 x 0-100 8.8/S Bolt fixing steel to steel 354 no
96 M20 x 0-100 8.8/TB Bolt fixing steel to steel 792 no
97 M24 x 0-100 8.8/TB Bolt fixing steel to steel 104 no
98 XR20 Bracing rod 719 kg
99 Turnbuckle to XR20 bracing rod including fixings (detail 48 no
2/A06-11)
100 End to XR20 bracing rod including fixings (detail 4/A06-11) 96 no
101 DHS200/18 Purlin 1,221 m
102 800 Long purlin brace 144 no
PRIMING
Prepare and apply one coat of Dulux Luxaprime ZP to specified
thickness to:-
103 Interior steelwork (all members girthed) 1,172 m2
104 Touch up priming areas after erection item
Prepare and apply Dulux Quit Rust Metal Primer to:-
105 Exterior steelwork (all members girthed) 838 m2
106 Touch up priming areas after erection item

5/16/2019 Page 32
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Metalwork
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The weights have been calculated from standard tables: no item
allowance has been made for rolling margin. The weights of
galvanised steel exclude the additional weight of galvanising
4 Where lengths are stated in the descriptions they are item
approximate only
5 Dimensions for all metalwork must be checked on site item
6 The rates shall include for cutting to length, splay cut or item
machined ends, holes, slots, packers, spacers, etc., and for
templates and the like
7 The rates shall include for supply, fabrication, and fixing of item
members complete except where otherwise described
8 The rates shall include for all welding, both in the shop and on item
the site including preparation, sealing runs, grinding smooth
where required and for welded joints in the length of continuous
members
9 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
10 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
METAL WALL CLADDING
11 Provide 15 year manufacturer warranty as specified item
12 Provide 5 year installation warranty as specified item
13 0.55 BMT Dimond LT7 Colour Coated ZR8 wall cladding fixed 85 m2
to cavity battens
14 Ecofoam closure strip 26 m
15 18 Wide cavity closer 72 m
0.55 BMT Colour Coated Flashings
16 160 Girth three times bent soffit flashing 20 m
17 250 Girth four times bent flashing at plaster cladding junction 11 m
18 370 Girth six times bent top hat flashing 7 m
19 410 Girth seven times bent corner flashing 7 m
METAL SOFFIT LINING

5/16/2019 Page 33
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Metalwork (Continued)
20 Dimond Baby Iron Colour Coated soffit lining fixed to under side 315 m2
of steel purlins
0.55 BMT Colour Coated Flashings
21 210 Girth five times bent soffit flashing 72 m
22 300 Girth four times bent end flashing 49 m
INTERNAL HANDRAILS
23 Stainless Steel 304 Grade sloping handrail including ramps, 22 m
stop ends, bends and standoff brackets fixed to timber framing
End of Section

5/16/2019 Page 34
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Roofing
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All roofing has been measured net with no allowance made for item
side or other laps
4 The rates for membrane roofing shall include for fair edges, item
dressing over angle fillets, turning into grooves, all other
labours, internal and external angles, fillets, circular edges,
separation strips other than those specifically detailed in the
contract documents, nails, screws and similar items, temporary
screeds, rules and grounds
5 The rates for Membrane Roofing shall include for preparation of item
surfaces
6 The rates shall include for nails, screws, clips, rivets, straps and
similar items
7 The rates for flashings shall include for folding and bending to item
shape, laps, joints, expansion joints, soakers, clips and shaping
at angles and ends, and for bituminous breather underlay
8 Sealant shall be of an approved type and compatible with the item
roof coverings
9 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
10 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
MAIN BUILDING
INSULATED PANEL ROOFING
11 Provide 15 year manufacturers warranty as specified item
12 Provide 2 year installation warranty as specified item
13 Kingspan KS1000 RW Insulated panel roofing with 60 PIR 632 m2
board insulation fixed to steel purlins
14 Kingspan KS1000 RW Insulated panel roofing with 60 PIR 361 m2
insulation fixed to timber roof framing
15 Form downturn at eaves 93 m
16 Profiled closure strip including gun grade sealant 187 m
17 6 x 4 Continuous run of butyl sealant 96 m
18 Foam filler at ridge including gun grade sealant at top and 24 m
bottom

5/16/2019 Page 35
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Roofing (Continued)
19 Foam filler at barge 46 m
20 Site applied insulation at eave (detail 18/A4.05) 85 m
0.55 BMT Coil Coated Roof Flashings
21 180 Girth two times bent eaves flashing 45 m
22 350 Girth three times bent apron flashing notched for ribs 44 m
23 460 Girth three times bent ridge flashing notched for ribs 24 m
24 470 Girth three times bent barge flashing 26 m
25 500 Girth five times bent barge flashing 20 m
26 Z Flashing under barge flashing including 6 x 4 butyl sealant 46 m
(detail 32/A4.06)
Roof Penetrations
27 Form 800 x 400 roof penetration for extract duct, seal and flash 1 no
to approval
METAL ROOFING
28 Provide manufacturer warranty as specified item
29 Provide 5 year installation warranty as specified item
30 Dimond Veedek 0.55 BMT Colour ZR8 coated roofing fixed to 419 m2
steelwork
31 Thermoplast 990 foil and R3.2 115 thick insulation fitted 419 m2
between timber roof framing
32 Thermakraft 405 roof underlay on drainage matt 424 m2
33 Aumesh safety netting fixed to timber framing 419 m2
34 Form downturn at eaves 51 m
35 Form stop end at end of sheet 35 m
36 Ecofoam closure strip 113 m
0.55 Colour Coated Roof Flashings
37 180 Girth two times bent eaves flashing 51 m
38 370 Girth two times bent apron flashing notched for ribs 11 m
39 390 Girth four times bent apron flashing notched for ribs 27 m
40 510 Girth five times bent barge flashing 24 m
MEMBRANE ROOFING
41 Provide 20 year manufacturer warranty as specified item
42 Provide 5 year installer warranty as specified item
43 Provide all information required for compliance as specified item
44 Allow for all testing as specified item

5/16/2019 Page 36
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Roofing (Continued)
45 Nuraply 3PM base & top coat torch on membrane on plywood 81 m2
substrate (plywood measured elsewhere)
46 Form 70 downturn at drip edge 59 m
47 Dress membrane 200 up timber framed wall 54 m
48 Dress membrane 680 up and over parapet wall 11 m
0.55 Colour Coated Roof Flashings
49 80 Girth two times bent flashing at wall junction 14 m
50 150 Girth three times bent edge flashing 19 m
51 490 Girth four times bent parapet cap flashing 11 m
Roof Outlets
52 Roof drainage outlet c/w bronze cast dome and insert for 65 3 no
downpipe including forming penetration
FASCIAS
1.2 ZR8 Colour Coated Mild Steel
53 260 Girth three times bent fascia 23 m
54 360 Girth six times bent fascia 49 m
55 380 Girth seven times bent fascia 73 m
56 470 Girth four times fascia 24 m
57 540 Girth seven times bent fascia 28 m
RAINWATER SYSTEM
58 Provide warranty as specified item
59 Allow to test rainwater disposal system item
60 Dimond 300 Colour coated spouting including 50 x 5 exposed 95 m
folded brackets fixed to timber framing
61 Dimond 300 Colour coated spouting including 50 x 5 exposed 49 m
folded brackets bolt fixed to steel purlins
62 Colour coated rainwater head including overflow and 100 2 no
downpipe outlet and any gratings necessary
63 150 Downpipe outlet to gutter 5 no
64 Stop end to gutter 12 no
65 150 Colour coated 0.7 downpipe including adjustable standoff 25 m
brackets
66 Bend to 150 downpipe 7 no
67 Connect 150 downpipe to drain 5 no
68 100 Colour coated 0.7 downpipe including adjustable standoff 7 m
brackets
69 Bend to 100 downpipe 4 no

5/16/2019 Page 37
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Roofing (Continued)
70 Connect 100 downpipe to drain 2 no
71 65 Colour coated 0.7 downpipe including adjustable standoff 9 m
brackets
72 Bend to 65 downpipe 3 no
73 Connect 65 downpipe to drain 3 no
End of Section

5/16/2019 Page 38
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Windows
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 Aluminium windows shall comply with NZS:4211 and AAA item
performance requirements
4 The sizes and descriptions in this schedule are approximate item
only and the sub-contractor shall submit details for approval
before commencing manufacture. All dimensions must be
checked on site
5 All aluminium members shall be of heavy gauge extruded item
aluminium alloy with a satin powdercoated finish
6 All glass and glazing shall be in accordance with NZS item
4223:1991
7 The rates shall include for glazing, which has NOT been item
measured separately
8 The rates shall include for neoprene rubber gaskets, mastics, item
special glazing compounds, and matching clip in glazing beads
9 The rates shall include for frames, mullions, transoms and item
glazing bars and beads, trims, caulking and pointing, sashes,
casements, hinges, fastenings and other hardware
10 Flashings where shown have been measured separately. Rates item
shall include for all other flashings required to make the
windows watertight
11 Reveal linings shall be grooved to suit wall linings of varying item
thicknesses
12 The rates shall include for all necessary packings, grounds, item
wedges and fixing
13 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
14 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
ALUMINIUM WINDOWS
15 Provide for shop drawings as specified item
16 Provide a five year written manufacturer warranty as specified item
17 Provide a two year written installation warranty as specified item
18 Allow for ten year written manufacturer warranty covering item
glazing as specified

5/16/2019 Page 39
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Windows (Continued)
19 Provide samples as specified item
20 Provide certificates as specified item
21 Allow for design to wind pressure parameters as specified item
APL Architectural Series Aluminium Powdercoated Double
Glazed Window Section, Complete with Rebated Timber
Reveals
22 700 x 2665 High window with one fixed pane and one awning 2 no
hung sash (W02, W03)
23 1040 x 1765 High window with one awning hung sash (W06) 1 no
24 2770 x 1390 High window with two fixed panes and one awning 2 no
hung sash (W08, W09)
25 3012 x 2665 High window with four fixed panes (W04, W05) 2 no
26 3400 x 2850 High window with four fixed panes and two awning 1 no
hung sashes (W01)
27 4512 x 1785 High window with three fixed panes (W07) 1 no
APL Metro Series Aluminium Powdercoated Double Glazed
Window Section, Complete with Rebated Timber Reveals
28 800 x 800 High window with one awning hung sash (W10, W11, 4 no
W12, W20)
29 1500 x 950 High window with one fixed pane and one awning 2 no
hung sash (W26, W27)
30 1600 x 840 High window with one fixed pane and one awning 5 no
hung sash (W14, W15, W16, W18, W19)
31 1600 x 1180 High window with one fixed pane and one awning 5 no
hung sash (W21, W22, W23, W24, W25)
32 2970 x 950 High window with five fixed panes (W17) 1 no
33 3000 x 1000 High window with one fixed pane and two awning 1 no
hung sashes (W13)
FLASHINGS
Powdercoated Aluminium Flashings
34 80 Girth three times bent head flashing. Detail 23/A4.05 34 m
35 140 Girth two times bent jamb flashing. Detail 6/A4.03 6 m
36 160 Girth two times bent jamb flashing. Detail 5/A4.03 11 m
37 200 Girth three times bent jamb flashing. Detail 4/A4.03 6 m
Plastic Flashings
38 110 Wide vertical plastic soaker flashing. Detail 24/A4.05 81 m
2.0 Powdercoated Aluminium Flashings
39 180 Girth three times bent sill flashing. Detail 21/A4.05 8 m
Sundries

5/16/2019 Page 40
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Windows (Continued)
40 Allow for 10 year warranty for the supply and installation of item
sealants
41 Sika AT-Facade silicone air seal on PEF backing rod 169 m
42 Grout infill to concrete slab edge rebate following threshold 10 m
installation. Detail 2S/A4.01
End of Section

5/16/2019 Page 41
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Glazing
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All glass and glazing shall be in accordance with NZS 4223 : item
1991
4 Glazing to metal windows and doors has been scheduled in the item
Metal Windows and Doors trade section
5 The rates shall include for all putties, mastics, special glazing item
compounds and all necessary materials for the completion of
the glazing and for preparing and sealing rebates
6 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
7 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
8 Provide 10 year manufacturer warranty as specified item
9 Provide samples as specified item
MIRRORS
10 460 x 1000 x 6 Thick mirror with ground edges fixed to 4 no
plasterboard lined wall
11 485 x 1000 x 6 Thick mirror with ground edges fixed to 1 no
plasterboard lined wall
12 570 x 1000 x 6 Thick mirror with ground edges fixed to 1 no
plasterboard lined wall
13 895 x 1000 x 6 Thick mirror with ground edges fixed to 4 no
plasterboard lined wall
SPLASHBACKS
14 2090 x 450 Low iron colourback glass splashback fixed to 1 no
plasterboard wall including sealant
15 2160 x 585 Low iron colourback glass splashback fixed to 1 no
plasterboard wall including sealant
16 2813 x 585 Low iron colourback glass splashback fixed to 1 no
plasterboard wall including sealant
17 3100 x 585 Low iron colourback glass splashback fixed to 1 no
plasterboard wall including sealant
18 5005 x 585 Low iron colourback glass splashback fixed to 1 no
plasterboard wall including sealant
5/16/2019 Page 42
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Glazing (Continued)
End of Section

5/16/2019 Page 43
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All materials and workmanship shall comply with NZS 3604 item
4 The rates shall include for all labour cutting, notching, boring or item
checking for ventilation, fixing to other timbers, packings and
wedges as required, morticing, tenoning, arris-rounding,
thicknessing or gauging where required and all other machining
5 The rates shall include for all labours in framing, notching and item
fitting around projections, pipes, light fittings, hatches, grilles
and similar complete with all cleats, packers, wedges and
similar and all nails and screws
6 The rates for bolts and Dynabolts shall include for holes in the item
timber, for necessary nuts and washers and for building in,
casting in and recessing heads as required
7 The rates for building paper shall include for flashing tape to item
openings, parapet walls and the like
8 The sizes given of thicknessed, gauged or dressed timbers are item
nominal sizes. Where finished sizes are required these are
described as (fin)
9 All timbers, unless otherwise described shall be gauged H1.2 item
treated MSG8 Grade Pinus Radiata
10 Damp proof course shall comply with AS/NZS 2904 and item
AS/NZS 4347.0
11 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
12 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
13 Allow for all quality assurance processes as specified item
14 Allow for all producer statements as specified item
MAIN BUILDING
UPPER ROOF AND SOFFIT FRAMING
15 100 x 50 Blocking 47 m
16 150 x 50 Blocking 180 m
17 150 x 50 Outrigger 175 m
18 150 x 50 Purlin 603 m

5/16/2019 Page 44
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
19 150 x 50 Trimmer 47 m
20 2/150 x 50 Trimmer 69 m
21 2/250 x 50 HySpan rafter 14 m
H3.2 Treated
22 150 x 100 Firring 41 m
Sundries
23 M16 x 0-100 4.6/S Bolt fixing timber to steelwork 17 no
24 M16 x 200-300 4.6/S Bolt fixing timber to steelwork 18 no
25 4/53 x 0.9 Galvanised Lumberlok multi-brace strap 64 m
26 Lumberlok 110 x 150 long Z275 multigrip 260 no
LOWER ROOF AND SOFFIT FRAMING
27 75 x 50 Blocking 27 m
28 100 x 50 Blocking 56 m
29 150 x 50 Plate 11 m
30 150 x 50 Blocking 33 m
31 150 x 50 Trimmer 6 m
32 200 x 50 Purlin 8 m
33 200 x 50 Plate fixed to blockwork 8 m
34 200 x 50 Soffit dwang 15 m
35 250 x 50 HySpan rafter 381 m
36 250 x 50 Trimmer 52 m
37 250 x 50 Trimmer fixed to blockwork 10 m
38 250 x 50 Blocking 199 m
39 2/150 x 50 Purlin 9 m
H3.2 Treated
40 100 x 75 Packer 129 m
41 270 x 40 Shaped packer beneath parapet cap 11 m
Sundries
42 M16 x 200-300 4.6/S Threaded rod drilled and epoxied into 54 no
blockwall with Hilti HIT-RE 500
43 Pair of Lumberlok 110 x 150 long Z275 Multigrip 249 no
44 2/6kN twisted sheet brace straps 108 no
EXTERNAL WALL FRAMING
45 75 x 75 Packer 15 m
46 100 x 50 Packer fixed to steelwork 38 m

5/16/2019 Page 45
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
47 100 x 50 Packer 98 m
48 100 x 100 Packer 32 m
49 150 x 50 Bottom plate fixed to concrete 54 m
50 150 x 50 Bottom plate 9 m
51 150 x 50 Stud 1,225 m
52 150 x 50 Dwang 606 m
53 150 x 50 Top plate 76 m
54 150 x 50 Packer 95 m
55 150 x 50 Plate fixed to steelwork 39 m
56 150 x 50 Blocking 49 m
57 150 x 75 Plate fixed to steelwork 4 m
58 150 x 100 Plate fixed to steelwork 33 m
59 200 x 30 Packer 49 m
60 200 x 50 Bottom plate 39 m
61 200 x 50 Stud 815 m
62 200 x 50 Dwang 399 m
63 200 x 50 Top plate 39 m
64 200 x 50 Blocking 31 m
65 200 x 50 Plate fixed to steelwork 76 m
66 200 x 50 Plate fixed to blockwork 9 m
67 200 x 100 Tapered plate fixed to blockwork 6 m
68 250 x 50 Plate fixed to steelwork 87 m
69 2/150 x 50 Bottom plate 18 m
70 2/150 x 50 Bottom plate fixed to concrete 14 m
71 2/150 x 50 Lintel 6 m
72 2/150 x 50 Top plate 31 m
73 2/150 x 50 Plate fixed to steelwork 44 m
74 2/200 x 50 Bottom plate 26 m
75 2/200 x 50 Bottom plate fixed to concrete 4 m
76 2/200 x 50 LVL HySpan lintel 12 m
77 2/200 x 50 Top plate 29 m
78 3/150 x 50 Lintel 58 m
H3.1 Treated
79 18 x 45 Cavibat 1,163 m

5/16/2019 Page 46
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
80 45 x 10 Packer 36 m
81 45 x 20 Cavity batten 244 m
82 70 x 20 Packer 199 m
83 100 x 20 Packer 15 m
H5 Treated
84 70 x 12 Packer 92 m
Sundries
85 Bolt fix 50 timber to steelwork 180 no
86 100-200 Long bolt fixing timber to timber 51 no
87 200-300 Long bolt fixing timber to timber 48 no
88 M16 x 100-200 4.6/S Bolt fixing timber to steelwork 148 no
89 M16 x 200-300 long 4.6/S Coach bolt fixing timber to steelwork 152 no
90 M16 x 300-400 Threaded rod drilled and epoxied into blockwall 41 no
with Hilti HIT-RE 500
91 M16 x 200-300 4.6/S Bolt fixing timber to steelwork 87 no
92 Gib Handibrac hold-down including fixings 28 no
93 Damp proof course 150 wide 68 m
94 Damp proof course 200 wide 6 m
Supply the following to be cast in by the Concrete Contractor
95 M16 x 300-400 4.6/S Threaded rod 85 no
96 M20 x 300-400 4.6/S Threaded rod 49 no
INTERNAL WALL FRAMING
97 45 x 20 Batten 535 m
98 75 x 50 Packer 22 m
99 100 x 30 Packer 11 m
100 100 x 50 Threshold plate 8 m
101 100 x 50 Bottom plate fixed to concrete 54 m
102 100 x 50 Bottom plate 82 m
103 100 x 50 Stud 1,724 m
104 100 x 50 Dwang 693 m
105 100 x 50 Top plate 149 m
106 100 x 50 Plate fixed to steelwork 60 m
107 150 x 50 Bottom plate fixed to concrete 101 m
108 150 x 50 Bottom plate 13 m
109 150 x 50 Stud 1,890 m

5/16/2019 Page 47
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
110 150 x 50 Dwang 905 m
111 150 x 50 Top plate 130 m
112 150 x 50 Plate fixed to steelwork 59 m
113 150 x 75 Plate fixed to steelwork 42 m
114 200 x 50 Plate fixed to blockwork 10 m
115 200 x 50 Plate fixed to steelwork 12 m
116 200 x 50 Bottom plate fixed to concrete 21 m
117 200 x 50 Bottom plate 5 m
118 200 x 50 Stud 343 m
119 200 x 50 Dwang 155 m
120 200 x 50 Top plate 28 m
121 2/100 x 50 Bottom plate 19 m
122 2/100 x 50 Top plate 19 m
123 2/150 x 50 Bottom plate fixed to concrete 43 m
124 2/150 x 50 Bottom plate 9 m
125 2/150 x 50 Top plate 52 m
126 2/150 x 50 Lintel 8 m
127 2/200 x 50 Bottom plate fixed to concrete 4 m
128 2/200 x 50 Top plate 4 m
129 2/250 x 50 LVL HySpan lintel 5 m
Sundries
130 Fix 50 bottom plate to concrete floor 277 no
131 M16 x 100-200 4.6/S Coach bolt fixing timber to steelwork 240 no
132 M16 x 300-400 Threaded rod drilled and epoxied into blockwall 29 no
with Hilti HIT-RE 500
133 Gib Handibrac hold-down including fixings 28 no
134 Damp proof course 100 wide 54 m
135 Damp proof course 150 wide 143 m
136 Damp proof course 200 wide 24 m
Supply the following to be cast in by the Concrete Contractor
137 M20 x 400 4.6/S Threaded rod 124 no
FIRST FLOOR FRAMING
138 200 x 75 Plate fixed to steelwork 85 m
139 250 x 50 HySpan floor joist 743 m
140 250 x 50 Blocking 256 m

5/16/2019 Page 48
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
141 2/250 x 50 Trimmer 26 m
142 2/180 x 50 Blocking 85 m
Sundries
143 M12 x 0-100 4.6/S Bolt fixing timber to steelwork 848 no
144 110 x 150 Long Z275 Galvanised steel nail on plate 358 no
145 Form 2100 x 900 timber shower floor to falls including furring 4 no
strips, timber framing and flooring
FLOORING
146 20 Particle board fixed to floor framing 219 m2
CANOPY FRAMING
147 75 x 50 Soffit batten 222 m
148 100 x 50 Jack stud 7 m
149 100 x 50 Blocking 3 m
150 150 x 50 Joist 77 m
151 200 x 50 Joist 77 m
152 200 x 50 Trimmer 51 m
153 200 x 50 Trimmer fixed to steelwork 59 m
H3.2 Treated
154 30 x 30 Triangular shaped fillet 67 m
155 50 x 30 Tapered purlin 39 m
156 75 x 75 Tapered purlin 226 m
Sundries
157 Bolt fixing 50 timber to steelwork 112 no
PLYWOOD SARKING
CCA D-D Grade H1.2 treated Ecoply
158 19 Thick plywood ceiling diaphragm fixed to timber ceiling 253 m2
framing
CCA CD Grade H3.2 treated Ecoply
159 12 Thick plywood roof diaphragm fixed to timber roof framing 268 m2
160 17.5 Thick plywood roof diaphragm fixed to timber roof framing 151 m2
161 18 Thick plywood fixed to canopy roof framing 61 m2
162 18 Thick plywood fixed to inside face of parapet wall 12 m2
BUILDING PAPER
163 Watergate Plus 295 wall underlay to timber framed wall 123 m2
164 Flexible flashing tape to window and door reveals 363 m

5/16/2019 Page 49
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
INSULATION
165 Allow for manufacturer warranty covering Autex products as item
specified
166 R3.2 140 Thick fibre glass wall insulation 757 m2
167 R2.4 90 Thick fibre glass wall insulation 527 m2
168 R1.8 75 Thick fibre glass wall insulation 438 m2
169 50 Thick Autex GreenStuf AAB insulation to ceiling 113 m2
EXTERNAL LININGS
170 Allow for 10 year manufacturer warranty for sealants as item
specified
171 Allow for 5 year installation warranty for sealants as specified item
6 Fibre Cement soffit lining with expressed joints, fixed in
accordance with manufacturers instructions
172 Allow for 15 year manufacturer warranty as specified item
173 Allow for 2 year installation warranty as specified item
174 To timber framing 123 m2
175 Level 4 stopping to fibre cement soffit lining 123 m2
176 120 Girth two times bent 0.55 colour coated soffit flashing 25 m
9 Fibre Cement Eterpan, fixed in accordance with
manufacturers instructions
177 To timber framed door reveal, 250 wide 96 m
H3.1 Plywood Air Barriers and Bracing
178 15 Thick CCA CD Grade plywood bracing fixed to timber 135 m2
framed wall
179 7 Thick CCA Ecoply air barrier 516 m2
1500 x 300 x 30 Thick Moeding Alphaton extruded clay tiles kiln
fried on and including horizontal rail system, fixed in
accordance with manufacturers instructions
180 Provide site specific warranty as specified item
181 Provide samples as specified item
182 Provide spares as specified item
183 Provide all information required for code compliance item
184 Allow for wind and seismic design as specified item
185 Rates shall include for tile clips, fixings, profiles and weather item
seals as required
186 To timber framed wall 94 m2
187 To steelwork 28 m2

5/16/2019 Page 50
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
188 160 Girth two times bent 1.2 aluminium powdercoated side 23 m
flashing
189 Proprietary cavity closer 46 m
Nuwall E200 vertical extruded aluminium cladding, fixed in
accordance with manufacturers instructions
190 Allow for 100 year manufacturer warranty as specified item
191 Allow for 2 year installation warranty as specified item
192 Provide copies of all relevant Nu-Wall maintenance information item
as specified
193 Provide all information required for code compliance as item
specified
194 To wall cavity battens 317 m2
195 Slotted base channel 161 m
196 Proprietary cavity closure 161 m
197 Female/male external corner including foam closer and cap 50 m
198 Internal corner including foam closer and cap 4 m
199 Jamb flashing cap including base NC139, NC138 and closed 271 m
ceill foam tape
200 35 x 35 x 5 Thick aluminium angle at edge of cladding 3 m
201 Bead of sealant between angle and cladding 3 m
202 PEF Backing rod and sealant 3 m
INTERNAL LININGS
Fibre Cement Board Wall Linings
203 Allow for shop drawings as specified item
204 9 Refined Eterpan panel with negative detail/expressed joints 181 m2
fixed to timber framing
205 Level 5 stopping to fibre cement lining 181 m2
206 22 x 22 x 1.6 Thick EA anodised aluminium angle adhesive 30 m
fixed to base of eterpan wall lining
207 35 x 35 x 1.6 Thick EA aluminium angle 32 m
208 Bead of sealant between lining and roof covering 24 m
209 9 Refined Eterpan lining fixed to timber wall framing 41 m2
210 Level 5 stopping to fibre cement lining 41 m2
Plywood Wall Linings
211 12 Thick BD grade Ecoply fixed to timber framed wall 239 m2
212 Ditto 250 wide 114 m
213 15 Thick CCA CD grade Ecoply bracing fixed to timber framing 251 m2

5/16/2019 Page 51
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpentry (Continued)
INTERNAL TRIM
Aluminium Trim
214 100 High Forman Monz FBS009 powdercoated aluminium 405 m
skirting
Timber Trim (All Pinus Radiata Clears)
215 300 x 45 Mitred skirting to stairs, stepped to suit treads and 18 m
risers
216 180 x 40 Dressed balustrade capping 5 m
217 45 x 20 Architrave 246 m
ACCESS HATCHES
218 560 x 560 Unihatch ceiling access hatch fixed in timber framing 10 no
including surround and sealant
ROOF SAFETY SYSTEM
219 Design and build a roof safety system complete to architects item
approval
End of Section

5/16/2019 Page 52
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Suspended Ceilings
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates shall include for all straight cutting and waste, cutting item
around openings and the like and for all things which penetrate
the ceiling system. Openings for recessed downlights have
been measured
4 The rates shall include for seismic bracing etc., and compliance item
with NZS 1170 which are not shown on the drawings
5 The rates shall include for all fixings as detailed and required item
6 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
7 Systems installed under this contract shall be installed and fixed item
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
8 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
SUSPENSION SYSTEM
9 Rates shall include for all penetrations as required item
10 Rates shall include for all perimeter trims as required item
Rondo Keylock Two-Way Exposed Suspension System to Suit
1200 x 600 Ceiling Tiles
11 Suspension system suspended average 600 (0-1000) from 27 m2
timber floor framing
12 Suspension system suspended average 1600 (1000-2000) from 150 m2
steel roof framing
13 Junction of ceiling with walls including any cutting, edge trims 165 m
and additional suspension
Rondo Keylock Two-Way Exposed Suspension System to Suit
13 Plasterboard
14 Suspension system suspended 0-1000 from timber roof 410 m2
framing
15 Suspension system suspended 1000-2000 from steel roof 74 m2
framing
16 Junction of ceiling with walls including any cutting, edge trims 600 m
and additional suspension

5/16/2019 Page 53
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Suspended Ceilings (Continued)


Rondo Keylock Two-Way Exposed Suspension System to Suit
Two Layers of 13 Plasterboard
17 Suspension system suspended average 600 (0-1000) from 113 m2
timber floor framing
18 Junction of ceiling with walls including any cutting, edge trims 73 m
and additional suspension
CEILING TILES
19 600 x 1200 Armstrong ceiling tiles in suspension grid 177 m2
GENERAL
20 Provide samples as specified item
21 Provide information for operation and maintenance as specified item
22 Provide spare tiles as specified item
End of Section

5/16/2019 Page 54
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Doors
PREAMBLES
1 Items shall be fixed to timber unless otherwise described item
2 The rates shall include for frames, mullions, transoms, glazing item
bars and beads, trims, caulking and pointing, doors, sliding
tracks, hinges and fastenings
3 The rates shall include for re-assembly or part assembly on site item
as necessary
4 All sizes given are approximate and must be checked on site item
prior to manufacture
5 All glass and glazing shall be in accordance with NZS item
4223:1991
6 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
7 Allow for the preparation of shop drawings as specified item
8 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
DOOR AND FRAME SETS
9 Allow for all CS For Doors warranties as specified item
10 Allow for shop drawings as specified item
11 Door dimensions stated are leaf width x leaf height note
Solid core flush panel paint quality doors with Hallmark
Streamline Aluminium Powdercoated frames
12 760 x 2200 High single leaf doorset (D.06) 1 no
13 860 x 2200 High single leaf doorset (D09, D10, D12, D45 to 23 no
D47, D49, D52 to D55, D57 to D68)
14 910 x 2200 High single leaf doorset (D02 to D05, D14, D16 to 18 no
D19, D23 to D30, D32, D33)
15 910 x 2200 High single leaf cavity sliding doorset (D05) 1 no
16 1620 x 2200 High double leaf doorset (D11, D15) 2 no
17 1620 x 2200 High double leaf extended swing doorset (D74) 1 no
18 2000 x 2200 High double leaf doorset (D13) 1 no
19 2762 x 2231 High four leaf top hung bifolding doorset (D07) 1 no
Solid core flush panel paint quality doors and sidelights with
Hallmark Stremline Aluminium Powdercoated frames
20 860 x 2200 High single leaf doorset with 1800 wide toughened 1 no
glazed sidelight with vision strip (D09/W28)
21 910 x 2200 High single leaf doorset with 2100 wide toughened 1 no
glazed sidelight with vision strip (D23/W29)

5/16/2019 Page 55
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Doors (Continued)
Miscellaneous
22 Undercut door for mechanical services 21 no
FIRE DOOR AND FRAME SETS
23 Allow for 5 year warranty for supply and installation item
24 Door dimensions stated are leaf width x leaf height note
-/30/30sm Solid core flush panel paint quality doors with
Hallmark Steel Fire Door Aluminium Powdercoated frame
25 860 x 2200 High single leaf doorset (D71, D72) 2 no
26 860 x 2200 High single leaf doorset with glazed vision panel 2 no
(D69, D70)
-/30/30sm Solid core metal faced doors with steel
powdercoated frame
27 860 x 2200 High single leaf doorset (D56) 1 no
ALUMINIUM DOORS
APL Architectural Series Aluminium Powdercoated Double
Safety Glazed Door and Frame Sections, Complete with
Rebated Timber Reveals and 3M Manifestations
28 890 x 2440 High single door (D31, D36, D43) 3 no
29 1000 x 2400 High single door (D73) 1 no
30 1590 x 2400 High double door (D44, D48, D50, D51) 4 no
31 3250 x 2826 High double door with four fixed sidelights (D01) 1 no
32 4580 x 2572 High double sliding door with two fixed sidelights 2 no
(D21, D22)
ALUMINIUM INTERNAL DOORS AND BORROWED LIGHTS
33 Allow for shop drawings as specified item
Pasa020 105 Series Aluminium Powdercoated Laminated
Single Glazed Door and Borrowed Light Sections, Complete
with Frame and 3M Manifestations
34 2725 x 2232 High overall single door with fixed sidelight (W28) 1 no
35 3059 x 2416 High overall single door with fixed sidelight (W29) 1 no
ROLLER SECTIONAL DOORS
36 Rates are to include for 3-phase motor, door controller, driver item
warning lights and sensors and remote controls
37 Rates are to include for glazing and powdercoated Aluminium item
infill panels
38 Provide one year written manufacturer warranty as specified item
39 Provide one year written installation warranty as specified item
40 Provide shop drawings as specified item

5/16/2019 Page 56
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Doors (Continued)
41 Provide information for operation and maintenance as specified item
42 Provide producer statement as specified item
Metalbilt Steel Roller Shutter Aluminium Powdercoated door
and frame sections
43 4000 x 4000 High automatic sectional door with twenty glazed 8 no
panels and eight aluminium infill panels (D24, D35, D37, D38,
D39, D40, D41, D42)
44 1500 x 2200 High single manually operated roller shutter door 2 no
(D08, D20)
Sundries
45 Sika AT-Facade silicone air seal on PEF backing rod 194 m
46 Grout infill to concrete slab edge rebate following threshold 5 m
installation. Detail 2S/A4.01

5/16/2019 Page 57
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hardware
PREAMBLES
1 The rates shall include for matching fixings item
2 Refer to manufacturers literature for methods of fixing item
3 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
4 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
HARDWARE
5 Allow for samples as specified item
Miscellaneous Hardware
6 750 x 750 x 32 L-shaped stainless steel grab rail 1 no
7 200 Long Caroma Cosmo towel rail with chrome finish 2 no
8 600 Long Caroma Cosmo towel rail with chrome finish 12 no
9 Caroma Liano toilet roll holder with chrome finish 10 no
10 Robinhood Deluxe ironing centre IC1300 1 no
11 LL432SPDP Hat & coat hook 9 no
12 LBRS0706 Braille signage (M/F disabled) 1 no
13 LBRS703 Braille signage (Unisex) 9 no
14 LBRS0704 Braille signage (Shower) 4 no
15 Allow for all construction keying item
16 Allow for master keying and keys item
Hardware to Timber Doors
17 L3572ZSC Classroom function mortice lock 6 no
18 L1801/70SC Square end plate with cylinder hole and 70 lever 21 no
19 L1905/70SC Square end plate with 70 lever 35 no
20 7714DASIL DA Size 1-4 P/A DC Formed cover closer 35 no
adjustable backcheck
21 LA350SC Door stop wall mounted 46 no
22 910 Wide x 200 high kick plate 54 no
23 CL100SC Cavity slider accessible bathroom sliding door lock 1 no
24 L3574ETSC Privacy latch 9 no
25 L1814/70SC Square end plate with privacy indicator emergency 9 no
turn and 70 lever
26 L1904/70SC Square end plate with turn and 70 lever 9 no

5/16/2019 Page 58
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hardware (Continued)
27 LP2SS LW Pull handle 7 no
28 L3574SC Mortice passage latch 16 no
29 L1805/70SC Square end plate and 70 lever 16 no
30 L3570XTSC Mortice night latch cylinder and turn 1 no
31 L1376SC 1370 Series oval cylinder escutcheon 4 no
32 LL841SPDP Flush bolt 150 zinc s/chrome 11 no
33 DW131SC Dust socket 6 no
34 L3572XSC Storeroom function mortice lock 3 no
35 L3570XSC Night latch single cylinder 3 no
36 L3572XTSC Entry lock mortice lock 2 no
37 L1904/70SC Square end plate with turn and 70 lever 2 no
38 7726DASIL Size 2-6 closer adjustable backcheck delayed 2 no
action
39 L3570ELM1SC Electric mortice lock 60 backset 10 no
40 LLC8810 Lead cover 10 no
41 L7580SC LW Roller bolt SC 2 no

5/16/2019 Page 59
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Applied Finishes, Render and Textured Finishes


PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates shall include for: item
4 temporary grounds, screeds and similar item
5 bedding, grouting and pointing materials item
6 cutting and/or making good around pipes, sanitary fixtures and item
similar
7 labour to internal angles item
8 curing of finished work item
9 cleaning down and polishing item
10 covering, protecting and masking surfaces item
11 Fixing and stopping shall be in accordance with manufacturer's item
instructions to the standard required for the various finishes
12 The rates shall include for external salient angles, edges set item
and finished flush with solid plastering in same plane, cutting
and making good around sprinkler heads and similar items
13 The rates shall include for forming and stopping internal and item
external angles to walls and fair edges, cutting and fitting into
grooved and rebated reveals, cutting and fitting around light
fittings, switches and the like and stopping around penetrations
14 Rates for fire stopping shall include for labelling all service item
penetrations as specified
15 Rates shall include for forming control joints item
16 The rates shall include for all noise and fire sealants as item
required
17 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
18 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
BATTENS
19 Gib ST-001 clip on furring channel fixed to timber framed wall 377 m
CEILINGS
13 Standard Gib
20 To suspension system 338 m2

5/16/2019 Page 60
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Applied Finishes, Render and Textured Finishes (Continued)


13 Aqualine Gib
21 To suspension system 145 m2
16 Fyreline
22 To suspension system 113 m2
WALLS
13 Standard Gib
23 To timber framed wall 983 m2
24 To timber framed wall 0-250 64 m
25 To timber framed wall as substrate 157 m2
26 To Gib clip and furring channel 103 m2
13 Aqualine Gib
27 To timber framed wall 422 m2
28 To timber framed wall 0-250 28 m
29 To timber framed wall as substrate 67 m2
30 To Gib clip and furring channel 45 m2
13 Gib Fyreline - GBTL 60
31 To timber framed wall 156 m2
STOPPING
32 Level 4 stopping to Gib wall lining 2,337 m2
33 Level 4 stopping to Gib ceiling lining 596 m2
34 Stopping internal angle between ceiling and wall 962 m
End of Section

5/16/2019 Page 61
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Tiling, Slab and Paving


PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates shall include for thoroughly cleaning and preparing item
surfaces
4 The rates shall include for temporary grounds, screeds and item
similar
5 The rates shall include for bedding, grouting and pointing item
materials
6 The rates shall include for all straight cutting and for making item
good around openings, pipes, sleeves and the like
7 The rates shall include for labour to internal angles item
8 The rates shall include curing, cleaning down and polishing of item
finished work
9 The rates shall include for covering, protecting and masking all item
surfaces necessary
10 The rates shall include for forming all necessary construction item
and expansion joints and sealing with an approved sealant
11 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
12 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
SPLASHBACKS
13 Allow for 10 year manufacturer warranty as specified item
14 Allow for 2 year installation warranty as specified item
150 x 100 Glazed Ceramic White Tiles
15 To plasterboard wall 150 high 7 m
16 Approved sealant at junction with plasterboard wall 16 m
End of Section

5/16/2019 Page 62
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpet and Resilient Finishes


PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates shall include for all straight cutting and for cutting and item
fitting and making good around fittings and openings, pipes,
sleeves and the like
4 The rates shall include for vacuuming or mopping, cleaning, item
covering and protecting and masking any surfaces necessary
5 The rates for floor coverings shall include for all preparation of item
surfaces
6 The rates for laying carpets shall include for cutting, sewing, item
matching pattern or run at all junctions, all waste, stretching and
laying all in accordance with best trade practice
7 The rates for all work shall include for adhesives where item
required
8 The rates for coving to form skirting shall include for any timber item
fillets or other backing necessary, and for internal angles,
external angles and stop ends
9 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
10 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
CARPET
11 Provide 15 year material supply warranty as specified item
12 Provide 2 year material installer warranty as specified item
13 Provide samples as specified item
14 Provide reserve material as specified item
Shaw Show Difuse 59575 610 x 610 Carpet Tiles in Random
Pattern Direct Stuck with Approved Adhesive and in
Accordance with the Specification
15 To concrete floor 363 m2
16 To timber stair treads, risers and landings 19 m2
17 To timber floor 150 m2
ENTRANCE MAT
18 Allow for 5 year manufacturer warranty as specified item
19 Provide 1 year installation warranty as specified item

5/16/2019 Page 63
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpet and Resilient Finishes (Continued)


20 Allow for samples as specified item
Advanced Coral Tread Coralduo Entry Matt with and including
Low Profile ALF3510 Matwell Frame
21 3620 x 2580 Matwell fixed to concrete 1 no
EPOXY FLOORING
22 Provide material supply warranty as specified item
23 Provide material installer warranty as specified item
Dulux Luxafloor Rollcoat PC227 Two Pack High Solids Epoxy
Floor Coating
24 To concrete floor 32 m2
25 2 Thick black vinyl water resistant skirting glue fixed to concrete 30 m
nib, 0-250 high
VINYL
26 Provide 5 year material supply warranty as specified item
27 Provide 1 year material installer warranty as specified item
28 Provide samples as specified item
29 Provide certificates as specified item
30 Allow for testing as specified item
Jacobsens 2.0 Tarkett Optima IQ Vinyl Adhesive Fixed in
Accordance with the Specification
31 To concrete floor 84 m2
32 Cove flooring 0-250 up wall 121 m
33 To timber floor 37 m2
Jacobsens 2.0 Granit Safe T Vinyl Thermowelded and
Adhesive Fixed in Accordance with the Specification
34 To concrete floor 25 m2
35 Cove flooring 0-250 up wall 149 m
36 To timber floor 9 m2
37 Cove flooring 0-250 up shower threshold 8 m
Jacobsens 2.0 Protect Wall Vinyl Resilient Wall Surface Fixed
in Accordance with the Specification
38 To plasterboard lined wall 97 m2
POLISHED CONCRETE
39 Grind, polish and seal concrete floor as specified 42 m2
TRIM
40 TD1. Tredsafe DT036 carpet to vinyl trim 17 m
41 TD2. Tredsafe DT031 carpet to concrete trim 85 m

5/16/2019 Page 64
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Carpet and Resilient Finishes (Continued)


42 TD4 Ecoglo F4151-CP3 Series step noising contrast strip 31 m
43 Tredsafe DT061 to top of coved vinyl 73 m
44 Anodised carpet edge at door sill 11 m
AQURON 2000
45 Provide 15 year warranty as specified item
46 Aquaron 2000 sealer applied to concrete floor prior to laying 109 m2
vinyl
End of Section

5/16/2019 Page 65
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Painting
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 The rates shall include for the provision, erection and removal item
of scaffolding, preparation, rubbing down between coats and
similar work, the protection and/or masking of floors, fittings
and similar work, removing and replacing door and window
furniture and removing splash and spray marks
4 The rates shall include for painting in selected colours in item
respective spaces and differing on several walls etc., and for
cutting-in to line where required
5 Make good and touch up paintwork in this trade and after all item
other trades on completion
6 Provide for setting up samples where required item
7 Provide a warranty as per Dulux Specifications item
8 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
9 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
10 Allow for manufacturer warranties as specified item
11 Allow for applicator warranties as specified item
MAIN BUILDING
EXTERIOR
Apply one coat of Dulux 1 Step Acrylic Primer Sealer &
Undercoat and two coats of Dulux Weathershield to:-
12 Fibre cement soffit lining 123 m2
Approved paint system to:-
13 Plastered concrete nib, 0-250 high 81 m
Apply two coats of Dulux Weathershield X10 to:-
14 Exterior steelwork (all members girthed) 838 m2
INTERIOR
Apply one coat of non-conductive high build epoxy or moisture
cured refined tar urethane to specified thickness to:-
15 Base of steel column, 0-250 girth (Typical column at slab 67 m
edge/S03-01)
5/16/2019 Page 66
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Painting (Continued)
Apply two coats of Dulux Aquanamel to:-
16 Exposed interior steelwork (all members girthed) 27 m2
Apply one coat of Dulux Professional Enviro2 Acrylic Sealer
Undercoat and two coats of Dulux Professional Enviro2 Interior
to:-
17 Plasterboard wall lining 1,871 m2
18 Fibre cement board wall lining 181 m2
19 Concrete masonry wall 88 m2
Apply one coat of Dulux Professional Enviro2 Acrylic Sealer
Undercoat and two coats of Dulux Professional Enviro2 Ceiling
Flat to:-
20 Plasterboard ceiling lining 550 m2
Apply one coat of Dulux 1 Step Acrylic Sealer Undercoat and
two coats of Dulux Wash & Wear Plus Kitchen & Bathroom to:-
21 Plasterboard wall lining 236 m2
22 Fibre cement board wall lining 41 m2
23 Plasterboard ceiling lining 47 m2
Apply one coat of ZONE CAP100, two coats of ZONE
CAP200-1S and one coat of ZONE CAP830 to the specified
thicknesses to:-
24 Plywood wall lining 239 m2
Apply one coat of Dulux 1 Step Acrylic Primer Sealer &
Undercoat and two coats of Dulux Aquanamel to:-
25 Door leaves 236 m2
26 Timber trim, 0-250 girth 5 m
27 Timber trim 7 m2
28 Window and door reveals/architraves 0-250 girth 246 m
CARPORT
Apply two coats of Dulux Weathershield X10 to:-
29 Exterior steelwork (all members girthed) 119 m2
End of Section

5/16/2019 Page 67
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Joinery
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All timber shall be dressed and the sizes stated are nominal item
except where described as (fin) finished
4 Joinery timber, except where otherwise described shall be item
Medium Density Fibreboard
5 The rates for joinery items, except where otherwise described, item
shall include for supply and delivery to site, hanging, fixing or
placing in position
6 The rates shall include for all labours in framing, notching and item
fitting around projections, pipes, light fittings, hatches, grilles
and similar complete with all cleats, packers, wedges and
similar and all nails and screws
7 Items shall be fixed to timber unless otherwise described item
8 The rates shall include for re-assembly or part assembly on site item
as necessary
9 All sizes given are approximate and must be checked on site item
prior to manufacture
10 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
11 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
12 Refer to Specification and the notes on A6 series drawings for item
details of materials and hardware for each type of joinery unit
13 Rates for joinery units are to include for all hardware and fittings item
described and shown on the drawings including
electromagnetic locks
14 Rates for plywood locker units are to include for timber bearers item
Chemfix anchored to concrete slab
JOINERY FITTINGS
15 2813 Long x 600 deep x 915 high kitchenette base cupboard 1 no
unit with Formica top with sink aperture. Drg A6.01
16 2813 Long x 430 maximum deep x 900 high kitchenette wall 1 no
cupboard unit. Drg A6.01
17 1750 Long x 500 deep x 760 high projector screen base 1 no
cupboard unit with Formica worktop. Drg A6.01

5/16/2019 Page 68
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Joinery (Continued)
18 2160 Long x 600 deep x 915 high office base cupboard unit 1 no
with Formica worktop. Drg A6.01
19 1630 Long x 800 deep x 2400 high office open shelving unit. 1 no
Drg A6.01
20 4415 Long x 580 deep x 2400 high pantry open shelving unit. 1 no
Drg A6.02
21 11025 Girth x 915 high L-shaped on plan kitchen base 1 no
cupboard unit with Formica top with sink aperture and 2100
high fridge/freezer unit. Drg A6.02
22 2110 Long x 330 deep x 750 high kitchen open shelving wall 1 no
unit. Drg A6.02
23 3250 Long x 915 high kitchen island base drawer unit with 1 no
Formica worktop. Drg A6.02
24 3100 Long x 600 deep x 900 high workshop base cupboard unit 1 no
with Formica worktop. Drg A6.09
25 3100 Long x 450 deep x 750 high workshop open shelving wall 1 no
unit. Drg A6.09
26 3000 x 750 high office bench unit with Formica workshop 1 no
including concealed wall bracket fixings. Drg A6.09
STAIRCASES
27 1047 Wide staircase comprising 40 thick treads and half 1 no
landing, 20 thick risers and 300 x 45 stringers, total rise 3750.
Drg A6.04
End of Section

5/16/2019 Page 69
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All work shall comply with N.Z. Building Code Sections G1, G12 item
and G13
4 The rates for flashings shall include for folding and bending to item
shape, laps, joints, expansion joints soakers, clips and shaping
at angles and ends
5 The rates shall include for sockets, running joints, connectors, item
back nuts, nipples, connections, incidental fittings, clips,
saddles, brackets, straps, hangers, screws, nails, explosive and
low velocity tool fasteners and other metal fastenings anchors
and/or systems and fixing complete including cutting and
forming holes, supplying and building in sleeves other than fire
rated sleeves
6 The rates for pipework shall include for pipework less than 32 item
diameter shall include for all bends, elbows, tees, junctions,
cleaning eyes and the like. The rates for tees and junctions
shall include for any bends necessary for the required sweep.
The rates for irregular tees and junctions shall include for any
necessary reducers
7 The rates for pipework shall included for all Acoustic Measures item
as Specified
8 The rates for pipework shall include for setting out sleeves item
through wall, floors and ceilings and for escutcheons at wall and
ceiling penetrations.
9 The rates for pipework shall include for supplying and installing item
fire stop collars and all other fire rating measures as required.
10 The rates for pipework in trenches shall include for warning item
tape and trace wire as Specified
11 The rates for pipe insulation shall include for cutting and item
trimming around equipment, fixings, valves and the like. The
rates for insulation to pipes less than 32 diameter shall include
for all bends, elbows, tees, junctions, cleaning eyes and the like
12 The rates for valves shall include for all additional metalwork item
requirements for supports, anchors, brackets etc, mating
flanges, gaskets, bolt unions etc and the preparation of pipe
ends
13 The rates for cylinders and tanks shall include for seismic item
bracing as required by NZS 4603:1985
14 Rates for pipework shall include for expansion joints as item
required

5/16/2019 Page 70
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
15 Systems installed under this contract shall be installed and fixed item
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
16 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
17 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
GENERAL
18 Pay all fees and charges in connection with the plumbing item
installation, comply with all regulations and by-laws, give all
necessary notices and obtain permits
19 Prepare and supply shop drawings as specified item
20 Provide construction drawings as specified item
21 Provide vermin proofing as required item
22 Provide fire separation as required item
23 Give all notices and obtain all approvals as specified item
24 Apply for and pay all fees required for water connections item
25 Prepare, maintain and provide as-built drawings as specified item
26 Prepare and provide maintenance manuals as specified item
27 Provide a 12 month guarantee and maintenance for the item
plumbing works as specified
28 Provide labelling and identification as specified item
29 Provide producer statements on completion item
30 Provide for all quality assurance and associated documentation item
as specified
31 Allow for anchor blocks as specified item
32 Allow for all cleaning, flushing and sterilising systems as item
specified
33 Allow for all testing and commissioning as specified item
BUILDERS WORK
34 Provide for co-operating with other trades and for cutting holes, item
chases, recesses, etc., supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, making good finishes around same and for all
sundry labours
SANITARY FITTINGS
35 Rates shall include for brackets, flush pipes, overflows, plugs item
and washers and similar items where required

5/16/2019 Page 71
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
36 Mercer Riva stainless steel bowl, face based. 1 no
37 Heritage EcoGranit Egmont 1160-20 double bowl with drainer 1 no
38 Caroma Care 800 wall faced Invisi ii suite with backrest 1 no
39 Caroma Leda vitreous china dual flush wall faced ROM boxed 4 no
close-coupled toilet suite
40 Caroma Integra 500 wall basin 1 no
41 Caroma Cube extension wall basin 1 no
42 Caroma Opal 510 wall basin with Opal shroud 4 no
43 Mercer Questo Laundry tub 1 no
44 Mercer X1 XL cleaners sink 1 no
45 3599 Long x 600 wide BA wash bench top with 150 upstand 1 no
and end panels, including two stainless steel sink inserts. Drg
A6.01
RING MAIN HOT WATER SYSTEM
46 Rates for hot water cylinders are to include for all TPR, drain item
cock, drip trays, overflows and tundishes as necessary,
including connections to drains
47 Rates for hot water cylinders are to include for all wall brackets, item
supports, frames, additional ceiling or roof framing and seismic
restraints as required
48 315 hot water cylinder (3x6kw) including all necessary short 2 no
lengths of pipes, fittings, valves, bypasses, control panels,
alarms, equipment, etc which constitute the assembly
49 Pumpset including: single action pump, one non return valve, 1 no
one isolating valve and unions
50 UV sterilizer set including: UV sterilizer test points and isolating 1 no
valve.
HYDROTAP
51 Zip Hydrotap G4 commercial. HT1708 2 no
TAPS AND VALVES
52 Methven Minimalist basin mixer. Echo Vision EV 9101 10 no
53 Robertson Retta mixer with pullout spray 1 no
54 Methven Minimalist shower mixer 8 no
55 Methven Minimalist slide shower with soap holder 8 no
56 Zum sink faucet (Z-SF) 2 no
57 Hose tap 15mm female chrome plates with lockshield cover 7 no
and vacuum breaker
58 Fox automatic demand valve and hose tap, complete including 1 no
all fittings and controls

5/16/2019 Page 72
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
TRAPS AND WASTES
59 Rates for traps shall include for any connections or joints to item
piping and fixtures, appliances or equipment
60 40 PVC trap 12 no
61 50 PVC trap 3 no
62 Floor waste gulley with boss junction and Easiclean grating 5 no
63 Floor waste gulley with boss junction to channel drain outlet, 4 no
with strainer basket
64 65 Untrapped floor waste outlet to channel drain outlet, with 5 no
strainer basket
65 Allproof Equator V900E channel 4 no
66 Allproof Revolver shower waste, vinyl finish with Duco cast iron 4 no
body with combined flashing clamp and gravel stop with
polyethylene dome
TRAP PRIMING DEVICES
67 Rates for trap priming devices shall include for all associated item
isolating valves, solenoid valves and air gap backflow
prevention
68 Rates for trap priming devices shall include for all pipework item
serving their relative gulley traps, complete, including tundishes
69 Trap priming device 2 no
SOIL WASTE AND VENT PIPEWORK
70 Rates for soil, waste and vent pipework shall include for item
inspection points
uPVC
71 40 Waste pipework below slab 19 m
72 40 Waste pipework in wall framing, ceiling space and joinery 7 m
73 50 Waste and vent pipework in wall framing, ceiling space and 35 m
joinery
74 50 Waste pipework below slab 1 m
75 65 Waste pipework below slab 45 m
76 65 Waste and vent pipework in wall framing, ceiling space and 52 m
joinery
77 100 Waste pipework below slab 110 m
78 100 Waste and vent pipework run in wall framing and ceiling 18 m
space
79 40 bend 12 no
80 50 bend 16 no
81 65 bend 20 no

5/16/2019 Page 73
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
82 100 bend 28 no
83 50 x 50 x 40 junction 1 no
84 65 x 65 x 40 junction 10 no
85 65 x 65 x 50 junction 2 no
86 65 x 100 x 65 junction 19 no
87 100 x 100 x 50 junction 11 no
88 100 x 100 x 65 junction 16 no
89 100 x 100 x 100 junction 16 no
90 Flexible connection hydraulic/civil 100 pipe 6 no
91 Penetrate roof, form flashing, bird-proof cowl to 65 terminal 2 no
vent
92 PVC tundish with Hepvo waterless valve 9 no
93 AAV to sink waste 1 no
94 Connect washing machine drain to sink waste 2 no
95 Provide fixture overflow facilities as specified item
Wrap under-slab pipework in two layers of bubble-wrap
96 40 Waste pipework below slab 3 m
97 50 Waste pipework below slab 1 m
98 65 Waste pipework below slab 11 m
99 100 Waste pipework below slab 17 m
Wrap waste pipework with Allproof Acoustiflex Acoustic
Lagging
100 40 Waste pipework in wall framing, ceiling space and joinery 7 m
101 50 Waste pipework in wall framing, ceiling space and joinery 31 m
102 65 Waste pipework in wall framing, ceiling space and joinery 44 m
103 100 Waste pipework run in wall framing and ceiling space 18 m
HOT AND COLD WATER
Pipework - Aquatherm PPR for 32 and Over and Fusiotherm or
Pex for Pipe 25 and Under
104 15 Pipe run in wall framing and ceiling space 315 m
105 20 Pipe run in wall framing and ceiling space 113 m
106 25 Pipe run in wall framing and ceiling space 129 m
107 32 Pipe run in wall framing and ceiling space 30 m
108 40 Pipe run in wall framing and ceiling space 65 m
109 40 bend 7 no
110 40 x 32 x 32 tee 1 no
5/16/2019 Page 74
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
111 40 x 40 x 15 tee 1 no
112 40 x 40 x 20 tee 3 no
113 40 x 40 x 25 tee 4 no
114 Provide chrome plated tails where pipework is exposed item
adjacent fittings
Valves and Fittings
115 15 ISO valve 43 no
116 25 Isolating valve 1 no
117 25 Non return valve 1 no
118 32 Isolating valve 2 no
119 32 Non return valve 1 no
120 40 Isolating valve 2 no
121 40 Strainer 1 no
122 40 Pressure limiting valve 1 no
123 40 Non return valve 1 no
124 Expansion control valve 1 no
125 160 PVC pipe at cold water slab entry penetration, fill with 2 no
compressible foam
BACKUP SUPPLY PUMPSET
126 SHM04P07M single phase pump set with steady press control 1 no
including isolating valves
INSULATION
Cold Water - 13 Armaflex insulation
127 15 Pipe run in wall framing and ceiling space 214 m
128 20 Pipe run in wall framing and ceiling space 54 m
129 25 Pipe run in wall framing and ceiling space 71 m
130 32 Pipe run in wall framing and ceiling space 16 m
131 40 Pipe run in wall framing and ceiling space 65 m
132 25 Isolating valve 1 no
133 25 Non return valve 1 no
134 32 Isolating valve 1 no
135 40 Isolating valve 2 no
136 40 Strainer 1 no
137 40 Pressure limiting valve 1 no
138 40 Non return valve 1 no
Hot Water - 19 Armaflex insulation
5/16/2019 Page 75
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
139 15 Pipe run in wall framing and ceiling space 101 m
140 20 Pipe run in wall framing and ceiling space 60 m
141 25 Pipe run in wall framing and ceiling space 58 m
142 32 Pipe run in wall framing and ceiling space 14 m
143 32 Isolating valve 1 no
144 32 Non return valve 1 no
145 Pumpset and valves 1 no
146 Sterilizer set and valves 1 no
147 Thermo-blending set and valves 2 no
CIVIL WORKS
Pipework
148 12.7 Copper (Fox valve hydraulic line) including excavation 12 m
0-1m deep and backfilling
149 40 PE80 PM12 pipe including trench excavation 0-1m deep and 22 m
backfilling
150 40 PE80 PM12 pipe above ground 11 m
151 40 bend 8 no
152 63 PE80 PN2 pipe including trench excavation 0-1m deep and 30 m
backfilling
153 63 bend 4 no
154 100 UPVC Pn12 pipe including trench excavation 0-1m deep 162 m
and backfilling
155 150 UPVC Pn12 pipe including trench excavation 0-1m deep 248 m
and backfilling
156 100 45 Deg bend, including thrust block 1 no
157 100 11.5 Deg bend, including thrust block 3 no
158 150 22.5 Deg bend, including thrust block 1 no
159 150 11.25 Deg bend, including thrust block 2 no
160 100 End cap including thrust block 1 no
161 150 End cap including thrust block 1 no
162 100/32 Tapping band 2 no
163 40/12.7 Reducer 1 no
164 150/100 Tee including thrust block 2 no
Valves
165 100 Sluice valve, including valve riser and lid 7 no
166 32 Gate valve, steam riser, cast box and lid 2 no

5/16/2019 Page 76
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Hydraulics (Continued)
167 64 Gate valve, steam riser, cast box and lid 1 no
168 Fox demand valve and hose tap on 25 pipe 1 no
Water Connections
169 Rates for street connections are to include for all necessary item
road closures and traffic management, excavation, shoring,
backfill and making good all surfaces and kerbs
170 Connect 100 pipe to existing 100 in Johns Road 1 no
Meters
171 Commercial water meter on 100 pipe, including coordination 2 no
with CCC
Backflow Preventer
172 Rates for backflow preventer are to include for all associated item
valves and fittings, strainers, pipework, chambers including
excavation and backfill, concrete pads and plinths, etc
173 Backflow preventer on 100 pipe, including all fittings, bends, 1 no
strainers, valves, risers complete
174 Backflow preventer chamber and lid 1 no
Water Tank
175 25,000L water tank, including connections, drainage points, 1 no
filter/strainer, ballcock, isolating valves, complete
End of Section

5/16/2019 Page 77
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Drainage
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 All work shall comply with NZ Drainage and Plumbing item
Regulations 1978 with amendments thereto and to the
requirements of the Territorial Authority
4 PVC pipes to foul sewer and stormwater drains shall comply item
with NZS 7649 and be jointed to approval
5 The rates shall include for maintaining faces of drain pipe item
trenches and pits, backfilling, disposal of surplus spoil, forming
pockets beneath collars and all jointing and other incidental
materials
6 The rates for excavation shall include for excavation in any item
material met with excepting hard rock, grading bottoms, boning
to true and even gradients, forming grooves for pipe collars,
and bedding
7 Provide for temporary lights, barricades and all other items item
deemed necessary for the proper protection of the work, the
public, and all other property
8 Keep excavations free from storm or percolating water by item
pumping or other approved means
9 Pay all fees and charges in connection with the drainage item
installation, comply with all regulations and by-laws, submit all
plans, give all necessary notices and obtain consents
10 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
11 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
12 Allow for testing and inspections as Specified item
FOUL DRAINAGE
uPVC
13 100 Pipe including trench excavation 0-1m deep and approved 71 m
bedding
14 100 Bend 15 no
15 100 x 100 x 100 Junction 5 no
16 100 Inspection joint/bend 8 no
17 Connect 100 pipe to wastewater 1 no
18 Connect 100 pipe to manhole 2 no
5/16/2019 Page 78
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Drainage (Continued)
19 Connect 100 pipe to oil interceptor 2 no
20 Connect 100 pipe to diversion chamber 1 no
Valves
21 100 Reflux valve 1 no
STORMWATER DRAINAGE
uPVC
22 80 SN8 Pipe including trench excavation 0-1m deep and 47 m
approved bedding
23 80 bend 5 no
24 80 x 80 x 80 junction 2 no
25 Connect 80 pipe to drainage channel 3 no
26 100 Pipe including trench excavation 0-1m deep and approved 139 m
bedding
27 Connect 100 pipe to drainage channel 1 no
28 100 Bend 11 no
29 100 x 150 x 80 Junction 1 no
30 100 x 150 x 150 Junction 6 no
31 Connect 100 pipe to downpipe 4 no
32 Connect 100 pipe to sump 1 no
33 Connect 100 pipe to soakage pit 1 no
34 Connect 100 pipe to sprinkler room 1 no
MANHOLES
35 Rates for manholes are to include for excavation, sand, gravel item
or other special backfilling and stating the nature of the material
and method of consolidating and all components
Stormwater
36 1200 Diameter manhole with Korum lid for pump lift test 1 no
37 Actuated stormwater/wastewater diversion chamber including 1 no
DN600 concrete manhole and lid
38 900 Diameter perforated manhole including galvanised scruffy 1 no
dome and base (Basin/CC-300, drainage gravel measured
elsewhere)
Foul Sewer
39 Hynds OG1KIT oil interceptor 1 no
40 CSS SD303-1 Manhole with drop structure as per CSS SD 305 1 no
Pump Testing Manhole
41 1200 Diameter x 1.5-2m deep Humes concrete pipe for pump 1 no
testing including with cast iron lid and excavation
5/16/2019 Page 79
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Drainage (Continued)
SUMPS AND GULLY TRAPS
42 Rates for sumps and gully traps are to include for excavation, item
bedding and setting in concrete, backfilling and making good
43 CSS SD325 Single sump with grate 1 no
44 CSS SD325 Double sump with grate 2 no
45 CSS SD327 Corner sump with grate 2 no
46 Overflow relief gully tied into building foundations encased in 1 no
concrete
47 50 Diameter x 600 long concrete drainage chamber 1 no
48 3150 x 2450 Overflow weir including anti scour mat 1 no
SOAKAGE PITS
49 2000 x 1000 x 1-2m Deep soakage pit including excavation and 1 no
fill with free draining boulders
50 3000 x 3000 x 4-5m Deep soakage pit including excavation and 1 no
fill with free draining boulders
51 300 Diameter x 3200 long perforated pipe placed in drainage pit 1 no
including Humes 3001 cast iron lid and 20MPa concrete
surround
52 A29 Geofabric filter material 59 m2
DRAINAGE CHANNELS
53 Rates for drainage channels are to include for excavation, item
bedding and setting in concrete, backfilling, sealants and
making good
54 Accrete Two-Stage drainage channel and threshold grate 16 m
55 Stop end 16 no
56 Drain outlet 8 no
57 200 ACO slot drain with grate 25 m
58 Stop end 2 no
59 Drain outlet 1 no
60 100 Wide Hynds Hauraton Recyfix Plus 100 constant depth 44 m
drainage channel with Class D DI galvanised mesh grate and
inline sump
61 Stop end 4 no
62 Drain outlet 2 no
63 100 Wide Hynds Hauraton Recyfix Plus 100 constant depth 20 m
drainage channel with Class D DI galvanised mesh grate and
inline sump
64 Stop end 8 no
65 Drain outlet 4 no

5/16/2019 Page 80
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Drainage (Continued)
66 Ultra Drain UD60 channel drain with grate 12 m
67 Stop end 2 no
68 Drain outlet 1 no
69 Sump to Ultra drain 1 no
End of Section

5/16/2019 Page 81
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Quantities
3 All work shall be in accordance with the Electrical Workers item
Regulations 1993 and the Electrical Technical Safety
Regulations 1993 and all amendments thereto, including all
Standards and Codes
4 The rates shall include for screws, nails, bolts, nuts, nipples, item
standard cable fixing or supporting clips, saddles, brackets,
straps, rivets, plugs and similar items and all incidental
accessories
5 Work described as laid in trench shall include for excavation, item
maintaining faces of excavation, backfilling, compaction, cable
covers, warning tape and disposal of surplus spoil
6 The rates for electrical conduits, fittings, equipment and similar item
items shall include for all fixings to various building surfaces
7 Except where otherwise described, all subcircuit cabling shall item
be TPS run concealed; where within masonry walls shall be
TPS enclosed in rigid PVC conduit; where complete circuit is
installed within masonry floors or walls shall be TPS or PVC
cables enclosed in steel conduit
8 The rates for subcircuiting shall include for providing an earth item
wire to all outlets
9 The rates for subcircuiting shall include for conduit systems, item
cable support and accessories, timber battens, outlets and
metal flush boxes, mounting blocks, cables, fixings and
connections only. Switches, plug sockets, etc., have been
measured
10 The rates for cable connections shall include for all terminal item
glands and accessories appropriate to the type and size of
cables
11 The rates shall include for the painting and finishing of all items item
of equipment supplied and installed under this section of the
work
12 Pay all fees and charges in connection with the Electrical item
Installation, comply with all regulations and by-laws, give all
necessary notices and obtain permits
13 Provide for fire sealant, penetrations and making good finishes item
around same and for all fire resisting elements as required by
the specification
14 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work

5/16/2019 Page 82
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


15 Systems installed under this contract shall be installed and fixed item
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
16 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
17 Provide for co-operating with other trades and for cutting holes, item
chases, recesses, etc., supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, making good finishes around same and for all
sundry labours
18 Provide all as-built, shop drawings operation and maintenance item
manuals
19 Provide all producer statements, room check lists, electrical item
certificates etc.
20 Provide all guarantees and warranties item
21 Provide all instruction/training to employer's staff item
22 Allow to demonstrate all system/s to the Electrical Engineer item
23 Provide all testing and commissioning item
24 Provide for all necessary cable ladder/tray/ cable basket and item
associated fittings as specified, not measured hereunder
25 Provide for all earthing item
26 Provide for all communications earthing item
27 Provide for all cable numbering and ferruling item
28 Provide for all labelling and identification item
29 Allow for full co-ordination with other contractors on site item
30 Allow for full maintenance of the completed installation for a item
period of 12 months
31 Allow for all shutdowns, working outside normal hours and item
maintaining continual operation of electrical services during all
stages of the project
32 Provide temporary connections within the building as required item
33 Allow for any demolition and disconnection work associated item
with the project
34 Penetrate, sleeve and re-seal foundation of building for 50 duct 4 no
35 Penetrate, sleeve and re-seal foundation of building for 80 duct 2 no
36 Penetrate, sleeve and re-seal foundation of building for 100 4 no
duct
Ducts

5/16/2019 Page 83
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


37 The rates for PVC duct shall include for sundry bends (not item
measured hereunder), tees, sealant, draw wire, etc.
38 32 Duct/sleeve buried direct in trench complete with draw wire 50 m
39 40 Duct/sleeve buried direct in trench complete with draw wire 23 m
40 50 Duct/sleeve buried direct in trench complete with draw wire 11 m
41 50 (Red) Duct/sleeve buried direct in trench complete with draw 33 m
wire
42 80 (Green) Duct/sleeve buried direct in trench complete with 33 m
draw wire
43 100 Duct/sleeve buried direct in trench complete with draw wire 334 m
44 Seal end of 32 duct 4 no
45 Seal end of 40 duct 4 no
46 Seal end of 50 duct 2 no
47 Seal end of 100 duct 10 no
48 ACO Cable pit/ draw pit complete with lid - CP 1 4 no
SUPPLY AUTHORITY MAIN SUPPLY
49 Allow for all Supply Authority costs and fees associated with item
establishing and electrical supply to the installation
50 Allow for all fees and permits required for each stage of the item
contract
51 Allow to arrange with the Supply Authority for the disconnection item
of the existing mains cabling and removal of metering if
required
52 Arrange with the nominated power company and energy item
supplier for the provision of metering
MAINS
Cable
53 4 x 120mm2 1c Cu XLPE mains cable/s - underground from 44 m
site transformer to MSB, drawn through duct - Cable 1
Terminations
54 Terminate 4 x 1c x 120mm2 Cu XLPE mains cable/s 2 no
SUBMAINS
Cable
55 4 x 120mm2 1c Cu XLPE + 35mm2 ECC sub main from MSB 40 m
to GCP, part run on cable tray, part run in underground duct -
Cable 2
56 12 Core x 2.5mm2 Control cable from MSB to GCP, part run on 40 m
cable tray, part run in underground duct - Cable 3

5/16/2019 Page 84
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


57 4 x 70mm2 1c Cu XLPE + 25mm2 ECC sub main from MSB to 56 m
DB:2, part run on cable tray, part run in underground duct -
Cable 5
58 12 Core x 2.5mm2 Control cable from MSB to DB:2, part run on 56 m
cable tray, part run in underground duct - Cable 5
Terminations
59 Terminate 4 x 120mm2 1c Cu XLPE + 35mm2 ECC sub main 2 no
cable/s
60 Terminate 12 Core x 2.5mm2 control cable 4 no
61 Terminate 4 x 70mm2 1c Cu XLPE + 25mm2 ECC sub main 2 no
SWITCHBOARDS
62 All switchboards shall include (but not limited to) earthing, item
switch gear, metering, CTs, controls, interconnections, load
shedding, circuit breakers, fire sealing, all as specified and
drawn
63 The rates for all switchboards shall include fixing, all necessary item
supports, method of connection to mains, provision of metering
and all details of spare capacity required
64 The rates for switchboards shall include for interwiring and
connections between components and control gear within the
board
65 Main switchboard MSB, incorporating DB:1, DB:1M 1 no
66 Distribution board DB:2, incorporating DB:2A , DB:2M 1 no
67 Generator connection panel and enclosure 1 no
68 Allow to provide and install a laminated sign adjacent MSB 1 no
69 Allow to provide and install surge protection as specified item
70 Allow to provide and install a load shedding device within the item
main switchboard as specified
LIGHTING CIRCUITS
71 Refer to switchboard legends for full details of circuit wiring, item
looping and core requirements
From Local DB to lighting outlet
72 Circuit wiring to ceiling mounted lighting outlet 204 no
73 Circuit wiring to ceiling suspended lighting outlet 17 no
74 Circuit wiring to exterior pole/bollard mounted lighting outlet 5 no
75 Circuit wiring to exterior wall mounted lighting outlet 30 no
76 Circuit wiring to in-ground lighting outlet 3 no
77 Circuit wiring to joinery mounted lighting outlet 3 no
78 Circuit wiring to emergency/exit light outlet 21 no
From Local DB to switching outlet
5/16/2019 Page 85
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


79 Circuit wiring to one way switch 1 no
80 Circuit wiring to timer switch T30 5 no
81 Circuit wiring to timer switch T60 5 no
82 Circuit wiring to daylight switch - Lx 1 no
83 Circuit wiring to motion detector - MD1 42 no
84 Circuit wiring to motion detector - MD2 6 no
85 Circuit wiring to motion detector - MD3 6 no
86 Circuit wiring to motion detector - MD4 1 no
87 Circuit wiring to switch plate Lx 56 no
POWER CIRCUITS
88 Refer to switchboard legends for full details of circuit wiring, item
looping and core requirements
From Local DB to Socket outlet
89 Circuit wiring to single switched socket outlet - DR - 20A and 2 no
isolator
90 Circuit wiring to single switched socket outlet - DW and isolator 1 no
91 Circuit wiring to single switched socket outlet - DH - 15A 1 no
92 Circuit wiring to single switched socket outlet - FR and isolator 1 no
93 Circuit wiring to single switched socket outlet - G, 15A in floor 1 no
box
94 Circuit wiring to single switched socket outlet - I 1 no
95 Circuit wiring to single switched socket outlet - MW and isolator 1 no
96 Circuit wiring to single switched socket outlet - UBH, 16A and 1 no
isolator
97 Circuit wiring to single switched socket outlet - WM and isolator 2 no
98 Circuit wiring to externally mounted single switched socket 1 no
outlet - IP 15A
99 Circuit wiring to single switched socket outlet - 3 phase 32A 1 no
From Local DB to Socket outlet
100 Circuit wiring to double switched socket outlet - A 80 no
101 Circuit wiring to double switched socket outlet - ASE 1 no
102 Circuit wiring to double switched socket outlet - AU 7 no
103 Circuit wiring to double switched socket outlet - AV 10 no
104 Circuit wiring to double switched socket outlet - B 28 no
105 Circuit wiring to double switched socket outlet - BU 17 no
106 Circuit wiring to double switched socket outlet - CP 15A 1 no

5/16/2019 Page 86
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


107 Circuit wiring to double switched socket outlet - DP 4 no
108 Circuit wiring to double switched socket outlet - IP53 2 no
109 Circuit wiring to double switched socket outlet - JP 1 no
110 Circuit wiring to double switched socket outlet - J in floor box 1 no
111 Circuit wiring to double switched socket outlet - TD 2 no
112 Circuit wiring to double switched socket outlet - TDE 2 no
113 Circuit wiring to double switched socket outlet - TV 15 no
114 Circuit wiring to double switched socket outlet - W 6 no
From Local DB to Quad Socket outlet
115 Circuit wiring to quad switched socket outlet in floor box 3 no
From Local DB to Fixed Wire Outlet
116 Circuit wiring to permanent connection - AP-INL - suspended 4 no
117 Circuit wiring to permanent connection - DOOR (including all 8 no
limit switches, controls etc.)
118 Circuit wiring to permanent connection - EXTRT 1 no
119 Circuit wiring to permanent connection - FAP 1 no
120 Circuit wiring to permanent connection - GATE (duct and trench 2 no
measured elsewhere)
121 Circuit wiring to permanent connection - FSPUMP (duct and 1 no
trench measured elsewhere)
122 Circuit wiring to permanent connection - HOOD 2 no
123 Circuit wiring to permanent connection - HOB 2 no
124 Circuit wiring to permanent connection - HWC 1 no
125 Circuit wiring to permanent connection - HWC 3 phase 1 no
126 Circuit wiring to permanent connection - H1 8 no
127 Circuit wiring to permanent connection - H2 and thermostat 1 no
128 Circuit wiring to permanent connection - OVEN 2 no
129 Circuit wiring to permanent connection - PUMP 1 no
130 Circuit wiring to permanent connection - CPUMP 1 no
131 Circuit wiring to permanent connection - SEC 1 no
From Local DB to Outlet
132 Circuit wiring to isolation reset switch - KR 1 no
133 Circuit wiring to isolation reset switch - IR 1 no
LIGHT FITTINGS

5/16/2019 Page 87
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


134 The rates for light fittings shall include for all necessary lamp item
holders, flexible cord connections, sleeving, control gear, lamps
and tubes, diffusers, purpose made brackets and supports, etc.
all as specified and detailed and for fixing to ceilings, soffits or
channel unless otherwise described and shall be in accordance
the Specification and Schedule of Luminaires
135 The rates for light fittings shall include for sealant against the item
ingress of moisture
136 The rates for light fittings shall include for drivers/transformers item
137 Refer to Schedule of Luminaires for full details of light fittings item
138 Light fitting type A1 12 no
139 Light fitting type B1 14 no
140 Light fitting type B2 6 no
141 Light fitting type B3D 11 no
142 Light fitting type B4 2 no
143 Light fitting type D1 1 no
144 Light fitting type D2 16 no
145 Light fitting type D3 2 no
146 Light fitting type D4 2 no
147 Light fitting type F1 - suspended 11 no
148 Light fitting type F1E - suspended 4 no
149 Light fitting type F2 10 no
150 Light fitting type F2E 4 no
151 Light fitting type F3 - suspended 2 no
152 Light fitting type F4 19 no
153 Light fitting type F5 2 no
154 Light fitting type F5 - externally mounted 4 no
155 Light fitting type H2 2 no
156 Light fitting type IG1 - in ground fitting 2 no
157 Light fitting type IG2 - in ground fitting 1 no
158 Builders work in connection with in-ground fittings 3 no
159 Light fitting type J1 8 no
160 Light fitting type J1D 10 no
161 Light fitting type J2D 17 no
162 Light fitting type J5 21 no
163 Light fitting type J6 5 no
164 Light fitting type LED1 - joinery mounted 1 no

5/16/2019 Page 88
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


165 Light fitting type LED2 - joinery mounted 1 no
166 Light fitting type LED3 - joinery mounted 1 no
167 Light fitting type M1 8 no
168 Light fitting type P1 - pole mounted 5 no
169 7.6m Square pole complete with foundations, hold downs and 5 no
mounting brackets
170 Builders work in connection with pole 5 no
171 Light fitting type ST - externally mounted 2 no
172 Light fitting type W1 - externally mounted 13 no
173 Light fitting type W2 - externally mounted 6 no
174 Light fitting type W3 4 no
175 Light fitting type W4 - externally mounted 5 no
176 Light fitting type W5D 20 no
177 Light fitting type W6 4 no
178 Light fitting type W7 4 no
Emergency
179 Light fitting type EM1 6 no
180 Light fitting type ES1 10 no
181 Light fitting type EM2 2 no
182 Light fitting type EM3 - soffit mounted 2 no
183 Light fitting type EM3 1 no
SUB CIRCUIT FITTINGS
184 Refer to Socket Outlet Legend for full details of sockets, item
isolators, plugs, flexes etc.
185 The rates for switches shall include for wall boxes and similar
items
Light Switches
186 One way switch 1 no
187 Timer switch T30 5 no
188 Timer switch T60 5 no
189 Daylight switch - Lx 1 no
190 Motion Detector - MD1 42 no
191 Motion Detector - MD2 6 no
192 Motion Detector - MD3 6 no
193 Motion Detector - MD4 1 no
Switch Plates
5/16/2019 Page 89
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


194 Switch plate LA 2 no
195 Switch plate LB 1 no
196 Switch plate LC 5 no
197 Switch plate LD 1 no
198 Switch plate LF 20 no
199 Switch plate LG 8 no
200 Switch plate LH 3 no
201 Switch plate LJ 2 no
202 Switch plate LK 3 no
203 Switch plate LL 2 no
204 Switch plate LM 1 no
205 Switch plate LN 2 no
206 Switch plate LO 1 no
207 Switch plate LQ 1 no
208 Switch plate LR 1 no
209 Switch plate LS 3 no
Single Socket Outlets
210 Single switched socket outlet - DR - 20A - complete with 2 no
isolator
211 Single switched socket outlet - DW - complete with isolator 1 no
212 Single switched socket outlet - DH - 15A 1 no
213 Single switched socket outlet - FR - complete with isolator 1 no
214 Single switched socket outlet - G - 15A floor box mounted 1 no
215 Single switched socket outlet - I 1 no
216 Single switched socket outlet - MW - complete with isolator 1 no
217 Single switched socket outlet - UBH - 16A complete with 1 no
isolator
218 Single switched socket outlet - WM - complete with isolator 2 no
219 Single switched socket outlet - 1 phase 15A externally mounted 1 no
220 Single switched socket outlet - 3 phase 32A 1 no
Double Socket Outlets
221 Double switched socket outlet - A 80 no
222 Double switched socket outlet - ASE complete with bolt on 1 no
security cover
223 Double switched socket outlet - AU 7 no
224 Double switched socket outlet - AV 10 no
5/16/2019 Page 90
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


225 Double switched socket outlet - B 28 no
226 Double switched socket outlet - BU 17 no
227 Double switched socket outlet - CP - 15A 1 no
228 Double switched socket outlet - DP 4 no
229 Double switched socket outlet - IP53 2 no
230 Double switched socket outlet - JP 1 no
231 Double switched socket outlet - J - floor box mounted 1 no
232 Double switched socket outlet - TD 2 no
233 Double switched socket outlet - TDE 2 no
234 Double switched socket outlet - TV 15 no
235 Double switched socket outlet - W 6 no
Quad Socket Outlets
236 Quad switched socket outlet - floor box mounted 3 no
Fixed Wire Outlets
237 Refer to Permanent Connection Legend for full details of fixed item
wire outlets, isolators, plugs, flexes etc.
238 Permanent connection - AP-INL - suspended 4 no
239 Permanent connection - DOOR - including all limit switches, 8 no
controls, status lights etc.
240 Permanent connection - EXTRT 1 no
241 Permanent connection - FAP 1 no
242 Permanent connection - GATE - externally mounted 2 no
243 Permanent connection - FSPUMP - externally mounted 1 no
244 Permanent connection - HOOD 2 no
245 Permanent connection - HOB 2 no
246 Permanent connection - HWC 1 no
247 Permanent connection - HWC -3 phase 1 no
248 Permanent connection - H1 8 no
249 Permanent connection - H2 including thermostat 1 no
250 Permanent connection - OVEN 2 no
251 Permanent connection - PUMP 1 no
252 Permanent connection - CPUMP 1 no
253 Permanent connection - SEC 1 no
Others
254 Floor box complete with lid and associated conduits- FB1 4 no

5/16/2019 Page 91
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


255 Kitchen isolation reset switch - KR 1 no
256 Iron isolation reset switch - IR 1 no
Appliances
257 Thermostat T1 1 no
Generator Inlet
258 Generator inlet - GEN 1 no
MISCELLANEOUS
Electrical Cable Tray
259 The rates for cable carriers shall include cutting and jointing
cable for carriers at fittings together with cutting or forming
openings in cable carriers for conduits, entries from equipment
and control gear and similar items
260 The rates for cable carriers shall include for cradles, pinracks
for supporting cables and similar items and suitable earthing
261 The rates for cable ladder/tray shall include fire rated item
suspensions as required by the specification
262 The rates for cable ladder/tray shall include dividers to allow item
separation of ELV services
263 Soffit mounted 300 ladder/tray, include all suspensions, 23 m
hangers and the like
264 Soffit mounted 300 ladder/tray (in selected colour), include all 33 m
suspensions, hangers and the like
265 Soffit mounted 450 ladder/tray, include all suspensions, 50 m
hangers and the like
266 450 Bend 6 no
267 300 to 450 Bend/transition 2 no
268 300 x 450 x 450 Tee intersection 1 no
269 450 x 450 Set down 2 no
Dropper
270 40 Dropper in timber framed wall 8 m
ELECTRICAL FOR MECHANICAL
271 Refer to Specification EL.44 and drawings for full details of the item
electrical for mechanical system
272 Design, supply, test and commission the electrical installation item
for Mechanical Services as required and in accordance with the
Specification

5/16/2019 Page 92
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


273 Design, supply, test and commission the Mechanical Services item
control system including (but not limited to) detailed design,
supply, installation, controls, hardware, software, wiring,
terminations, containment and support, interfacing ,
programming and integration as required, testing,
commissioning, maintenance and instruction complete, all as
specified and to the approval of the engineer
ELECTRICAL FOR HYDRALUIC AND PLUMBING
274 Provide a hydraulic and plumbing control system complete, item
refer Specification EL.45 for full details
275 Outlets, circuit wiring and fittings have been included in the item
general measure, allow here for all other hydraulic and
plumbing controls including (but not limited to) cabling/wiring,
isolators, cabinets, racks, relays and other associated
hardware/componentry
LIGHTING CONTROL
276 Provide a lighting control system complete, refer to drawing item
E2.3 and specification EL.49 for full details
277 Light fittings, circuit wiring and fittings have been included in the item
general measure, allow here for all other lighting controls
including (but not limited to) cabling/wiring, ELV wiring,
cabinets, racks, relays and other associated
hardware/componentry
PILOT LIGHTING
278 Provide a lighting control system complete, refer Specification item
EL.48 for full details
279 Light fittings, circuit wiring and fittings have been included in the item
general measure, allow here for all other pilot lighting controls
including (but not limited to) cabling/wiring, ELV wiring,
cabinets, racks, relays and other associated
hardware/componentry
EMERGENCY LIGHTING
280 Provide an evacuation lighting control system complete, refer item
Specification EL.50 for full details
281 Light fittings and circuit wiring have been included in the item
general measure, allow here for all other emergency lighting
controls including (but not limited to) fittings, cabling/wiring,
cabinets, racks, relays and other associated
hardware/componentry
CHORUS CABLING
282 Allow to notify Client who will arrange disconnection and item
isolation of the existing incoming Chorus lines
283 Liaise with Chorus and the Client to enable incoming Chorus item
services to be re-established
STRUCTURED CABLING CAT 6

5/16/2019 Page 93
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


284 Refer to Specification EL.51.2, EL.52 and EL.53 and drawings item
for full details of structured cabling systems
285 Structured cabling, equipment and outlets have been measured item
as a guide only, contractors are to allow for all
controls/isolators/switches including (but not limited to) cabling,
wiring, fittings, brackets and other associated
hardware/componentry
286 Chorus demarcation frame item
287 Customer demarcation frame item
288 Patch panel item
289 Structured cabling item
290 Data outlet - D1 20 no
291 Data outlet - D1W 6 no
292 Data outlet - D2 18 no
293 Data outlet - TV/D2 10 no
294 Data outlet - D3 16 no
295 Data outlet - D4 2 no
296 Data outlet - D6 1 no
297 Patch cords item
AV SYSTEM AND TELEVISION AERIAL SYSTEM
298 Refer to Specification EL.54, EL.55 and drawings for full details item
of the Audio and Visual systems
299 AV System equipment and outlets have been measured as a item
guide only, contractors are to allow for all design,
controls/isolators/switches including (but not limited to) cabling,
wiring, fittings, brackets and other associated
hardware/componentry
300 AV Outlet - TV 10 no
301 AV Outlet - TV1 3 no
302 AV Outlet - TV4 1 no
303 AV Outlet - BP 2 no
304 AV Outlet - SPK 1 1 no
305 AV Outlet - SPK 2 6 no
306 AV Outlet - SPK 3 1 no
307 AV Outlet - SPK 4 2 no
308 Speaker AA 4 no
309 AV Outlet - AV1 1 no
310 AV Outlet - AV2 1 no

5/16/2019 Page 94
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


311 AV Outlet - AV3 1 no
312 AV Outlet - AV4 1 no
313 AV Outlet - AV5 1 no
314 AV Outlet - AV6 1 no
315 AV Outlet - AV7 1 no
316 AV Outlet - AV8 2 no
317 AV Outlet - AV9 2 no
318 Antenna [UHF, FM and satellite] item
SECURITY SYSTEM
319 Refer to Specification EL.56 and drawings for full details of the item
security system
320 Security cabling, equipment, doors and outlets have been item
measured as a guide only, contractors are to allow for all
controls/isolators/switches including (but not limited to) cabling,
wiring, fittings, brackets and other associated
hardware/componentry
321 Gallagher Controller 6000 control panel item
322 Expanders as required, including power supply. item
323 Connection to an off site main client computer. item
324 T Series readers as indicated on drawings item
325 Key drawer locking system item
326 Connections to door hardware item
327 Interface to the buildings fire alarm system item
328 Interface with door hold back systems item
329 Rack mounted PC item
330 Programming of the system/s item
331 MIFARE tag or card Allow to provide and programme 200 200 no
cards.
Doors
332 Rates for security to doors shall include (but not be limited to) item
the following;
- Electromagnetic Lock x 1 (Allow to wire and connect
electromagnetic lock)
- T20 Access reader on the exterior of the building
- Bond sensing of strike lock
- Localised alarm if door held open for set period
- Door locked 24/7. Double badge to unlock door
- Interconnection to Gallagher based system
- Suitably rated power supply with 25% spare capacity
- Interconnection to building fire alarm system to unlock on fire
condition

5/16/2019 Page 95
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


333 SD01 Entry Single Swing Door 1 no
334 SD03 Internal Single Swing Door 1 no
335 SD14 Internal Single Swing Door 1 no
336 SD19 Internal Single Swing Door 1 no
337 SD31 Entry Single Swing Door 1 no
338 SD32 Internal Single Swing Door 1 no
339 SD36 Entry Single Swing Door 1 no
340 SD43 Entry Single Swing Door 1 no
341 SD48 Entry Double Swing Door 1 no
342 SD56 Internal Single Swing Door 1 no
343 SD69 Internal Single Swing Door 1 no
344 SD70 Internal Single Swing Door 1 no
345 SD73 Entry Single Swing Door 1 no
GATE ACCESS
346 Refer to Specification EL.57 and drawings for full details of the item
gates access system
347 Engage a specialist contractor to provide and install the entry item
gate management system
348 Allow to interface the gate system with the Gallagher security item
system
349 Gate 1 access control system including (but not be limited to) 1 no
the following;
- Induction coil set in to concrete slab
- Keypad/prox reader KP
- Gate motor controller
- Safety beam sender/receiver CB
- Strobe light & bollard ST
- IP66 Emergency stop
- In-ground coil
350 Gate 2 access control system including (but not be limited to) 1 no
the following;
- Induction coil set in to concrete slab
- Keypad/prox reader KP
- Gate motor controller
- Safety beam sender/receiver CB
- Strobe light & bollard ST
- IP66 Emergency stop
- In-ground coil
INTERCOM SYSTEM
351 Refer to Specification EL.58 and drawings for full details of the item
intercom system
352 Engage a specialist contractor to provide and install the video item
intercom system

5/16/2019 Page 96
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Electrical Installations (Continued)


353 Allow to interface the intercom system with the Gallagher item
security system and other systems throughout the building
FIRE DOOR HOLD BACK
354 Refer to Specification EL.59 and drawings for full details of the item
smoke stop and fire door hold back system
355 Engage a specialist contractor to provide and install the smoke item
stop and fire door hold back system
356 Allow to interface the hold back system with the Gallagher item
security system and other systems throughout the building
End of Section

5/16/2019 Page 97
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Mechanical Installations
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Quantities
3 The rates shall include for sockets, running joints, connectors, item
back nuts, nipples and pipe and duct fixings such as supporting
clips, saddles, brackets, hangers, straps, screws, nails,
explosive and low velocity tool fastening anchorsand/or
systems and fixing complete including cutting and forming
holes, supplying and building in sleeves other than fire rated
sleeves
4 Prices are to include for all labour, plant, materials, necessary item
for the complete and proper performance of the work, including
the supply and installation of all steel or other grilles associated
with the mechanical services in accordance with the
Specification
5 Prices are to include for fire protection collars, dampers and item
seals for all penetrations through fire rated walls by pipework,
ducts and any other equipment provided in this Trade as
required.
6 Rates are to include for all pipe and fitting supports and item
expansion, movement and settlement provisions
7 The rates for pipe insulation shall include for cutting and item
trimming around equipment, fixings, valves and the like. The
rates for insulation to pipes less than 32 diameter shall include
for all bends, elbows, tees, junctions, cleaning eyes and the like
8 Rates for pipe work shall include for protection where passing item
through and/or under floor slabs as required
9 The rates shall include for painting and finishing of all items of item
equipment supplied and installed under this section of work
10 Rates shall include for all costs involved in carrying out the work item
in stages and at different times during the contract period to suit
the construction programme and sequence of work
11 Systems installed under this contract shall be installed and fixed item
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
12 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL item
13 Provide for paying all royalties, expenses and claims in item
connection with patent rights and indemnify the Architect,
Engineer and Employer against any such claims

5/16/2019 Page 98
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Mechanical Installations (Continued)


14 Pay all fees and charges in connection with the Mechanical item
Services installation, comply with all regulations and by-laws
give all necessary notices and obtain permits as required
15 Provide for supervision and programming item
16 Allow for all identification, labelling etc., all in accordance with item
the Specification
17 Provide suppliers certificates of compliance as specified item
18 Provide layout and system design drawings as specified item
19 Provide contractors certificate of compliance as specified item
20 Provide design and workmanship requirements as specified item
21 Provide samples as specified item
22 Allow for testing and commissioning as specified item
23 Provide operational information as specified item
24 Provide a twelve month guarantee for the works as specified item
25 Provide for extended guarantees as specified item
26 Provide for quality assurance as specified item
27 Provide for maintenance manuals and data sheets as specified item
28 Provide for shop drawings and as built drawings as specified item
29 Allow for maintenance as specified item
30 Provide technical details for plant as specified item
31 Allow for spares, tools and the like item
32 Allow to supply and install all other equipment and supply all item
labour not specifically scheduled and necessary to render the
systems fully functional as Specified
33 Allow for the design, fabrication and installation of plant support item
as required
PLANT AND EQUIPMENT
34 Rates for plant and equipment shall include for flexible item
connections to ductwork as necessary
35 Rates for plant and equipment shall include for support, item
hangers, plinths, platforms, vibration and isolation mounts,
flexible connections etc., as required to ductwork and
ancillaries, supply of motor starters, speed controllers and
handling/ coordination of relevant switchgear
Heat Recovery Ventilators
36 Rates for HRVs are to include for air filters on return and fresh item
air connections
37 Air Change HRV-IC-400 (HRV2) 1 no
38 Air Change ERV-IC-300 (HRV1) 1 no

5/16/2019 Page 99
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Mechanical Installations (Continued)


39 Air Change ERV-IC-300 (HRV3) 1 no
Dehumidifiers
40 Air Solutions Aider 80L portable dehumidifier (D1) 1 no
Fans
41 Fantech TD-350/125SIL (EF1) 1 no
42 Fantech WJ-200RILKIT (EF2) 1 no
43 Fantech TD-350/125SIL (EF3) 1 no
44 Fantech EWE154 (EF4) 1 no
45 Fantech JCE-202-3 (TF1) 1 no
46 Fantech TD-500/150SIL (TF2) 1 no
Heat Pumps
47 Rates for heat pump units are to include for all refrigerant and item
condensate pipework between them and their respective
cassette unit and all other condensate pipework, drain trays,
and tundishes as necessary, including connections to drains
48 Daikin FFQ50C2VEB compact cassette (HP1) 1 no
49 Daikin FFQ35C2VEB compact cassette (HP2) 1 no
50 Daikin FFQ50C2VEB compact cassette (HP3) 1 no
51 Daikin FFQ50C2VEB compact cassette (HP4) 1 no
52 Daikin FFQ35C2VEB compact cassette (HP5) 1 no
53 Daikin FHQ50BW1A under ceiling suspended (HP6) 1 no
54 Daiken RXS50K2V1B HP1/OU outdoor unit 1 no
55 Daiken RXS35K2V1B HP2/OU outdoor unit 1 no
56 Daiken RXS50K2V1B HP3/OU outdoor unit 1 no
57 Daiken RXS50K2V1B HP4/OU outdoor unit 1 no
58 Daiken RXS50K2V13 HP5/OU outdoor unit 1 no
59 Daiken RZQ55OAV1 HP6/OU outdoor unit 1 no
Electric Heaters
60 Devi Comfortline CL750 ceiling mounted radiant panel (EH1, 15 no
EH4)
61 Devi Comfortline CL 30 suspended radiant panel (EH2) 6 no
62 Devi Comfortline CL 18 suspended radiant panel (EH3) 2 no
63 Smooth-Air EDH3030PW duct heater (DH1) 3 no
64 Wall mounted panel heater - H1 8 no
65 Wall mounted panel heater - H2 1 no
DUCTS

5/16/2019 Page 100


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Mechanical Installations (Continued)


66 All ductwork support and ancillaries shall comply with the duct item
construction manual of SMACNA Inc (USA) low velocity
systems
Rigid Circular Ducts
67 125 Diameter rigid ductwork 12 m
68 Bend to 125 diameter duct 1 no
69 150 Diameter rigid ductwork 88 m
70 Bend to 150 diameter duct 7 no
71 Blank end to 150 diameter duct 3 no
72 125 Spigot to 150 diameter duct 11 no
73 150 Spigot to 150 diameter duct 3 no
74 150 to 125 Diameter duct reducer 1 no
75 200 Diameter rigid ductwork 38 m
76 Bend to 200 diameter duct 4 no
77 Blank end to 200 diameter duct 5 no
78 125 spigot to 200 diameter duct 1 no
79 150 spigot to 200 diameter duct 8 no
80 200 spigot to 200 diameter duct 1 no
81 200 to 150 Diameter duct reducer 2 no
82 250 Diameter rigid ductwork 31 m
83 Bend to 250 diameter duct 4 no
84 250 to 200 Diameter duct reducer 1 no
85 150 Spigot to 250 diameter duct 1 no
86 300 Diameter rigid ductwork 36 m
87 Bend to 300 diameter duct 11 no
88 Blank end to 300 diameter duct 2 no
89 125 Spigot to 300 diameter duct 3 no
90 150 Spigot to 300 diameter duct 1 no
91 200 Spigot to 300 diameter duct 2 no
92 300 to 250 Diameter duct reducer 1 no
93 350 Diameter rigid ductwork 31 m
94 Bend to 350 diameter duct 10 no
95 Blank end to 350 diameter duct 1 no
96 350 to 200 Diameter duct reducer 2 no
97 150 Spigot to 350 diameter duct 2 no

5/16/2019 Page 101


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Mechanical Installations (Continued)


98 200 Spigot to 350 diameter duct 1 no
99 Connect ductwork to range hood item
Insulated Flexible Ductwork
100 125 Diameter flexible ductwork 49 m
101 150 Diameter flexible ductwork 71 m
102 200 Diameter flexible ductwork 10 m
103 250 Diameter flexible ductwork 8 m
Fire Dampers
104 Halton BSD-PW fire damper to 150 diameter duct 2 no
105 Halton BSD-PW fire damper to 200 diameter duct 3 no
106 Halton BSD-PW fire damper to 300 diameter duct 1 no
Dampers
107 Butterfly damper to 125 diameter duct 17 no
108 Butterfly damper to 150 diameter duct 14 no
109 Butterfly damper to 200 diameter duct 1 no
110 Butterfly damper to 250 diameter duct 2 no
INSULATION
111 Rates for insulation to pipework and ductwork shall include for item
application and forming around brackets, hangers, flanges,
fittings, valves etc., pockets, sockets and the like
25 Thick Insulation to Outside of Ducts
112 125 Diameter rigid ductwork 12 m
113 150 Diameter rigid ductwork 58 m
114 200 Diameter rigid ductwork 38 m
115 250 Diameter rigid ductwork 23 m
116 300 Diameter rigid ductwork 36 m
117 350 Diameter rigid ductwork 31 m
GRILLES, DIFFUSERS AND ROOF COWLS
118 Grilles and diffusers shall be powder coated item
119 Rates shall include for insulated cushion boxes, opposed blade item
dampers, spigots and concealed fixings as required
120 Rates for grilles and louvres that penetrate the external item
envelope shall include for alls sealants and flashings to make it
weathertight
121 Holyoake CMP 51 225 x 225 grille (S1) 1 no
122 Holyoake CMP-51-OBD 150 x 150 grille (S2) 4 no

5/16/2019 Page 102


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Mechanical Installations (Continued)


123 Holyoake CMP11 300 x 300 grille (S3) 1 no
124 Holyoake CMP 21-OBD 225 x 225 grille (S4) 1 no
125 Holyoake CMP 21 225 x 225 grille (S5) 1 no
126 Holyoake CMP 21 300 x 300 grille (S6) 1 no
127 Holyoake LDH1200 300 x 150 grille (S7) 2 no
128 Holyoake CMP3-11-OBD 150 x 150 grille (S8) 10 no
129 Holyoake CMP-11-OBD 150 x 150 grille (S9) 5 no
130 Holyoake RLL23-RC25 250 x 250 grille (T1) 3 no
131 Holyoake RLL23-RC 150 x 150 (T2) 1 no
132 Holyoake Pair of RLL23-RC25 450 x 200 grille (T3) 2 no
133 Holyoake Pair of RLL23-RC25 300 x 150 grille (T4) 5 no
134 Holyoake RLL23-RC25 175 x 175 grille (E1) 15 no
135 Holyoake RLL23-RC25 150 x 150 grille (E2) 3 no
136 Holyoake LDH1200 450 x 200 grille (E3) 1 no
137 Holyoake OHL-F-45 600 x 450 louvre (L1) 6 no
138 Holyoake OHL-F-45 300 x 250 louvre (L2) 2 no
139 Holyoake OHL-F-45 650 x 450 louvre (L3) 2 no
140 810 x 1210 Holyoake aluminium powdercoated laminated argon 1 no
filled double glazed low-E3 window, complete with
programmable remote control, rain sensor and rebated timber
reveal (W_LO-01)
CONTROL SYSTEMS
141 The control system has been included in the Electrical Services item
section of this Schedule of Quantities
ELECTRICAL FOR MECHANICAL
142 The electrical for mechanical system has been included in the item
Electrical Services section of this Schedule of Quantities
BUILDERS WORK
143 Allow for all builders work in connection including cutting holes, item
chases, recesses etc, supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, include for fire rating as required and making
good
End of Section

5/16/2019 Page 103


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Exterior Elements
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
3 Refer to the relevant trade sections of this schedule of item
quantities for the appropriate preamble items
4 All measurement of excavation, filling and backfilling is in item
accordance with Section 4 Groundworks
5 All measurement of concrete is in accordance with Section 6 item
Concrete
6 The rates shall include for levelling, grading, trimming and item
similar items in preparing surfaces of filling to all surfaces for
road pavements
7 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
8 Provide for making and testing samples of mortar and grout as item
specified
9 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
GENERAL
10 Provide Quality Assurance Certificate as specified item
11 Provide for quality management item
12 Provide producer statements as specified item
13 Carry out all testing as specified item
14 Provide as-builts as specified item
15 Provide traffic management as specified item
16 Provide health and safety management plan as specified item
EROSION AND SEDIMENT CONTROL
17 Refer to Erosion & Sediment Control Management Plan item
(ESCMP) along with Environment Canterbury's Erosion and
Sediment Control Guidelines 2007. Rates to include installation,
maintenance throughout the course of the contract,
removal/restoration of control measures as contract progress.
Install devices as appropriate for current stages only
18 Allow for all inspections and testing as specified item
19 Stabilised vehicle entrance/exit points onto council roads are to item
be maintained throughout the course of the contract

5/16/2019 Page 104


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Exterior Elements (Continued)


20 Form 500 tall earth bund, using on site topsoil, around the 300 m
perimeter of the site. Bund is to prevent uncontrolled vehicle
movements across the site and separate clean and dirty water
diversion paths - PROVISIONAL ITEM
21 Surface stabilisation for all exposed areas which are likely to be 4,000 m2
left without any erosion and/or dust controls for more than 5
days. Sprayed with suitable stabilising agent - PROVISIONAL
ITEM
22 Installation and removal of silt fencing as required (Refer Ecan 200 m
ESC design guide for installation details) - PROVISIONAL ITEM
EXCAVATION AND FILL
23 Trim and compact subgrade to CBR min 5 2,771 m2
24 AP7 Sand blinding, nominal thickness 2,448 m2
25 150 Thick AP65 sub base 2,448 m2
26 250 Thick AP65 sub base 324 m2
27 100 M/4 AP40 base-course 2,771 m2
28 Excavate in hardfill for concrete edge thickening including 25 m3
battering
ASPHALT
29 Provide for testing as specified item
30 50 Thick AC16 asphalt including seal coat 324 m2
PAVING
31 Rates for paving shall include for construction joints, dowel item
bars, sawcuts, placing and finishing
32 Rates shall include for curing compounds as required item
33 Concrete paving shall be laid to falls and crossfalls item
34 G500E-SE72 seismic mesh to paving 2,448 m2
35 D12 bar at pavement slab perimeter 4,353 kg
36 100 Thick 30 MPa utility concrete paving coloured with 4kg/m3 1,991 m2
black oxide. P2
37 100 Thick 30 MPa exposed aggregate "Canterbury Concrete 394 m2
Waimak". P3
38 100 Thick 30 MPa coloured concrete, Peter Fell #260. P4 64 m2
KERBS
39 Concrete kerb and channel to CSS SD601-1 including 189 m
excavation, backfill, forming, reinforcing etc
40 Form 1000 wide drop in kerb and channel for overflow 1 no
41 Concrete nib kerb to CSS SD602-2 including excavation, 207 m
backfill, forming, reinforcing etc

5/16/2019 Page 105


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Exterior Elements (Continued)


STORMWATER BASIN
Basin Fill
42 150 Deep sandy top soil (3 parts sand to 1 part top soil) 155 m2
43 200 Deep screened top soil 295 m2
44 250 Deep 19 premix sand 155 m2
45 300 Deep AP40 77 m3
46 Geo-synthetic clay liner 257 m2
47 Reinstated pit run 310 m3
48 Uniformly graded 100-50 clean free draining boulders 84 m3
49 Bidm A29 geofabric 98 m2
50 200 Deep river boulders to overflow 3 m2
Concrete Weir Wall
51 250 Deep TNZ M/4 AP40 basecourse 24 m2
52 20 MPa concrete foundation including placing and finishing 6 m3
53 260 High edge formwork 8 m2
54 20 MPa concrete wall including placing and finishing 4 m3
55 Formwork to sides of wall 38 m2
56 HD12 Rod 489 kg
57 200 Wide stormwater pipe outfall including Denso tape 1 no
ROAD MARKING
58 Allow for applicator warranty as specified item
59 Approved carpark delineation lines 89 m
60 Approved disabled carpark sign 2 no
GABION RETAINING WALL
61 Excavate for gabion wall 0-1.5m deep and remove from site 198 m3
62 CCC AP65 or similar granular backfill in compacted layers 99 m3
63 Bidim A14 or similar between gabion and backfill 165 m2
64 1000 x 1000 x 1500 Gabion unit with basket and rockfill as per 114 no
Specification
FENCING
65 1800 High chain link fence set in to concrete kerb including 165 m
posts
66 1800 High Boundaryline Durapanel 'Vecta' style steel panel 2 m
fence including posts and footings
IRRIGATION
67 Design and install irrigation system as specified item
5/16/2019 Page 106
Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Exterior Elements (Continued)


TIMBER FENCE & SEATS
68 1800 High board and batten fence including excavation, 17 m
foundations, posts and finish
69 Single leaf pedestrian gate including all hardware 1 no
70 3000 Long x 700 wide timber box seat including internal timber 2 no
frame, all supports and fixings
SOFT LANDSCAPING/PLANTING
71 100 Deep good quality screened soil, spread and prepared 756 m2
ready for lawn sowing
72 Hydroseed standard mix lawn 756 m2
73 Good quality screened soil, spread and prepared ready for 164 m3
planting areas 545m2
74 100 Deep good quality mulch spread over planting areas 545 m2
75 Alnus Cordata/Italian Alder tree 45 litre planted in tree pit, 1 no
including excavation, carting away spoil, approved topsoil
backfill, two timber stakes and hessian ties
76 Cordyline Australis/Grass Palm tree 30 litre planted in tree pit, 1 no
including excavation, carting away spoil, approved topsoil
backfill, two timber stakes and hessian ties
77 Fagus Sylvatica 'Dawyck Gold'/European Beech tree 45 litre 3 no
planted in tree pit, including excavation, carting away spoil,
approved topsoil backfill, two timber stakes and hessian ties
78 Platanus Orientalis/Oriental Plane Tree 45 litre planted in tree 4 no
pit, including excavation, carting away spoil, approved topsoil
backfill, two timber stakes and hessian ties
79 1500 x 1500 x 1000 High precast concrete tree frame 4 no
80 Coprosma Propinqua 'Red Rocks'/Coprosma 'Red Rocks' 3L 19 no
81 Apodasmia Similis/OiOi 3L 328 no
82 Chionochloa Flavicans/Minature Toetoe 3L 136 no
83 Coprosma Hawera/Hawera Coprosma 3L 210 no
84 Muehlenbeckia Astonii/Shrubby tororaro 3L 206 no
85 Provide 6 month maintenance period item
MISCELLANEAOUS
86 Horizon SF3000 bollard, including concrete footing, excavation 12 no
and backfill as required
87 7300 Wide commercial vehicle crossing to CCC SD607 & 1 no
SD611 with dished channel to align with existing
88 8200 Wide commercial vehicle crossing to CCC SD607 & 1 no
SD611 with dished channel to align with existing
89 27200 Wide commercial vehicle crossing to CCC SD607 & 1 no
SD611 with dished channel to align with existing

5/16/2019 Page 107


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Exterior Elements (Continued)


90 2400 x 1200 Double sided free standing static sign including 1 no
excavation and foundations
91 Hapuka Rock 15 no
End of Section

5/16/2019 Page 108


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Fire Protection
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Quantities
3 The rates shall include for all costs involved in carrying out the item
work in stages and at different times during the contract period
to suit the construction programme and sequence of work
4 Systems installed under this contract shall be installed and fixed item
in accordance with NZS 4219; allow for all earthquake
protection/requirements in accordance with the Specification
5 The Contractor shall take all necessary steps to ensure that all item
the obligations placed on the "Person Conducting a Business or
Undertaking (PCBU)" pursuant to the Health and Safety at
Work Act 2015 are complied with at all times
6 Provide for fire sealant, penetrations and making good finishes item
around same and for all fire resisting elements as required by
the specification
7 Pay all fees and charges in connection with the Fire Protection item
Installation, comply with all regulations and by-laws, give all
necessary notices and obtain permits
GENERAL
8 Provide all as-built, shop drawings, operation and maintenance item
manuals
9 Provide for all service and maintenance logbooks item
10 Provide for a Certificate of Compliance for the sprinkler system item
11 Provide for a Certificate of Compliance for the fire alarm system item
12 Provide for all labelling and identification item
13 Provide all guarantees and warranties item
14 Provide all instruction/training to employer's staff item
15 Provide for all completion documentation, producer statements item
etc.
16 Allow for all inspections, commissioning, acceptance testing item
and final completion
17 Allow for the service and maintenance period as specified item
FIRE PROTECTION
18 Design, supply, install, test, commission and maintain the fire item
sprinkler system in accordance with the Fire Protection
Specification (section B) and NZS 4541
19 Provide hand held fire fighting equipment in accordance with item
the Fire Protection Specification (section B) and NZS 4503

5/16/2019 Page 109


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Fire Protection (Continued)


20 Design, supply, install, test, commission and maintain the fire item
alarm systems in accordance with the Fire Protection
Specification (section B) and NZS 4512
BUILDERS WORK
21 Provide for co-operating with other trades and for cutting holes, item
chases, recesses, etc., supplying and building in all sleeves and
fixings as required through concrete, blockwork, timber and
other materials, making good finishes around same and for all
sundry labours
SUPPLIED RATES
22 Fire alarm panel 1 no
23 Alarm acknowledgment unit (reset switch) 1 no
24 ASE device and connection 1 no
25 Manual call point 1 no
26 Sprinkler head (below ceiling) 1 no
27 Sprinkler head (concealed) 1 no
28 Sprinkler head (cover-plate) 1 no
29 Sprinkler head (external) 1 no
30 Portable hand held fire extinguisher 1 no
31 Evacuation sounder recessed 1 no
32 Evacuation sounder surface mounted 1 no
33 Fire rated wiring 1 m
34 Non fire rated wiring 1 m
35 Non PVC rated wiring 1 m
36 Pipework insulation 1 m
Labour
37 Sprinkler Labour (ordinary time) 1 hr
38 Sprinkler Labour (overtime) 1 hr
39 Fire Alarm Labour (ordinary time) 1 hr
40 Fire Alarm Labour (overtime) 1 hr
41 Design Engineer 1 hr
42 Administration 1 hr
43 Mark up on materials %
44 Mark up on Subcontractors %
45 Main contractors margin %
End of Section

5/16/2019 Page 110


Rawlinsons Ltd
Schedule of Prices

Project: ANZSMM Training Details: Example Schedule in ANZSMM 2018


Building:

Item Description Quantity Unit Rate Total

Included Sums
PREAMBLES
1 Refer to the Drawings and Specification for full details and item
descriptions of materials and workmanship
2 Refer to the General and Special Conditions of Contract and item
Tender and to the Preliminary and General section of the
Specification and this Schedule of Prices
MONETARY ALLOWANCES
3 Allow the provisional sum of $1,000 (One Thousand Dollars) for item
internal door signage
4 Allow the provisional sum of $7,500 (Seven Thousand Five item
Hundred Dollars) for the feature wall and footings
5 Allow the provisional sum of $10,000 (Ten Thousand Dollars) item
for precast concrete walls and footings
6 Allow the provisional sum of $1,000 (One Thousand Dollars) for item
wall access hatches
7 Allow the provisional sum of $2,500 (Two Thousand Five item
Hundred Dollars) for concrete pad under exterior AC units