830,01
VI PLESTERANT, WALL, & FLOOR WORK
A BUILDING VILLA 1st FIRST FLOOR
1 Plaster Wall 1 Pc: 5 Ps 2.164,59 m2 A.4.4.2.6 80.000,00 173.167.315,20
2 Acian 2.164,59 m2 A.4.4.2.27 33.258,00 71.989.982,11
3 Natural Cement Polished (Ceramic Tiles) 456,42 m2 Ls 250.000,00 114.104.552,73
4 Installation of calsiboard ceiling 3.5 mm 333,84 m2 Ls 325.000,00 108.497.750,04
5 White Palimanan Stone 52,32 m2 Ls 385.000,00 20.143.507,62
6 Paving Block 118,38 m2 Ls 250.000,00 29.595.923,75
7 Roster 16,41 m2 Ls 2.000.000,00 32.818.800,00
638.116.216,07
VII DOORS AND WINDOWS
Double Swing door+ Accessories (Solid Teakwood
1 3,00 Bh Ls 25.000.000,00 75.000.000,00
Door) Entrance
Singgle door Swing+ Accessories (Solid Teakwood
1 19,00 Bh Ls 18.000.000,00 342.000.000,00
Door)
Double Sliding door Windows+ Accessories
3 8,00 Bh Ls 15.000.000,00 120.000.000,00
(Alumuniun Frame fin. Black color)
Windows + Accessories (Alumuniun Frame fin.
4 10,00 Bh Ls 13.000.000,00 130.000.000,00
Black color)
7 Clear Glass Skylight 12 mm thick 1,52 m2 Ls 3.500.000,00 5.306.822,50
672.306.822,50
VIII ELECTRICAL AND MECHANICAL WORK
A ELECTRICAL INSTALLATION
Downlight Di. 4 Inch With Glass Cover 1xE27 LED
1 139,00 Bh ME.1 247.390,00 34.387.210,00
7W/220 V WW
Small Hanging Lamp (Model/Type TBA) 1xE27 LED
2 8,00 Bh ME.1 247.390,00 1.979.120,00
7W/220 V WW
3 Flexible Strip Light LED 4W/MTR 12 Vdc WW 9,00 Bh ME.1 247.390,00 2.226.510,00
4 Floor UP - LIGHT MR16 LED 7W/12 Vdc WW 66,00 Bh ME.1 247.390,00 16.327.740,00
5 Indoor Spot Light LED COB 7W/220 V 6,00 Bh ME.1 247.390,00 1.484.340,00