Professional Documents
Culture Documents
A BUILDING CONSTRUCTION
I VILLA 3 MAWUN 1,00 2.470.410.649,55 2.470.410.649,55
B POOL
I SWIMMING POOL (3,5 x9 m) 1,00 284.740.228,98 284.740.228,98
TOTAL 2.755.150.878,53
ROUNDED OFF 2.755.150.000,00
363.107.296,89
VI ROOF
137.328.660,10
VII DOORS AND WINDOWS
Double Swing door+ Accessories (Solid
1 2,00 Bh Ls 25.000.000,00 50.000.000,00
Teakwood Door) Entrance
Singgle door Swing+ Accessories (Solid
2 8,00 Bh Ls 18.000.000,00 144.000.000,00
Teakwood Door)
Double Sliding door Windows+ Accessories
2 6,00 Bh Ls 15.000.000,00 90.000.000,00
(Alumuniun Frame fin. Black color)
Windows + Accessories (Alumuniun Frame fin.
4 5,00 Bh Ls 13.000.000,00 65.000.000,00
Black color)
6 Clear Glass Railing 10 mm thick (Balcon) 17,92 m2 Ls 1.000.000,00 17.922.817,00
366.922.817,00
VIII ELECTRICAL AND MECHANICAL WORK
A ELECTRICAL INSTALLATION
Downlight Di. 4 Inch With Glass Cover 1xE27
1 76,00 Bh ME.1 247.390,00 18.801.640,00
LED 7W/220 V WW
Small Hanging Lamp (Model/Type TBA) 1xE27
2 7,00 Bh ME.1 247.390,00 1.731.730,00
LED 7W/220 V WW
3 Flexible Strip Light LED 4W/MTR 12 Vdc WW 9,00 Bh ME.1 247.390,00 2.226.510,00
4 Floor UP - LIGHT MR16 LED 7W/12 Vdc WW 5,00 Bh ME.1 247.390,00 1.236.950,00
5 Indoor Spot Light LED COB 7W/220 V 8,00 Bh ME.1 247.390,00 1.979.120,00