- cellar to empty to locate the flyge pump sump. Install pump and hook up same
1/7
Pre-spud Checklist # 3
- mudlog ready
2/7
Pre-spud Checklist # 3
3/7
Pre-spud Checklist # 3
- install submersible pump in water pit and hook up and test same
- handrails to install between brine pit and obm tank walk way
- 20” casing to lay out and strap – i nstall shoe and cut out channels
4/7
Pre-spud Checklist # 3
- lay out 20 riser by racks – check all turnbuckles and chains are working and lubricated
- 40” casing to cut off level with ground. Cut slots in cellar wall
5/7
Pre-spud Checklist # 3
- check all chains and turnbuckles are functioning for holding down the 20” casing
- 20 casing to lay out, clean and measure and shoe to install. Channels to cut in shoe joint
- bha to lay out, rabbit and measure. Record stabilizer blade gauges.
- geolograph hooked up
- poor boy degasser line to complete.bop platform on back side to install so flowline can be
hooked up on surface pipe.
6/7
Pre-spud Checklist # 3
- ensure the flowline to derrick shakers is clean, to allow the flow of cuttings to the end derrick
shaker
- Prior to acceptance pressure test the rig pumps against kelly to 3000psi each pump, just to
check the integrity of the connections.
- Cut a few of meters of formation to test the whole system (1x kelly down).