PHILIPPINE RURAL DEVELOPMENT PROJECT a
l
ENVIRONMENTAL AND SOCIAL SAFEGUARDS u
e
COMPLIANCE MONITORING FORM s
(Communal Irrigation System)
INSTRUCTIONS: The SES personnel shall accomplish the FORM. Check ( )the appropriate column to indicate level of compliance with the
environmental management measures listed below. If compliance could not be determined for a particular environmental management
measure, marked the column as “NA” or Not Applicable. Give additional information or remarks, if any. Use the back page of this FORM for
additional space to write on. Accomplished Form should be signed by the SES personnel and should be posted in the field office.
B. Environmental Safeguards
Proper waste management is performed onsite. (i.e. waste
1
segregations, house keeping)
The river banks and riverbed within and adjacent to site is
2
protected from oil/grease, and other wastes.
The river flow is not affected by the works within and adjacent to
5
sites.
on geo-hazard prone areas, buffer zones and other relevant
6
mitigation measures were applied
7 the diverted water flow is free from constructions and other debris
V
a
l
u
e
s
F
i
r
s
t
Project Cost: ______________________________________________________________________________________________
Date Monitor/Inspection: ______________________________________________________________________________________________ P
Project Activities: ______________________________________________________________________________________________ e
r
COMPLIANT
i
Mitigation Measures Additional Information/ Remarks o
YES NO N. A. d
impounded water/water source is properly regularly maintained for
16
public safety
low lying/adjacent areas are protected from flooding due to water
17
flow diversion
F
i
r
s
t
Project Cost: ______________________________________________________________________________________________
Date Monitor/Inspection: ______________________________________________________________________________________________ P
Project Activities: ______________________________________________________________________________________________ e
r
COMPLIANT
i
Mitigation Measures Additional Information/ Remarks o
YES NO N. A. d
C. Social Safeguards
Right-of-Way Acquisition cleared is consistent or compliant to
1
Right-of-Way acquired.
V
a
l
u
e
s
F
i
r
s
t
Project Cost: ______________________________________________________________________________________________
Date Monitor/Inspection: ______________________________________________________________________________________________ P
Project Activities: ______________________________________________________________________________________________ e
r
COMPLIANT
i
Mitigation Measures Additional Information/ Remarks o
YES NO N. A. d
Awareness campaigns or local ordinances on healthy and safe
work place or signages against transmitable diseases (e.g. HIV,
10 vector-borne diseases, and other communicable/transmissible
diseases, anti-smoking campaign, drug- free working environment)
displayed in camp site
_____________________ ______________________________
MLGU/PLGU-SES Contractor
_____________________
RPCO - SES
_____________________
PSO - SES
_____________________
NPCO - SES