Project: ETAP Page: 1

Location: 19.0.1C Date: 31-03-2021

Contract: SN:

Engineer: Revision: Base


Study Case: LF
Filename: Bus Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Z1 2.404 2.383 -2.397 -2.380 6.6 3.4 100.0 99.8 0.21

Z10 0.560 0.274 -0.560 -0.274 0.5 0.2 96.0 95.9 0.08

Z11 0.515 0.244 -0.514 -0.244 0.8 0.3 95.9 95.7 0.15

Z12 0.454 0.209 -0.452 -0.207 2.5 2.0 95.7 95.1 0.59

Z13 0.392 0.172 -0.391 -0.171 0.7 0.9 95.1 94.9 0.22

Z14 0.271 0.091 -0.271 -0.091 0.3 0.3 94.9 94.8 0.14

Z15 0.211 0.081 -0.210 -0.080 0.3 0.2 94.8 94.7 0.13

Z16 0.150 0.060 -0.150 -0.060 0.2 0.3 94.7 94.5 0.20

Z17 0.090 0.040 -0.090 -0.040 0.0 0.0 94.5 94.4 0.06

Z18 0.361 0.161 -0.361 -0.161 0.2 0.2 99.8 99.7 0.05

Z19 0.271 0.121 -0.270 -0.120 0.8 0.7 99.7 99.4 0.36

Z2 1.936 2.159 -1.910 -2.145 26.0 13.2 99.8 98.9 0.94

Z20 0.180 0.080 -0.180 -0.080 0.1 0.1 99.4 99.3 0.07

Z21 0.090 0.040 -0.090 -0.040 0.0 0.1 99.3 99.2 0.06

Z22 0.940 0.457 -0.936 -0.455 3.1 2.1 98.9 98.5 0.36

Z23 0.846 0.405 -0.841 -0.401 5.1 4.0 98.5 97.8 0.66

Z24 0.421 0.201 -0.420 -0.200 1.3 1.0 97.8 97.5 0.33

Z25 0.949 0.973 -0.947 -0.971 2.5 1.3 97.0 96.9 0.19

Z26 0.887 0.946 -0.884 -0.945 3.2 1.6 96.9 96.6 0.25

Z27 0.824 0.920 -0.813 -0.910 10.8 9.5 96.6 95.5 1.12

Z28 0.753 0.890 -0.745 -0.884 7.5 6.5 95.5 94.7 0.80

Z29 0.625 0.814 -0.622 -0.812 3.7 1.9 94.7 94.3 0.35

Z3 0.881 1.648 -0.873 -1.644 8.2 4.2 98.9 98.5 0.40

Z30 0.422 0.212 -0.420 -0.210 1.5 1.5 94.3 93.9 0.41

Z31 0.270 0.140 -0.270 -0.140 0.2 0.2 93.9 93.8 0.09

Z32 0.060 0.040 -0.060 -0.040 0.0 0.0 93.8 93.8 0.03

Z4 0.753 1.564 -0.745 -1.560 7.4 3.8 98.5 98.1 0.37

Z5 0.685 1.530 -0.670 -1.517 14.9 12.9 98.1 97.0 1.04

Z6 -0.339 0.525 0.340 -0.523 0.5 1.6 97.0 96.9 0.17

Z7 -0.540 0.423 0.545 -0.419 5.4 3.9 96.9 97.1 0.26

Z8 0.688 0.319 -0.684 -0.317 3.9 2.8 97.1 96.5 0.61

Z9 0.624 0.297 -0.620 -0.294 3.3 2.4 96.5 96.0 0.56

121.6 83.0

* This Transmission Line includes Series Capacitor.