Paouignan Substation

POS. WORDING Unit Qty


-1

Paouignan Substation
I. ELECTRICAL PART
1 Studies Set 1
2 63 kV line arrival bay
228 mm² cable connections with all parts of
2.1 Set 1
this connection
63 kV tempered glass insulator string (3
2.2 Set 2
phases) with all necessary equipment
2.3 Ground wire Set 1
2.4 Grounding of the ground wire U 1
2.5 Steel gantries and frames Set 1
Set of 3 63kV surge arresters, including
2.6 Set 1
support frame
All other necessary equipment and
2.7 Set 1
connections
63/20 kV Transformer Bay of the
3
PAOUIGNAN substation
63 kV line disconnector including support
3.1 Set 1
frame
63 kV three-pole circuit breaker including
3.2 Set 1
support frame
228 mm² cable connections, busbar /
3.3 disconnector / circuit breaker / transformer Set 1
with all parts for this connection
Set of 3 HTB surge arresters, including
3.4 Set 1
support frame
Rdn(Neutral resistance) with connections
3.5 Set 1
(NGR)
4 MV equipment
20 / 0.4 kV auxiliary supply transformer,
4.1 U 1
160 kVA
4.2 Compact 2I + 2O panel U 1
Transformer inlet/incomer circuit breaker
cubicle, 400A, with all the measurement and
4.3 Set 1
protection equipment provided for in the
specification on 1250A busbars
Transformer outgoing feeder circuit breaker
cubicle, 400A, with all the measurement and
4.4 Set 2
protection equipment provided for in the
specification on 1250A busbars

PT cubicle with all the measurement and


4.5 protection equipment provided for in the Set 1
specification on 1250A busbars.
4.6 400 kVA Distribution Transformer (DP) Set 1
5 Medium Voltage Cables
24 kV MV cables, 3x1 x 630 mm², between
5.1 63/20 kV transformer and 20 kV Set 1
transformer incomer cubicle
Set of 3 external ends for the 24 kV - 630
5.2 Set 2
mm² MV cable
Set of 3 interior ends for the 24 kV - 630
5.3 Set 2
mm² MV cable
24 kV MV cable, 3 x 1 x 240 mm², train
Set 1
link -2I + P
Set of 3 interior ends for the 24 kV - 240
5.4 Set 1
mm² MV cable
Set of 3 400A connectors for the 24 kV -
5.5 Set 1
240 mm² MV cable

24 kV MV cable, 3 x 1 x 95 mm², between 2


5.6 Set 1
I + P and TSA(aux service transfo)

Set of 3 250A connectors for the 24 kV - 95


5.7 Set 2
mm² MV cable

6 MV Outgoing Feeder
24 kV MV cable, 3 x 1 x 240 mm², MV
6.1 Set 1
going feeders
Internal termination boxes for the 24 kV -
6.2 Set 1
240 mm² MV cable
External termination boxes for the 24 kV -
6.3 Set 1
240 mm² MV cable
Aero Underground lift assembly including
6.4 fixing, cable protection, MV connections, Set 1
earth and earth link
Set of 3 20kV surge arresters overhead-
6.5 Set 1
underground rise
Construction of the earth network of the
7 Set 1
substation using 75 mm² CU cable
8 Interior equipment Low Voltage UA
Panel for AC auxiliary services 400/230 V
8.1 with all the equipment foreseen in the Set 1
specification
Panel for DC auxiliary services 125 V with
8.2 all the equipment foreseen in the Set 1
specification
Panel for DC auxiliary services 48 V with
8.3 all the equipment foreseen in the Set 1
specification
8.4 BATTERIES 127 V U 1
8.5 Charger 127 V d.c. U 1
8.6 BATTERIES 48 V U 1
8.7 Charger 48 V d.c. U 1
Low voltage cables and power circuit
9
accessories
9.1 Cables Set 1
9.2 Cable accessories Set 1
Electrical installation and interior
10 Set 1
lighting
11 Exterior lighting Set 1
Control - command and measurement
12
equipment per tranche:
Tranche Outgoing line 63 kV GLAZOUE,
12.1 Set 1
cabling included
63 kV Tranche of the 63/20 kV transformer,
12.2 Set 1
cabling included
MV panel protection management cabinet,
12.3 Set 1
including cabling
General section (auxiliaries, telecom alarms,
12.4 Set 1
other alarms), cabling included
12.5 Position calculator Set 1
Power monitors/Power measurement station
12.6 Set 1
on cubicles
Information clustering cabinets for CNC
13 (TS TM TC),signalling, measurement Set 1
and control
Wiring according to the Teleinformation
13.1 Set 1
Plan (PTI) given in the specifications
13.2 Wiring additional information U 1
14 Realization of fire detection circuit Set 1
Transformer verification, regulator
15 verification and all accessories (TC, Set 1
boxes, etc.)

16 Temporary work for continuity of service Set 1


Operating equipment (board, earthing,
17 measuring poles, etc.)
Set 1
25kVA 230 / 400V emergency generator
18 Set 1
with automatic changeover
Transformer fault and alarm control and
19 Set 1
monitoring equipment
Total electrical part

II CIVIL ENGINEERING PART


1 Studies Set 1
2 Buildings
Building construction: excavations,
2.1 concrete, formwork, masonry, screeds, Set 1
plasters, pits for cells and gutters
2.2 Insulation, roofing, waterproofing Set 1
2.3 Anti-slip floor Set 1
2.4 Paint Set 1
2.5 Doors, glass surfaces Set 1
2.6 Air conditioning according to specification Set 1
Sanitary installation (water supply and
2.7 Set 1
wastewater disposal)
3 Exterior works
3.1 Earthworks, backfill, gravel, gravel track Set 1
Solid supports/ Support foundations for 63
3.2 Set 1
kV switchgear
3.3 Support foundations for 63 kV busbars Set 1
3.4 Transformer pit according to specification Set 1
3.5 Moving the transformer Set 1
3.6 Fencing, repair Set 1
3.7 Renovation of the substation gate Set 1
Realization of external cable gutters for LV
3.8 Set 1
cable
Excavation with laying of tubes/cable ducts
3.9 Set 1
for the transformer output MV cable
Wastewater treatment plant according to
4 Set 1
WHO recommendations
5 Substation water supply Set 1
Protective equipment (fire extinguishers,
6 Set 1
safety kit, etc.)
Generator room next to the MV cells
7 Set 1
building
Total civil engineering part
Paouignan Substation
I. ELECTRICAL PART
1 Studies Set 1
2 63 kV line arrival bay
228 mm² cable connections with all parts of this
2.1 Set 1
connection
63 kV tempered glass insulator string (3 phases) with
2.2 Set 2
all necessary equipment
2.3 Ground wire Set 1
2.4 Grounding of the ground wire U 1
2.5 Steel gantries and frames Set 1
Set of 3 63kV surge arresters, including support
2.6 Set 1
frame
2.7 All other necessary equipment and connections Set 1