Professional Documents
Culture Documents
R / N Project: Nissan Important Part Renault - CSR S 1 Doc Ref. No. / Ver.: 12345 / N
X98A Doc. Rev. Date: 10/14/2011
A B C OBD R 2
Doc. Origin Date: 11/22/2010
Supplier Name: ABC Industry Supplier Code: B023 E-mail: ebygum@abc-i.com
Supplier Plant: Barcelona Author: E Bygum Tel: +44 7895 156 456
Part Name: Fuel Filler Tube Remark
Part No. & Issue Level: 56789 AB000
Design Note No. / DEVO: T12345
Keep
Layout The neck of Confirm
space
(Low filler tube is heap of
for
angle 3 opening/ soaked if the The neck level Water gets splashed
opening into the fuel The weep mud from
closing water piles up is lower than
area) in cap tank when hole is weep hole
cap the liquid C
protector cap is enlarged. by
level
↓ opened. (φ4.5→φ12) corrosion
The neck of durability
filler tube is test
rusted
Mud
cover Confirm the
Material
A mud cover Change to level of corrode
(from
rubber
3 Protectio corrodes C powder by corrosion
n against and drops off coating durability
to steel)
mud test
splashed
by tires Splashed mud
to Confirm
is Direction of
Shape prevent Filler tube is soak the
heaped on Mud cover is mud cover is
(Wider clogging rusted by neck in
the mud open to the changed to
clearance 3 the weep cover direction of
filling cap C prevent heap
water by
from hole protector with corrosion
and clogged splashed mud of splashed
tube) water durability
the weep hole Copyright
mud (C) Renault/NISSAN
test
All Rights Reserved
ANPQP - DRBFM (Design Review Based on Failure Mode) WORKSHEET
R / N Project: Nissan Important Part Renault - CSR S 1 Doc Ref. No. / Ver.: 12345 / N
Mud X98A Doc. Rev. Date: 10/14/2011
cover A B C OBD R 2
Doc. Origin Date: 11/22/2010
Supplier Name: Protectio ABC Industry Supplier Code: B023 E-mail: ebygum@abc-i.com
n against
Supplier Plant: mud Barcelona Author: E Bygum Tel: +44 7895 156 456
Part Name: splashed Fuel Filler Tube Remark
by tires Splashed mud
Part No. & Issue Level: to 56789 AB000 Confirm
is Direction of
Design NoteShape
No. / DEVO: prevent heaped on Mud cover is
Filler tube is
T12345 mud cover is
soak the
(Wider clogging rusted by neck in
the mud open to the changed to
clearance 3 the weep cover direction of
filling cap C prevent heap
water by
from hole protector with corrosion
and clogged splashed mud of splashed
tube) water durability
the weep hole mud
test