Professional Documents
Culture Documents
V : B10 Application
APPLICATIONS
Gear set capacity
- Light oil, B10 heating oil/biofuel blend (as defined in DIN V51603-6) and (see pump capacity curves)
kerosene. Shaft rotation
- One or two-pipe system. and nozzle location
- System with in-line solenoid valve to assure cut-off function. (seen from shaft end)
A : clockwise rotation /
right hand nozzle.
PUMP OPERATING PRINCIPLE B : clockwise rotation /
left hand nozzle.
The gear set draws oil from the tank through the built-in filter and transfers it C : anti clockwise rotation
to the valve that regulates the oil pressure to the nozzle line. left hand nozzle.
D : anti clockwise rotation /
All oil which does not go through the nozzle line will be by-passed through right hand nozzle.
the valve back to the return line, in a two pipe installation or, if it is a one-pipe
installation, back to the suction port in the gear-set. In that case the by-pass K : Kerosene applications
plug must be removed from the return port and the return port sealed by steel
AE V 47 C K 1 3 xx 6 P
plug and washer.
Bleed : Pump series
Bleeding in two pipe operation is automatic. 1000 : standard
7000 : with side
In one pipe operation, during the starting period, air is purged through the pressure ports
nozzle line : the by-pass hole of the nozzle plug allows air to pass to the
2 : hub Ø 54 mm
nozzle line without opening of the regulator valve. 3 : hub Ø 32 mm
For the first start up, bleeding can be accelerated by loosening the plug in a Model number
pressure gauge port.
Note : Revision number
Owing to the presence of the nozzle by-pass hole, the pump has no cut-off Installation
function. Cut-off must be provided by an external solenoid valve (as mentioned P : by-pass plug installed in return port
for two-pipe operation.
in the paragraph APPLICATIONS). M : without by-pass plug, return plugged
for one-pipe operation.
Vacuum
gauge port
By-pass By-pass
plug plug
removed inserted
Return ONE PIPE TWO PIPE
plugged INSTALLATION INSTALLATION Return Inlet
SUNTEC INDUSTRIES FRANCE - 1, rue Lavoisier - CS 60 102 - F-21603 LONGVIC Cedex - Tel. 33 (0)3 80 70 60 70 - Fax 33 (0)3 80 70 61 11- www.suntec.fr
TECHNICAL DATA Pump capacity
Capacity (L/h)
General
Mounting Flange or hub according to EN 225
Connection threads Cylindrical according to ISO 228/1
Inlet and return G 1/4 (with facilities for conical sealing on revision 6 model)
Pressure (bars)
Viscosity = 5 cSt - Rated speed = 2850 rpm
1,8 cSt
PUMP DIMENSIONS Examples show "C" rotation and nozzle outlet.
Return and
Ø8
21 A 21 internal
Pressure
Ø10,5 74 by-pass plug adjustment
Ø54
15
A Nozzle
35 outlet Pressure port
G1/4
(only for
Pressure "7000" series)
13,5 13,5
A-A 13 Inlet and Return gauge port
7 with direct sealing
63 21 25 for revision 6
92 Ø8
(sealing with washers can also be used)
We reserve the right to change specifications without prior notice. AE - 11 - Ed 17 - Jan. 2019