231

Schedule E
Tender and Contract Documents

1. Tender Drawings &Test Certificates


Tenderers should submit with their offers the following drawings together with full
particulars and detailed descriptive and illustrated literature and detailed specification in
English Language relating to the following equipment. The acceptance of offer does not
mean that these drawings are approved and they should be resubmitted by the contractor
for approval.
No. Description of Drawings Tenderer’s Ref. No.
1. Drawings showing the proposed general layout
of the substation showing the arrangement of the
different items of equipment. Main dimensions
to be shown.
2. 400 KV ,132KV and 11KV switchgear room
layout in plan and sectional elevations showing
400 KV and 132 kv circuit breakers, earthing
switches, isolators C.T's ,V.T's with 400
KV,132KV sealing ends, ..etc. and any other
equipment with
dimensions
3. General arrangement of drawings of the
switchboard showing the main details of
construction of :
a) 400 KV switchboard
b) 132 KV switchboard
c) 33 KV switchboard for shunt reactor.
d) 11 KV switchboard
e) L.T. distribution board
4. Detailed drawings of 400 KV and 132 kv
isolators and V.T.s
5. General arrangement drawings of the remote
control and relay boards showing the main
dimensions of :
a) 400 KV control and relay board.
b) 132 KV control and relay board.
c) 11 KV control and relay board.
d) Transformer tap-change control desk.
e) 33 KV control and relay board for shunt reactor
f) Transformer tap change control panels.
g) Busbar zone protection panels.
h) Disturbance recorder.
6. Details of the circuit breakers:
a) 400 KV circuit breaker
b) 132 KV circuit breaker
c) 33 KV circuit breaker.
d) 11 KV circuit breaker.
232

Schedule E
Tender and Contract Drawings:
No. Description of Drawings Tenderer’s Ref. No.
7. General arrangement of transformers, with all devices
and valves tap-changer equipment, disconnecting
chambers, with sealing end cable boxes and associated
equipment, giving plan and side views with main
dimensions. Also details of marshalling kiosk with
mention of degree of protection to IEC 144.
8. General arrangement of SHUNT RACTOR, with all
devices and valves equipment, disconnecting
chambers, with sealing end cable boxes and
associated equipment, giving plan and side views
with main dimensions. Also details of marshalling
kiosk with mention of degree of protection to IEC144.
9. Details of central compressed air distribution system (if
applicable)
10. Earthing system layout and earth connections.
11. Details of sundry items and substation special equipment
and auxiliary equipment.
12. Schematic diagram of the substation equipment (single
line diagram)
13. General arrangement and locations of pressure switches
(see specifications)
14. Short circuit type test certificate for circuit breakers of
all voltage levels and for each rating together with type
test reports. Also comprehensive type test reports of all
400 KV, 132kv, 33 KV and 11KV switchgear.
15. Type test certificates for breaking and making charging
currents (capacitive and inductive) for 400 KV and 132
kv circuit breakers.
16. Type test certificates or test reports for short circuit
making capacity of earthing switches for all voltage
levels.
17. Short circuit type test certificates with detailed type test
report 33 KV circuit breaker controlling 45 MVAR
shunt reactors (test report to include switching of that
reactor).
18. Arrangement of H.V. testing of 400 KV and 132 KV
switchgear (A.C. and D.C.) for site tests. Also primary
current injections test arrangement.
19. Details of control and tripping battery supervision and
details of change over switch from trip to control battery
with associated monitoring and alarm relay.
20. Type and brief details of proposed busbars zone
protection scheme.
21. Interlocking scheme for all voltage levels.
22. Description and details of proposed transformers fire
fighting system.
23. General arrangement (with overall dimensions and
details of 400 KV S/G and surge diverters.
233

Schedule E
Tender and Contract Drawings

No. Description of Drawings Tenderer’s Ref. No.


24. General arrangement with overall dimensions of 400
KV surge arrestors, etc.
25. Sectional drawings (with dimensions and type of
each material used) for each type of power cables.
26. General arrangement of pressure tanks and pressure
gauges with earthing arrangement for oil filled cable
( if applicable).
27. General arrangement of SF6 gas monitoring system
for 400 KV and 132 kv Switchgear with indication
of alarm/trip/intertrip, lockout pressures and
equipment used.
28. Drawings and pamphlets/catalogues for A/C and
ventilation equipment.
29. Drawings and pamphlets/catalogues for electrical
installation works for substation building
30. General arrangement drawing of shunt reactors with
main dimensions and fittings.
31. General arrangement of SF6 gas pressure relief
devices location in each type of panel (400 KV and
132 kv ) with mention of operating pressure
32. Comprehensive type test reports of offered shunt
reactors.
33. Drawings, leaflets, or catalogues with working
showing the technical details and limit of supply for
the spares required in Schedule C of this tender.

Signature of Tenderer
234

Schedule E
Tender and contract Drawings
II) Contract drawings for approval:

The successful tenderer shall submit the following drawings in quintuplicate for approval as detailed in
the specification.

No. Description of Drawings


1. Drawings showing sectional details of individual equipment with two copies of descriptive
literature, catalogues, pamphlets,..etc. explaining the theory , design, functions operation,
installation, testing and maintenance of the spares and material used for construction.
2. General arrangement (layout) of the substation giving plans, sections and details with
dimensions. This arrangement to show all equipment as installed
3. General arrangement of 400 KV and 132 KV switchgear room with full details of all
equipment and dimensions
4. General arrangement of all switchgears and remote control and relay boards and their
supporting steel work with all fixation details and fully dimensioned
5. Outline and foundation plan for the transformers and marshalling kiosks, showing
radiator, piping, bushing, cables, boxes, disconnecting chambers, fire fighting water
piping/nozzles, ...etc.
6. Complete drawings, showing the power cable routes, control cable routes, trenches, ducts
and details of cable racks and trays in trenches and basement. Spot checks calculations to
prove protection against voltage induction in AC & DC auxiliary circuits during transient
fault conditions on power system.
7. Technical and descriptive literature for the various items of equipments including two
original copies of catalogues of each protective relay, auxiliary relays, contactors,...etc.
8. Schematic diagram of switchgear, control and relay boards, transformers and other
equipment showing the connections (details of protection scheme, metering, alarms,
voltage control,.,...etc.).
9. Details of cable Boxes:
a. For all types of switchgears.
b. Transformers, etc. with details of compound and oil.
10. Details of transformers disconnecting link chambers, oil piping valves with locks, oil and
winding temperature measurement, Buchholz and gas relays, ..etc.
11. Drawings showing the details of neutral earthing changeover switch cabinets and resistors.
12. Characteristics and magnetization curves of C.T.’s for differential protection as well as for
all other protective relays with check on suitability of burden and A.L.F. for each case.
13. Details of 400 KV and 132 kv current and voltage transformers (construction details,
electrical, technical data).
14. Drawings showing the earthing system and details of earthing electrodes and connection
together with detailed calculation for touch and step voltage and earthing mesh potential
based on design, fault level and site conditions.
235

Schedule E
Tender and Contract Drawings:
II - Contract drawings for approval

No. Description of Drawings


15. Drawings showing the details of all auxiliary and sundry equipment
16. Details of substation special equipment as specified.
17. Details and arrangement of pressure switches and associated protection scheme. Also
drawings and catalogues of all indicating meters (electrical, temperature, pressure, etc.)
18. All schematic and wiring drawings.
19. Transformers tap-change control scheme.
20. Site H.V. testing arrangement for 400 KV switchgear and 132 KV switchgear and
cables.
21. Details of battery chargers including voltage control and battery supervision schemes.
22. Details of remote supervisory and control requirement, together with telemetry
equipment and telemetry cabinets.
23. Details of busbar zone protection and calculations for stability and sensitivity and
proposal of settings. This applies to all protective relays other than the over current and
earth leakage relays.
24. Details of compressed air system (if applicable)
26. Details of straight through joint boxes specified and spare parts.
27. Method and details of power cables (400 KV 132KV , 33 KV 1/core cables)
28. Power cables layout for all voltage levels
29. Details of air-conditioning schemes, equipment, layout, etc.
30. Details of electrical installations, layout, equipment, etc.
31. Substation layout and arrangement of all equipment (indoor and outdoor) of all
equipment.
32. Full details with full calculations of civil works associated with the substation building
and external civil works and full details of all equipment associated with the building
(doors, windows, ..etc).
33. Any other drawing calculations, tests likely to need attention according to the
requirements of the specifications
34. For all electric circuitry, a step-by-step description of the sequence of operation with the
aid of a signal flow diagram giving the terminals where signal can be detected at various
stages starting from input and ending at the output terminals. Also a block diagram
splitting the whole circuit into logic and binary blocks must be offered for approval.
Trouble shooting tables for electronic transistorized relays has to be offered.

35. Details of transformer housing ventilators and noise reducers if applicable.


36. Details and characteristics of oil pressure tanks. Also details of pressure gauges and
surge voltage limiters (if applicable).
37. Details and arrangement of the firefighting equipment with detailed calculations on the
capacity of each system for the concerned case and precautions taken against corrosion
for water system in particular.
Signature of Tenderer
236

Schedule E
Tender & Contract Documents
III): Completion drawings:

1) Before erection, the contractor shall supply the following:

a) Four prints of all drawings and diagrams as finally approved.

b) Six complete sets of instruction manuals, in the English language, for the
switchgear, protection relays , shunt reactor , transformers, air-conditioning,
and all associated auxiliary and sundry equipment.

c) Power cable records ( 132 KV and 1000 V 1/c and 4/cores cable) showing the
exact cable layout to be submitted as (1) above.

2) Before handing over any section of works, two sets of marked-up drawings showing all
modifications that may have been carried out on site shall be handed over to Purchaser.

3) Within two months of handing over any section of the work, two further sets of all
drawings including schematic drawings and 10 sets of CD ROMS (in an approved PDF
Format Source File (original program) & AutoCAD) showing all equipment as finally
erected and wired on site, shall be submitted to the Purchaser. In addition one flash
memory and , three sets of standard 35 mm silver Halide microfilm as specified under
clause 1.15 shall be submitted within two months of handing over section of the works.
- Drawing paper should be at standard good quality and all drawing should be
submitted in CD softcopies in AutoCAD and pdf (Acrobat) format. (Source
Drawing).

a) Laptop with original AutoCAD (six sets)


b) Softcopies (on CD, six sets)
c) Hard copes (six sets)

NB: The successful tenderer shall collect from DEN Department of the Ministry of
Electricity & Water immediately after signing the contract five blank copies of the
tender specification who will fill identically to his offer and attach five complete sets of
all drawings, catalogues, documents, questionnaire, replies, interchanged
correspondence, etc. and this must be submitted not later than one month therefore as
per clause 1.15 page 18, Vol.I of the specification. In addition to that two sets of the
same should be submitted on computer 3.5 DS micro diskettes.

Signature of Tenderer
237

Schedule F
Special Erection Tools and Equipments

The Tenderer shall fill in the different tools and equipments which he proposes to use in carrying
out the contract works. This Schedule should include all testing equipment.

No. offered Details of Equipment Price (KD)

Signature of Tenderer
238

Schedule G
Substation Tools and Accessories

The tenderer shall give below an itemized list of the tools and accessories which be supplied with the
substation and as detailed in the details of equipment. The price of these accessories shall be included in
the contract price. Each item breakdown price must be submitted in separate sheet.
Item Description List No. /
No. Quantities

1) 400 KV Switchgear and other 400 KV Equipment

2) 132 KV Switchgear and other 132 KV Equipment

3) 33 KV Switchgear

4) 11 KV Switchgear

5) Battery and charger accessories (see clause 8.2.1, vol).

6) 300MVA, 30MVA and 250 KVA Transformers:

7) 250 & 45 MVAR Shunt Reactors


239

8) Substation sundry additional equipment: see clause 1.24 Vol. I


and Details of equipment.

9) Compressed Air System:

10) Firefighting Equipment

High Voltage discharge rod EST damped discharge and direct,


11) visible earthling MEGGER 20

According to latest update on product type

12) Detex Voltage Detectors and phase Tester Make MEGGER


20
According to latest update on product type

13) MEGGER 5k Insulation Resistance Tester UK Plug 2

According to latest update on product type

Avo meter
14) AC:0 0-500 v, 0.01mA – 10 A, 0.01 Hz–100KHz 20
DC: -300V + 300V , 0.01mA– 10A
Resistance: 0.1Ω – 50MΩ
According to latest update on product type
240

15) Clamp meter: 20


AC current: 10mA–10 A
Frequency: 40 Hz – 1 kHz
According to latest update on product type

16) 1191 VSRK


Hammer Drill 1
According to latest update on product type

17)
1671B36V 6-1/2 in. 1
Circular Saw ( Bare Tools )
According to latest update on product type

18) 1994-6D 9 in.


15 A High performance large Angle grinder with no lock on 1
switch
According to latest update on product type

19) 11335K Jack breaker Hammer


According to latest update on product type 1

20) GBL18V-7 in. 18 Blower ( Bare Tool )


According to latest update on product type 1

21) Welded water pipe welding machine


According to latest update on product type 1
241

22) Padlocks make ASSA ABLOY approved for MEW


According to the specifications mentioned in contract number:
59514-15F
Locks must be with individual keys, 2Nos.
Offer should contain Manufacturers Pamphlets.
Delivery should include Manufacturers Certificate.

General Master Key-GT (KS102B-Key SENTRY level 11)


Padlocks pl340, Engraving Area T4 (PL340B_12B00131)
Padlocks pl340, Engraving Area T5 (PL340B_12B00131)
Padlocks pl340, Engraving Area T6 (PL340B_12B00131)
23) Transformer oil as per specifications in schedule “D” with 450,000/000L
inspection and delivery according to PSMD approval.

- Tools and accessories that will be delivered shall be in compliance with MEW specification and
in accordance with make/type finally installed in site and the price of the same are to be actual
for future reference in case of order during the contract running period until the end of contract
guarantee period.
- All tools and accessories should not be handed over unless you get written request and approval
from MEW in this regard for each item to be on separate sheet to be given.
- The contractor shall provide the latest edition of the above mentioned tools.

Signature Tenderer:

Name:

Address:
240

Schedule ' H'


Details of Erection Personnel

1) Details of Erection Personnel and Costs:

Rate per month including


No. Description Accommodation, messing,
Local transport,…etc.
KD (each)

Foreign:
Supervising Engineer
Protection Engineer
Skilled Erectors
Testing & Commissioning Engineer
Maintenance Engineer
Cable Engineer
Cable Jointer
Civil Engineer

Local:
Erectors
Cable Jointer’s mates

NB: The above rates shall be for normal working hours and normal working days of the
Ministry of Electricity & Water.

2) Travelling Expenses to and from Kuwait:

No. Description Total Cost in KD (each)


Foreign:
Supervising Engineer
Protection Engineer
Skilled Erectors
Testing & Commissioning Engineer
Maintenance Engineer
Cable Engineer
Cable Jointer
Civil Engineer

Signature of Tenderer
241

Schedule I
Period of Delivery and Completion

The tenderer shall give below his best periods for F.O.B. delivery, commencement and completion
of erection, testing and commissioning. The periods to be in calendar months from the date of
signing the contract in Kuwait. The testing and commissioning period shall be in accordance with
the specified periods in Schedule “M”

FOB
NO. DESCRIPTION OF WORK DELIVERY ERECTION
MONTHS COMMENCEMENT COMPLETION
1. Substation Building:
a) Building basement N.A.
b) Ground floor N.A.
c) Electrical Installation works
d) Air conditioning works
2. External civil works associated
with the substation
3. 400 KV switchgear room
travelling crane.
4. 132 KV switchgear room
travelling crane.
5. 400 KV switchgear with SF6
tube and outdoor bushing.
6. 132 KV switchgear
7. 400 KV Circuit breaker.
8. 132 KV Circuit breaker.
9. 300 MVA transformers.
10. 30 MVA transformers.
11. 400 KV control and relay panels
and tap change control desk.
12. 132 KV control and relay panels
and tap change control desk.
13. 11 KV control and relay panels
and tap change control desk.
14. Telemetry transfer cabinet.
15. Control and power service
cables and trays and connectors.
16. 33 KV Switchgears
17. 11 KV Switchgears
18. Transformers: 1000 KVA
19. Shunt Reactors (45 MVAR)
20. Shunt Reactors (250 MVAR)
21. 33 KV remote control and relay
panel
22. 11 KV remote control and relay
panel
242

Schedule I
Period of Delivery and Completion

The tenderer shall give below his best periods for F.O.B. delivery, commencement and completion
of erection, testing and commissioning. The periods to be in calendar months from the date of
signing the contract in Kuwait. The testing and commissioning period shall be in accordance with
the specified periods in Schedule “M”

FOB
NO. DESCRIPTION OF WORK DELIVERY ERECTION
MONTHS COMMENCEMENT COMPLETION
23. Power cables.
a. 132KV XLPE cables
b. 33 KV single XLPE
cables.
24. Firefighting equipment for
transformers and shunt reactors.
25. Firefighting equipment for
substation.
26. Substation special equipments

27. Auxiliary & Sundry equipment

28. Testing & Commissioning

Signature of Tenderer