Schedule E
Tender and Contract Documents
Schedule E
Tender and Contract Drawings:
No. Description of Drawings Tenderer’s Ref. No.
7. General arrangement of transformers, with all devices
and valves tap-changer equipment, disconnecting
chambers, with sealing end cable boxes and associated
equipment, giving plan and side views with main
dimensions. Also details of marshalling kiosk with
mention of degree of protection to IEC 144.
8. General arrangement of SHUNT RACTOR, with all
devices and valves equipment, disconnecting
chambers, with sealing end cable boxes and
associated equipment, giving plan and side views
with main dimensions. Also details of marshalling
kiosk with mention of degree of protection to IEC144.
9. Details of central compressed air distribution system (if
applicable)
10. Earthing system layout and earth connections.
11. Details of sundry items and substation special equipment
and auxiliary equipment.
12. Schematic diagram of the substation equipment (single
line diagram)
13. General arrangement and locations of pressure switches
(see specifications)
14. Short circuit type test certificate for circuit breakers of
all voltage levels and for each rating together with type
test reports. Also comprehensive type test reports of all
400 KV, 132kv, 33 KV and 11KV switchgear.
15. Type test certificates for breaking and making charging
currents (capacitive and inductive) for 400 KV and 132
kv circuit breakers.
16. Type test certificates or test reports for short circuit
making capacity of earthing switches for all voltage
levels.
17. Short circuit type test certificates with detailed type test
report 33 KV circuit breaker controlling 45 MVAR
shunt reactors (test report to include switching of that
reactor).
18. Arrangement of H.V. testing of 400 KV and 132 KV
switchgear (A.C. and D.C.) for site tests. Also primary
current injections test arrangement.
19. Details of control and tripping battery supervision and
details of change over switch from trip to control battery
with associated monitoring and alarm relay.
20. Type and brief details of proposed busbars zone
protection scheme.
21. Interlocking scheme for all voltage levels.
22. Description and details of proposed transformers fire
fighting system.
23. General arrangement (with overall dimensions and
details of 400 KV S/G and surge diverters.
233
Schedule E
Tender and Contract Drawings
Signature of Tenderer
234
Schedule E
Tender and contract Drawings
II) Contract drawings for approval:
The successful tenderer shall submit the following drawings in quintuplicate for approval as detailed in
the specification.
Schedule E
Tender and Contract Drawings:
II - Contract drawings for approval
Schedule E
Tender & Contract Documents
III): Completion drawings:
b) Six complete sets of instruction manuals, in the English language, for the
switchgear, protection relays , shunt reactor , transformers, air-conditioning,
and all associated auxiliary and sundry equipment.
c) Power cable records ( 132 KV and 1000 V 1/c and 4/cores cable) showing the
exact cable layout to be submitted as (1) above.
2) Before handing over any section of works, two sets of marked-up drawings showing all
modifications that may have been carried out on site shall be handed over to Purchaser.
3) Within two months of handing over any section of the work, two further sets of all
drawings including schematic drawings and 10 sets of CD ROMS (in an approved PDF
Format Source File (original program) & AutoCAD) showing all equipment as finally
erected and wired on site, shall be submitted to the Purchaser. In addition one flash
memory and , three sets of standard 35 mm silver Halide microfilm as specified under
clause 1.15 shall be submitted within two months of handing over section of the works.
- Drawing paper should be at standard good quality and all drawing should be
submitted in CD softcopies in AutoCAD and pdf (Acrobat) format. (Source
Drawing).
NB: The successful tenderer shall collect from DEN Department of the Ministry of
Electricity & Water immediately after signing the contract five blank copies of the
tender specification who will fill identically to his offer and attach five complete sets of
all drawings, catalogues, documents, questionnaire, replies, interchanged
correspondence, etc. and this must be submitted not later than one month therefore as
per clause 1.15 page 18, Vol.I of the specification. In addition to that two sets of the
same should be submitted on computer 3.5 DS micro diskettes.
Signature of Tenderer
237
Schedule F
Special Erection Tools and Equipments
The Tenderer shall fill in the different tools and equipments which he proposes to use in carrying
out the contract works. This Schedule should include all testing equipment.
Signature of Tenderer
238
Schedule G
Substation Tools and Accessories
The tenderer shall give below an itemized list of the tools and accessories which be supplied with the
substation and as detailed in the details of equipment. The price of these accessories shall be included in
the contract price. Each item breakdown price must be submitted in separate sheet.
Item Description List No. /
No. Quantities
3) 33 KV Switchgear
4) 11 KV Switchgear
Avo meter
14) AC:0 0-500 v, 0.01mA – 10 A, 0.01 Hz–100KHz 20
DC: -300V + 300V , 0.01mA– 10A
Resistance: 0.1Ω – 50MΩ
According to latest update on product type
240
17)
1671B36V 6-1/2 in. 1
Circular Saw ( Bare Tools )
According to latest update on product type
- Tools and accessories that will be delivered shall be in compliance with MEW specification and
in accordance with make/type finally installed in site and the price of the same are to be actual
for future reference in case of order during the contract running period until the end of contract
guarantee period.
- All tools and accessories should not be handed over unless you get written request and approval
from MEW in this regard for each item to be on separate sheet to be given.
- The contractor shall provide the latest edition of the above mentioned tools.
Signature Tenderer:
Name:
Address:
240
Foreign:
Supervising Engineer
Protection Engineer
Skilled Erectors
Testing & Commissioning Engineer
Maintenance Engineer
Cable Engineer
Cable Jointer
Civil Engineer
Local:
Erectors
Cable Jointer’s mates
NB: The above rates shall be for normal working hours and normal working days of the
Ministry of Electricity & Water.
Signature of Tenderer
241
Schedule I
Period of Delivery and Completion
The tenderer shall give below his best periods for F.O.B. delivery, commencement and completion
of erection, testing and commissioning. The periods to be in calendar months from the date of
signing the contract in Kuwait. The testing and commissioning period shall be in accordance with
the specified periods in Schedule “M”
FOB
NO. DESCRIPTION OF WORK DELIVERY ERECTION
MONTHS COMMENCEMENT COMPLETION
1. Substation Building:
a) Building basement N.A.
b) Ground floor N.A.
c) Electrical Installation works
d) Air conditioning works
2. External civil works associated
with the substation
3. 400 KV switchgear room
travelling crane.
4. 132 KV switchgear room
travelling crane.
5. 400 KV switchgear with SF6
tube and outdoor bushing.
6. 132 KV switchgear
7. 400 KV Circuit breaker.
8. 132 KV Circuit breaker.
9. 300 MVA transformers.
10. 30 MVA transformers.
11. 400 KV control and relay panels
and tap change control desk.
12. 132 KV control and relay panels
and tap change control desk.
13. 11 KV control and relay panels
and tap change control desk.
14. Telemetry transfer cabinet.
15. Control and power service
cables and trays and connectors.
16. 33 KV Switchgears
17. 11 KV Switchgears
18. Transformers: 1000 KVA
19. Shunt Reactors (45 MVAR)
20. Shunt Reactors (250 MVAR)
21. 33 KV remote control and relay
panel
22. 11 KV remote control and relay
panel
242
Schedule I
Period of Delivery and Completion
The tenderer shall give below his best periods for F.O.B. delivery, commencement and completion
of erection, testing and commissioning. The periods to be in calendar months from the date of
signing the contract in Kuwait. The testing and commissioning period shall be in accordance with
the specified periods in Schedule “M”
FOB
NO. DESCRIPTION OF WORK DELIVERY ERECTION
MONTHS COMMENCEMENT COMPLETION
23. Power cables.
a. 132KV XLPE cables
b. 33 KV single XLPE
cables.
24. Firefighting equipment for
transformers and shunt reactors.
25. Firefighting equipment for
substation.
26. Substation special equipments
Signature of Tenderer