Professional Documents
Culture Documents
Scope of Assessment
This summary has been prepared by Exova Warringtonfire and is a summary of the assessment report referenced
below. Full details of the construction, justification for the conclusions given, along with validity statements are given
in that report.
The lift landing doorsets have been appraised for 120 minutes integrity and insulation performance (EI120) with
respect to EN 81-58: 2003.
Appraised Scope
This Assessment Summary is based upon a report prepared by Exova Warringtonfire. Full details of the constructions and justification for any opinions
given, along with validity statements, are given in the referenced assessment report. The assessment report does not provide an endorsement by Exova
Warringtonfire of the performance of the actual products supplied.
This Assessment Summary has been compiled between Exova Warringtonfire and Tecnolama SA. It is intended to provide a brief outline of the above
referenced assessment report and does not replace it.
Page 1 of 2
Authorised Ningbo Arttec Co. Ltd., Ningbo European Ind. Park, First seashore road Hangzhou Bay
Manufacturers New Zone, P.C 315336 Cixi City Zhejiang (China)
Tecno Doors Pvt. Ltd., Plot No. L-1, SIPCOT Ind. Park Sriperumbudur, Mambakkam &
Pondur "A" Village, Sriperumbudur Taluk, Kancheepuram Dist (Tamil Nadu) 602106 India
Ets. Henri Peignen S.A., 269 Rue du Maréchal Juin. B.P. 504, Z. I. de Vaux le Pénil, F.
77015 Melun Cedex, (France)
Doors Movement Technology S.L., Pol. Ind. Sort dels Capellans, parcel.la 19, 43730, Falset
(Spain)
Tecnoamerica Ind. e Comércio Ltda., Av. João Oswaldo Cardoso 1200, CEP: 12042-050
Taubaté. São Paolo (Brasil)
Page 2 of 2