You are on page 1of 1

MH10

1. THIS DRAWING PLOTTED BASED ON GENERAL ARRANGEMENT DRAWING WITH DWG. NO. 188963-4UXB-G1001
MH09 MH08 MH07 0.20%
0.20% L=28.51M
L=17.70M 0.20%
L=88.27M W=0.80M W = 0.8M 5700
W=0.80M

0.20% W=0.60M
L=97.57M

L=48.72M
0.20%
TIE DOWN LOCATION TIE DOWN LOCATION
( X = 5168.400 Y = 2631.900 ) ( X = 5192.400 Y = 2631.900 )
SEE DWG G2301 SEE DWG G2301

L=52.14M
0.20%

L=57.59M
W=0.40M

W=0.40M

0.20%
W=0.80M
(109) FUEL OIL STORAGE AREA _R1 Info

MH14

W=0.60M
0.20%
L=31.65M W=0.60M W=0.60M

0.20% L=15.48M 0.20% 5700


MH13
L=15.06M 0.20%

0.2%
W=0.80M L=16.87M
MH06
W=0.60M 0.10% W=0.80M 0.20% W=0.60M
L=48.93M MH11 L=12.94M
W=0.40M

L=14.53M
MH21 MH12

W=0.80M
0.20%

W=0.60M
W=0.40M
PONDASI PIPE SUPPORT
PS-43 TIDAK PAS DENGAN GAMBAR VENDOR

WWTP Chem Storage Shelter _R1

L=35.09M
0.20%

L=38.59M
MH05

0.20%
0.47% W=0.40M

W=0.40M

W=0.40M
W=
L=27.98M W=0.60M

0
.80
L=
0.2 .95
15

M
0% M
W=0.80M
W=0.40M
W=0.40M

MH04
High R.S.C Clarifier _R1

L=37.97M
0.20%
W=0.40M
MH20

L=59.45M W=0.60M
W=0.40M
L=18.18M

W=0.60M

W=0.40M
0.20%

W=0.80M

0.20%
W=0.40M

W=0.40M
MH03 MH17
FOR TIE DOWN
SEE DWG G2104
( N = 2540.550 E = 5024.550 )

0.20% REGULAR & IRREGULAR


W=0.40M L=59.00M W=0.60M W=0.60M
ESP & Fly Ash E-C Building _R0

0.2%
0.2%
0% M
0.2 9.99 0.20%
2 MH02
L= 0.10% W=0.80M MH18 L=23.05M
L=58.94M W=0.60M

.80M
MH29 MH28
(253) Thermal Desalination Plant _R1

W=0
MH49 0.20% TIE DOWN LOCATION

L=15.50M SEE DWG G25302 ( X = 5169.915 Y = 2520.910 )

W=0.40M

W=0.60M
W=0.80M ESP INLET DUCT SUPPORT _R1

L=44.50M
0.20%

L=56.68M
0.2%
MH30

L=45.21M
P : POINT NUMBER

0.20%
BOD : BOTTOM OF DITCH (IN MSL)

W=0.80M
W=0.40M
L=23.83M
W=0.60M
0.20%
0.07% % : LONGITUDINAL SLOPE OF DITCH
L=92.61M L : LENGTH OF DITCH

W=0.40M
W=0.80M
W : SECTIONAL WIDTH OF DITCH

W=0.40M
W=0.80M
W=0.40M MH27

W=0.40M
MH48

MH01

L=19.96M
DIMENSI SIRKEY ?

W=0.80M
0.2%

0.20%
W=0.80M
L=72.45M W=0.80M

0.2%
0.20%
W=0.60M L=72.55M

L=30.00M
MH26 0.20% W=0.60M

W=0.40M

W=0.40M
0.20%
L=9.2M
Bottom Ash Silos _R0
MH19

W=0.40M

W=0.40M
L=23.76M

W=0.80M

W=0.40M
0.20%
MH47 ST9c ST9a ST9 ST8 ST7k ST7h ST7g ST7e ST7c ST7 ST6 ST5a ST5 ST4a ST4 ST3 ST2a ST2 ST1a ST1 W=0.40M

W=0.60M
W=0.40M W=0.40M W=0.40M

L=45.25M
W=0.40M

0.20%
2500

L=7.4M
0.20%

W=0.80M
8634
W=0.40M
STG

W=0.40M W=0.40M MH46


W=0.40M

W=0.40M
TIE DOWN LOCATION

MH25
( X = 5189.900 Y = 2449.750 )
SEE DWG G2630

W=0.80M

W=0.60M
W=0.40M

W=0.40M
L=22.17M
0.20%
PIPE RACK PR-02 _R1 X = 5022.600
Y = 2444.170

W=0.40M W=0.40M STF

STE8

TOC. EL +0.100 TOC. EL +0.100

W=0.40M

W=0.40M
L=27.96M
STE5
0.20%

W=0.80M
STE2
MH31

TOC. EL +0.100
STE
MH34
STD1

0.20% W=0.40M

W=0.80M
L=9.72M
L=7.80M

0.20%
W=0.80M

W=0.40M
MH24 STD

MH45
STC1 TIE DOWN LOCATION
( X = 5189.900 Y = 2423.600 )
MH32
SEE DWG G2630

L=22.43M
0.20%
STC

STB3

W=0.80M
STB1

MH33 W=0.40M
L=46.26M

STB
0.20% 0.20%
0.20%

L=55.03M W=0.60M W=0.60M L=74.82M W=0.60M


STA5

W=0.8
0.2%
STA1
STA

TIE DOWN LOCATION


MH23 L= 0.2
18 0%
( X = 5025.000 Y = 2403.218 )
SEE DWG G2001

0.20% W=0.60M .4

M
18 %
W=0.60M 9M W=0.60M

L= 0.20
L=31.72M 0.20%

.38
L=46.25M
MH37
W=0.60M

W=0.80

L=42.26M
0.20%
MH35 MH36
0.20% 0.20% MH39
L=4.80M L=4.80M
MH38

L=54.57M
W=0.80M

0.20%

W=0.60M
L=31.94M

W=0.40M
0.20%
L=31.29M

W=0.80M
0.20%

MH16

W=0.40M
W=0.60M

MH44

L=20.76M
W=0.80M

W=0.40M
L=8.66M

W=0.60M

L=83.10M
0.20%
0.20%

0.20%
W=0.80M
MH42
MH43
W=0.40M
0.20%
L=7.55M
W=0.80M
N = 2358.020
L=50.63M

E = 5055.205
0.20%

W=0.60M
CL TRENCH
N = 2358.020

MH22 MH15
E = 5084.830

W=0.60M 0.20%

0.20% W=0.60M
Conden Polishing & Chem Storage Shed ( 256 )

L=46.14M W=0.80M
TIE DOWN LOCATION
SEE DWG G2401
( X = 5043000 Y = 2354000 )

TIE DOWN LOCATION


W=0.80M

SEE DWG G2656


N = 2349.950
( N = 2347.400 E = 5199.000 )
L=7.5M

E = 5128.200
PIPE RACK PR-08 _R1 2.
0.20%

N = 2347.681
E = 5137.734

L=49.26M
3.
N = 2346.122 ( 252 ) Hydrogen Generation Plan _R1
E = 5138.634
1.
N = 2346.122
E = 5136.834
( 402 ) Workshop & Warehouse_R5

CL TRENCH N = 2339.050
E = 4908184 E = 5041.011

CL TRENCH
N = 2339.050
E = 4977.900

SLOPE 0.1%
MH41
CL TRENCH W=0.40M PIPE RACK PR-01 _R1 N = 2334.580
E = 5022.600
W=0.60M
SLOPE 0.23%

W=0.60M
L=20.00M
TO 150KV CONTROL BLD
W=0.38M
N = 2332.685

SLOPE 0.3% SLOPE 0.1% SLOPE 0.1%

0.20%
KP KP
E = 4936.942

N = 2331.045
K1/P2 K2/P2

SLOPE 0.1%

CL TRENCH
KP KP
0.20% W=0.60M MH40
N = 2327.895

L=52.15M
KP KP

K1/P1 K1/P1
SLOPE 0.1%
W=0.40M
SLOPE 0.1%

CL TRENCH
N = 2323.500
KP

0.20% W=0.60M 0.20% W=0.60M


L=33.71M L=33.71M
E = 4804.203

KP KP

K1/P2 K2/P2

W=0.38M SLOPE 0.1% SLOPE 0.1%


FROM 150KV CONTROL BLD W=0.40M
TG5 TG4 TG3 TG2 TG1 TG1-A SLOPE 0.1%

TIE DOWN LOCATION


SEE DWG G2701A
(N = 2308.800 E = 4885.580)

CL TRENCH
N = 2304.958
SLOPE 0.1%

W=0.40M

(151 ) 150 KV Substation Control Building _R2


W=0.40M

CL TRENCH
N = 2296.300
FOR TIE DOWN LOCATION
( X = 4961660 Y = 2296810 )
CL TRENCH
E = 4959.320
SEE DWG G2701A
SLOPE 0.1%

0 20 40 C:\Users\nugrohoadam\Pictures\logo.JPG
1:650
W=0.40M SCALE IN METERS