You are on page 1of 3

CONSTRUCTION DRAWING

WP01A/B
TK01

3
-
1 1
- -

6.000
8.115

29,900
17.000

SLOPE

TK13
TK11

TK12
TK10A

TK10C
TK10B

SLOPE
TK09

TK08
TK06B
TK05B

TK07
TK04

TK06A
TK05A

TK03B

TK01
OPENING
OPENING

500x500
500x500

TK03A
TK01

101,750
101,600

SLOPE 2%

SLOPE

SLOPE 2%

SLOPE 2%

SLOPE

86,400
SLOPE 2%

Open Gutter
W=300(inside)

Set Back Line


2 2
- -
5000

HEADTER TANK 700LIT x2


SLOPE

SLOPE
SLOPE

Setback Line HATCH (REMOVABLE PANEL) WITH KEY


EXHAUST DUCT 300CMH
STEEL STAIR
9 PRE WASTE CHILLED RM

43 PROCESSING RM 2 CH=3500
MACHINE HATCH MACHINE HATCH
W 0.8xH2.2 CH=3500
W 0.8xH2.2 NEED DRAIN PIT INSIDE
WASTE CHILLED RM

10 WASTE CHILLED RM
18 SUB MATERIAL RM2 FL-900 (GL+300)
10 ton CH=4400
ICE MACHINE 2

27 TEMPORARY
5 ton ABOVE CEILING CH=3500
7500

STORAGE 2

CH=3500 11 PRE WASTE RM


SLOPE
22 WASHING RM 2-1 CH=3500

4 ton CH=3500
Above
1000kg
Ceiling
12 WASTE STORAGE RM
30 PREPROCESSING RM 2 ( 50 PERSONS)
FL-900 (GL+300)
CH=4400
CH=3500

4 ton
23 WASHING RM 2-2

SLOPE
7000

Opening

NEED DRAIN PIT INSIDE


WASTE STORAGE RM
CH=3500

4 ton 16 DEFROSTING RM 2
Air curtain

Air curtain

CH=3500
NEED DRAIN PIT INSIDE
WASHING POOL W1.2 x 3.6m
FL-200 DEFROSTING RM 2
20 ton (W=2.5mx D=3m)
46 PACKAGE 35 DISINFECTING RM 2-2 40 SCALE RM 2 34 DISINFECTING RM 2-1
MATERIAL RM2
UP UP
CH=3500 CH=3500
CH=3500 37 CHEMICAL RM 2 1,700

Shallow (H20)
WASHING POOL W1.2 x 3.6m
FL-200
Set Back Line
10800

WASHING POOL W1.2 m i=2%


FL-200 slope SLOPE
107 MACHINE RM
FL-900 (GL+300) 3 ton

44 FUTURE PROCESSING RM 31 FUTURE PREPROCESSING RM

CH=3500 CH=3500

Open Gutter 4 ton


48 CARTONING RM
MACHINE HATCH
W 2.5xH2.5
MACHINE HATCH
MACHINE HATCH
W 2.5xH2.5

W=400(inside) CH=3500
DOOR OPENING FULL TIME W 2.5xH2.5
8800

4 ton
FLATE AREA
26 TEMPORARY 28 ROAST RM 17 CHILLED
45 PACKAGE
STORAGE 1 STORAGE
MATERIAL RM 1 CH=3500
4 ton i=2%
ICE MACHINE 1

MACHINE HATCH CH=3500 CH=3500 slope 1.700 CONCRETE SLOPE


OPEN DRAIN CH=3500
W 2.5xH2.5
Air curtain
Air curtain

7.5 ton
70400

20 WASHING RM 1-1
Opening

CH=3500
1000kg
ABOVE CEILING
9000

108 CONTROL RM
FL-900 (GL+300)
97,380

97,600

POC PANEL
4000x1200x2200
DOOR WITH VINYL CURTAI,FL+700

8 UNPACKING RM

Set Back Line 00 10 JULY 2019 FOR APPROVE


21 WASHING RM 1-2

42 PREPROCESSING RM 2 ( 170 PERSONS) CH=3500


SLOPE
CH=3500
15 DEFROSTING RM 1
CH=3500

CH=3500

MACHINE HATCH NEED DRAIN PIT INSIDE


Air curtain
Air curtain

300kg
7700

W 0.8xH2.2 300kg 300kg DEFROSTING RM 1

2-2 SORTING RM 2 6 SUB MATERIAL STORAGE i=2%


33 DISINFECTING RM 1-2 39 SCALE RM 1 32 DISINFECTING RM 1-1 slope
CH=3500 300kg CH=3500

Rev DATE DESCRIPTION


3,914

50 PACKAGE STORAGE CH=3500 CH=3500


36 CHEMICAL RM 1
UP UP WASHING POOL W1.2 m
CH=6000 FL-200

WASHING POOL W1.2 x 3.6m Line 3-1 PRECOOLING RM 1


Air curtain FL-200 2-1 SORTING RM 1
CH=6000
300kg 300kg
CH=6000 SLOPE
7800

7-1 MATERIAL COLD STORAGE


7-2 PRODUCT COLD STORAGE

300kg 300kg
1-1 RECIEVING RM

3
CLIENT NAME:
CH=6000

-
4 COLD
CH=11500

CH=11500

STORAGE OFFICE
5900

CH=2700
3,200 1,080
1.080

SLOPE
500kg

Air curtain
5900

300kg
SLOPE 3-2 PRECOOLING RM 2

CH=6000 500kg 500kg 500kg 500kg 500kg

300kg
9000

2,910
2,460

SL
20005

1-2 SHIPPING RM
5 ANTIROOM OP
CH=6000
CH=6000 E
1,700
SLOPE

PROJECT NAME:
SLOPE

CONTROL POINT
Setback Line
5000

8-c

Set Back Line


ELEC. STATION (EXISTING)
Setback Line

Setback Line

OUT
FENCE EXISTING MAIN ROAD

8.000 9.000 7.000 7.000 ELEC. POLE7.000


7.000 (EXISTING) 7.000 7.000 7.000 6.000
Lot 16A8-1 & 16A14c, TRA NOC 1 INDUSTRIAL ZONE,
87,000 OUT BINH THUY DIST, CAN THO CITY

1 2 3 4 5 6 7 8 9 10 11 GL+1100 GL+1100

MAIN-CONTRACTOR:
NOTE:
2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN
TEL: +81-338177182 FAX: +81-338177642
- ELEVATION OF SEWAGE PIPE WILL BE BASED ON
THE ACTUALLY CONDITION AT SITE CONTRACTOR:

- WALL'S DEPTH IS JUST FOR REFERENCE, PLEASE OFFICE: 17 BUI VAN BA ST., TAN THUAN DONG WARD, DIST.7, HCMC, VIET NAM
REP. OFFICE: 6TH FLOOR, MELODY TOWER, 422-424 UNG VAN KHIEM ST.,
WARD 25, BINH THANH DIST, HCMC, VIET NAM

REFER TO STRUCTURAL DRAWING FOR DETAIL


PREPARED CHECKED APPROVED

DRAWING TITLE:
See CT5

DWG No:

A3 SCALE: 1/50 Rev: 00


CONSTRUCTION DRAWING

WP01A/B
TK01

3
-
6.000
8.115

29,900
17.000

SLOPE

TK13

1 1
TK11

TK12
TK10C
TK10A

TK10B

- -
SLOPE
TK09

TK08
TK06B
TK05B

TK07
TK04

TK06A
TK05A

TK03B

TK01
OPENING
OPENING

500x500
TK03A
500x500
TK01

101,750
101,600

SLOPE 2%

SLOPE

SLOPE 2%

SLOPE 2%

SLOPE

86,400
SLOPE 2%

Open Gutter
W=300(inside)

Set Back Line


5000

HEADTER TANK 700LIT x2


SLOPE

SLOPE
SLOPE

Setback Line HATCH (REMOVABLE PANEL) WITH KEY


EXHAUST DUCT 300CMH
STEEL STAIR
9 PRE WASTE CHILLED RM
CH=3500
43 PROCESSING RM 2

2 2
MACHINE HATCH MACHINE HATCH
CH=3500 NEED DRAIN PIT INSIDE
W 0.8xH2.2 W 0.8xH2.2
WASTE CHILLED RM

10 WASTE CHILLED RM
18 SUB MATERIAL RM2 FL-900 (GL+300)
10 ton CH=4400
ICE MACHINE 2

27 TEMPORARY
5 ton ABOVE CEILING CH=3500
7500

STORAGE 2

SLOPE
- -
CH=3500 11 PRE WASTE RM

22 WASHING RM 2-1 CH=3500

4 ton CH=3500
Above
1000kg
Ceiling
12 WASTE STORAGE RM
30 PREPROCESSING RM 2 ( 50 PERSONS)
FL-900 (GL+300)
CH=4400
CH=3500
4 ton
23 WASHING RM 2-2

SLOPE
7000

Opening

NEED DRAIN PIT INSIDE


WASTE STORAGE RM
CH=3500

4 ton 16 DEFROSTING RM 2
Air curtain

Air curtain

CH=3500
NEED DRAIN PIT INSIDE
WASHING POOL W1.2 x 3.6m
FL-200 DEFROSTING RM 2
20 ton (W=2.5mx D=3m)
46 PACKAGE 35 DISINFECTING RM 2-2 40 SCALE RM 2 34 DISINFECTING RM 2-1
MATERIAL RM2 UP UP
CH=3500 CH=3500
CH=3500 37 CHEMICAL RM 2 1,700

Shallow (H20)
WASHING POOL W1.2 x 3.6m
FL-200
Set Back Line
10800

WASHING POOL W1.2 m i=2%


FL-200 slope SLOPE
107 MACHINE RM
FL-900 (GL+300) 3 ton

44 FUTURE PROCESSING RM 31 FUTURE PREPROCESSING RM

CH=3500 CH=3500
MACHINE HATCH
Open Gutter 4 ton
48 CARTONING RM
W 2.5xH2.5
MACHINE HATCH
MACHINE HATCH
W 2.5xH2.5

W=400(inside) CH=3500 DOOR OPENING FULL TIME W 2.5xH2.5


8800

4 ton

28 ROAST RM
FLATE AREA
26 TEMPORARY 17 CHILLED
45 PACKAGE
STORAGE 1 STORAGE
MATERIAL RM 1 CH=3500 i=2%
4 ton
ICE MACHINE 1

MACHINE HATCH CH=3500 CH=3500 slope 1.700 CONCRETE SLOPE


OPEN DRAIN CH=3500
W 2.5xH2.5
Air curtain
Air curtain

7.5 ton
70400

20 WASHING RM 1-1
Opening

CH=3500
1000kg
ABOVE CEILING
9000

108 CONTROL RM
FL-900 (GL+300)
97,380

97,600

POC PANEL
4000x1200x2200
DOOR WITH VINYL CURTAI,FL+700

8 UNPACKING RM

Set Back Line


21 WASHING RM 1-2

42 PREPROCESSING RM 2 ( 170 PERSONS) CH=3500


SLOPE
CH=3500
15 DEFROSTING RM 1
CH=3500

CH=3500

MACHINE HATCH NEED DRAIN PIT INSIDE


Air curtain
Air curtain

300kg
7700

W 0.8xH2.2 300kg 300kg DEFROSTING RM 1

2-2 SORTING RM 2 6 SUB MATERIAL STORAGE i=2%


33 DISINFECTING RM 1-2 39 SCALE RM 1 32 DISINFECTING RM 1-1 slope
CH=3500 300kg CH=3500
3,914

50 PACKAGE STORAGE CH=3500 CH=3500


36 CHEMICAL RM 1
UP UP WASHING POOL W1.2 m
CH=6000 FL-200

WASHING POOL W1.2 x 3.6m Line 3-1 PRECOOLING RM 1


Air curtain FL-200 2-1 SORTING RM 1
CH=6000
300kg CH=6000
300kg SLOPE
7800

7-1 MATERIAL COLD STORAGE


7-2 PRODUCT COLD STORAGE

300kg 300kg
1-1 RECIEVING RM

CH=6000

4 COLD
CH=11500

CH=11500

STORAGE OFFICE
5900

3,200 1,080
1.080
CH=2700

SLOPE
500kg

Air curtain
00 10 JULY 2019 FOR APPROVE
5900

300kg
SLOPE 3-2 PRECOOLING RM 2

CH=6000 500kg 500kg 500kg 500kg 500kg

300kg

Rev DATE DESCRIPTION


9000

2,910
2,460

SL
20005

1-2 SHIPPING RM
5 ANTIROOM OP
CH=6000
CH=6000 E
1,700

CLIENT NAME:
SLOPE

SLOPE

CONTROL POINT
Setback Line
5000

8-c

Set Back Line


ELEC. STATION (EXISTING)
Setback Line

Setback Line

OUT
FENCE EXISTING MAIN ROAD

3
-
8.000 9.000 7.000 7.000 ELEC. POLE7.000
7.000 (EXISTING) 7.000 7.000 7.000 6.000
PROJECT NAME:
87,000 OUT

1 2 3 4 5 6 7 8 9 10 11

Lot 16A8-1 & 16A14c, TRA NOC 1 INDUSTRIAL ZONE,


BINH THUY DIST, CAN THO CITY

NOTE:
INSIDE OUTSIDE MAIN-CONTRACTOR:

- ELEVATION OF SEWAGE PIPE WILL BE BASED ON MOTAR COLLAR 5MM THK.


2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN

THE ACTUALLY CONDITION AT SITE TEL: +81-338177182 FAX: +81-338177642

UPVC PIPE SLEEVE STEEL PIPE SLEEVE


CONTRACTOR:
- WALL'S DEPTH IS JUST FOR REFERENCE, PLEASE
REFER TO STRUCTURAL DRAWING FOR DETAIL OFFICE: 17 BUI VAN BA ST., TAN THUAN DONG WARD, DIST.7, HCMC, VIET NAM
SILICONE SEALANT REP. OFFICE: 6TH FLOOR, MELODY TOWER, 422-424 UNG VAN KHIEM ST.,

PIPE PIPE WATERPROOFED MOTAR WARD 25, BINH THANH DIST, HCMC, VIET NAM

PREPARED CHECKED APPROVED

CONCRETE WALL CONCRETE WALL WELD

DRAWING TITLE:

CT1. PIPE THROUGH WALL DETAIL CT2. PIPE THROUGH WALL WATERPROOFED DETAIL

DWG No:

A3 SCALE: 1/50 Rev: 00


CONSTRUCTION DRAWING

GL+1100 GL+1100

U-BOLT M10

STEEL L50x50

Steel column

GL+1100
U-BOLT M10
Pipe support
See CT3 00 10 JULY 2019 FOR APPROVE

Rev DATE DESCRIPTION


Conc. curb CLIENT NAME:

PROJECT NAME:
Pipe support
See CT4
Pipe support Lot 16A8-1 & 16A14c, TRA NOC 1 INDUSTRIAL ZONE,
BINH THUY DIST, CAN THO CITY

See CT4

GL+0

MAIN-CONTRACTOR:

2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN


TEL: +81-338177182 FAX: +81-338177642

CONTRACTOR:

NOTE: OFFICE: 17 BUI VAN BA ST., TAN THUAN DONG WARD, DIST.7, HCMC, VIET NAM
REP. OFFICE: 6TH FLOOR, MELODY TOWER, 422-424 UNG VAN KHIEM ST.,
WARD 25, BINH THANH DIST, HCMC, VIET NAM

PREPARED CHECKED APPROVED

- ELEVATION OF SEWAGE PIPE WILL BE BASED ON THE ACTUALLY CONDITION AT SITE DRAWING TITLE:

- WALL'S DEPTH IS JUST FOR REFERENCE, PLEASE REFER TO STRUCTURAL DRAWING FOR DETAIL

DWG No:

A3 SCALE: 1/50 Rev: 00

You might also like