AS BUILT DRAWING

PROJECT NAME:

PROJECT RUBY
CLIENT NAME:

JFE MERANTI MYANMAR CO.,LTD.

SEE DETAILS @ M-U-PW-11 SEE DETAILS @ M-U-PW-11 SEE DETAILS @ M-U-PW-13 LEGEND:
POINT OF USE - 2 TYPICAL DETAILS POINT OF USE - 1 TYPICAL DETAILS POINT OF USE - 8 TYPICAL DETAILS
1 - TYPICAL POINT OF USE - 1

2 - TYPICAL POINT OF USE - 2

10 X 9 10 X 9
3 - TYPICAL POINT OF USE - 3
1 BOP: FL+5.500
PW-DN50 1 1 1 BOP: FL+5.500
PW-DN50 1 1 1 BOP: FL+5.500
PW-DN50 1
4 - TYPICAL POINT OF USE - 4
2 1

BOP: FL+6.000
PW-DN50

PW-DN50
5 - TYPICAL POINT OF USE - 5

BOP: FL+5.500
PW-DN50
6 - TYPICAL POINT OF USE - 6

PW-DN50
PW-DN100 PW-DN100

7
PW-DN50

3 3 3 11 12 8 3
BOP: FL+15.000 BOP: FL+15.000

- TYPICAL POINT OF USE - 7


BOP: FL+6.500 BOP: FL+6.500 BOP: FL+6.500 BOP: FL+6.500
PW-DN80 PW-DN80 PW-DN80 PW-DN80 PW-DN50 PW-DN50

7
Paint Lathe

BOP: FL+2.500
7 2
Gal Work Area TRENCH & GATE TRENCH & GATE

Truck Access Way Oil Storage Concentrated


Chrome Tank

BOP: FL+4.500
Oil Separation

Backup
8
Stage 2a

- TYPICAL POINT OF USE - 8


Metal Lathe (Size TBC) Acidification

PW-DN50
Waste Water Tank
Stage 1a
Filter Press EL 000
Stage 9b Diameter 7650 x 8460 High
Chemical Storage Contents 380 m3

Chocks 4100 x 7500 x 3000H


EL000
RC Floor, Block Wall, Cladding to Roof
(Total 400 tons)

SLAB Thk: 800mm


Number of Pile : 20 Nos
Neutralization
Stage 3a
Oxidation

1
Stage 3b

1 9
Chrome
Acidification

- TYPICAL POINT OF USE - 9


Reduction
Stage 1b

BOP: FL+5.500
4
Blower/ Compressor Room

BOP: FL+5.500
Pressure Clean Bay 2b

2
Fall to rear corner pit
4100 x 7500 x 3000 High
Waste Water Tank

BOP: FL+5.500
EL000
PW-DN50 Wash EL 000

PW-DN50
RC Floor, Block Walls, Cladding to Roof

PW-DN50
Tank Diameter 4000 x 8460 High
Contents 100 m3

PW-DN50
(Total 105 tons)
Sludge Thickener pH adjustment DAF Flocculation
Stage 9a Stage 5 Storage 5 Stage 4
SLAB Thk: 800mm

450
Number of Pile : 6 Nos
Pit Sump
EL -500 EL - 1500
3850 x 4800 750x750

Treated Water Storage Tank

10 - TYPICAL POINT OF USE - 10


6
H2SO4 EL 000
Diameter 5972 x 8460 High

Bund Wall EL + 500


Sand Filter Sand Filter AC Filter AC Filter Contents 210 m3
EL+000 EL+000 EL+000 EL+000
Sump
(Total 220 tons)
EL - 1500
Down

2,001
750x750
Electrical
SLAB Thk: 800mm
HCL

450
Room Office Room Laboratory
EL +4500 4800 x 3500 x 2500 H 5200 x 3500 x 2500H Number of Pile : 11 Nos
3600 x 3500 x 2500 High EL +4500 EL +4500
RC Floor, Block Walls RC floor, Block Wall, Cladding to Roof RC Floor, Block Wall, Cladding to Roof

Down
Lime Mixing Lime Slurry

4,800 1,300

11 - TYPICAL POINT OF USE - 11


Sump
Pit EL - 1500
FUTURE

EL - 500 750x750
3650 x 4800 AC Filter AC Filter
NaOH
PW-DN80

Lime Silo
Down
Demin Water Storage Tank
Down
EL 000
Treated Water Storage Tank
Diameter 4226 x 8460 High

4,800
Pit
Down EL 000
EL - 500 Contents 120 m3
4400 x 4800 Multimedia Multimedia Diameter 5972 x 8460 High
Pit (Total 125 tons)
EL -150
Filter Filter Contents 210 m3

Bund Wall EL + 500


3600 x 3600
(Total 220 tons)

7 7
Na2S2O3 FeSO4 SLAB Thk: 800mm

2
00 Number of Pile : 07 Nos
FUTURE

SLAB Thk: 800mm

+ 3.5 Cationic Anionic


Number of Pile : 11 Nos

12 - TYPICAL POINT OF USE - 12


PAM PAM RI Raw
FL Water Tank
P:
Na2S2O3 FeSO4 Anionic Anionic Cationic Cationic
Resin Resin

1,400
Resin Resin

BO Sump
Sump
EL - 1000
EL - 1500 750x750
750x750

Bund Wall EL + 500

PW-DN100

SEE DETAILS @ M-U-PW-11 SEE DETAILS @ M-U-PW-12


2 5 POINT OF USE - 3 TYPICAL DETAILS POINT OF USE - 6 TYPICAL DETAILS

L2
6 24 X 10

BOP: FL+6.500
PW-DN100
PW-DN125

PW-DN80
LOCK SEAMER

SEE DETAILS @ M-U-PW-13 L1 7 7 2


ALKALI CHEMICAL CHEMICAL STORE
GUILLOTINE

STORE POINT OF USE - 9 TYPICAL DETAILS

BOP: FL+5.500
BOP: FL+4.500

PW-DN50
PRESS PUNCH

PW-DN50
2 5 3 10 3 9 3 3
PW-DN80 BOP: FL+6500
BOP: FL+6500

BOP: FL+5.500
4 8 4 4 4
L

10
BOP: FL+6500 BOP: FL+6500 BOP: FL+6500
PW-DN80 PW-DN80

PW-DN50
9 10 11

BOP: FL+5.500
BOP: FL+6500
BOP: FL+6500

PW-DN50
SEE DETAILS @ M-U-PW-11 SEE DETAILS @ M-U-PW-12
POINT OF USE - 4 TYPICAL DETAILS
PW-DN80

POINT OF USE - 3 TYPICAL DETAILS


PW-DN50

7 2
BOP: FL+5.500
1 1 1 1 1 2 2 2 2 2
2 2
PW-DN50

0 20 Aug 19 FOR APPROVAL

REV DATE DESCRIPTION

REVISIONS
BOP: FL+9.000
PW-DN50

1 7 2 CONTRACTOR:

2 2

BOP: FL+5.500
2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN

PW-DN50
TEL: +81-338177182 FAX: +81-338177642
SLAB
2
BOP: FL+5.500

LV

CIVIL & STRUCTURAL ENGINEER :


PW-DN50

2 2 7

BOP: FL+5.500
PW-DN50
2 2
SLAB SLAB

ADMISTRATION OFFICE
PW-DN50

7
BOP: FL+ 5.500
PW-DN50
STEEL STRUCTURAL DESIGN:
PW-DN50

BOP: FL+5.500
G2-B

SEE DETAILS @ M-U-PW-12

PW-DN50
G2-A

SLAB
+10 +10 +10 1
LV
BOP: FL+ 5.500
PW-DN50

POINT OF USE - 7 TYPICAL DETAILS

SLOPE 1%

SLOPE 1%
+0 +0 +0 +0

G1-1 G1-2 G1-3

G1-B LV LV

LV LV LV LV
STOPPER
CONCRETE CURB (120x120)

OVER HEAD GUIDE RAIL


ASL+6.205
ASL +6.355

LV
MECHANICAL DESIGN:
G1-A

CONIC - MM ENGINEERING CO., LTD


Address: No. B306, Pearl Condominium, Kabar Aye Pagoda Road,
Bahan Township, Yangon City - Myanmar
Tel: +951551757
E-mail: info@coniccorp.com.vn
Website: www.coniccorp.com.vn

ELECTRICAL DESIGN:
TAMADA ENGINEERING & SERVICES COMPANY LTD
Yangon office: No.52 B Aung Chan Thar Housing Township, Yangon City,
Union of Myanmar.
Tel: +95 9422286688, Email: sonnguyen@tamadaco.com
Website: www.tamadaco.com

PREPARED BY CHECKED BY CHECKED BY APPROVED BY

CONIC PHYOKO T.J TAKARA

KEYPLAN OF POINT OF USE DRAWING TITTLE:

PROCESS WATER SUPPLY SYSTEM


KEY PLAN OF POINT OF USE

DWG No: M-U-PW-10 REV: 0

SCALE: A3/ 1:1000 A1/ 1:500 SHEET: 10