You are on page 1of 1

AS BUILT DRAWING

5 PROJECT NAME:
MAIN BUILDING
Q PROJECT RUBY
B

1,755
CLIENT NAME:
MAIN BUILDING

16,990 6,005 4,000


JFE MERANTI MYANMAR CO.,LTD.
1,255 250 5,410 250 4,220 250 6,610 250 5,755 250
125

125
250

250
B

590

800 595
710
725

800
3,200 6,100 7,690 1,100 1,900

1,560
2,240 1,430 330 10 X 9 10 X 9

2,100

1,670

1,700

1,940

3,151

800
DRAIN FILTER A
RECEIVER A Gal Work Area
Paint Lathe

Truck Access Way Oil Storage

Oil Separation
4,285

Backup
Stage 2a
Metal Lathe (Size TBC)

3,200

3,000
Filter Press

(4 TON)
Stage 9b
Chemical Storage

Chocks 4100 x 7500 x 3000H


EL000
RC Floor, Block Wall, Cladding to Roof

LINE FILTER A
Oxidation
Stage 3b

Reduction

MIST FILTER A
Blower/ Compressor Room

LINE FILTER A
Pressure Clean Bay
Fall to rear corner pit 4100 x 7500 x 3000 High
EL000
Wash RC Floor, Block Walls, Cladding to Roof
Tank

Sludge Thickener pH adjustment DAF


Stage 9a Stage 5 Storage 5

450
800
DES. AIR DRYER A
H2SO4

Bund Wall EL + 500


REF. AIR DRYER A
Sand Filter Sand Filter AC Filter AC Filter
EL+000 EL+000 EL+000 EL+000

Down

2,001
HCL

450
Down

2,900
1,230

1,200

FUTURE
AC Filter AC Filter
NaOH
Lime Silo
Down

(1 TON)
Demin Water Storage Tank
Down

(1 TON)

960
Diameter 4226 x 8460 High
Down Contents 120 m3
Multimedia Multimedia (Total 125 tons)
Filter Filter

Bund Wall EL + 500


SLAB Thk: 800mm
Number of Pile : 07 Nos

FUTURE
300
RI Raw
Water Tank

1,000 Bund Wall EL + 500

200

800 600 800

300
1,000 850 400
DRAIN FILTER B

1,300
1,670

1,700

1,940
LINE FILTER B
200

MIST FILTER B LINE FILTER B

A RECEIVER B
A

3,149
(4 TON)
2,015

1,200

1,505 600 600 600 600 600 600 600 600 600 600 800
DES. AIR DRYER B REF. AIR DRYER B

2,900
1,230

1,200
(1 TON)

960
(1 TON)
13,500

13,750

13,500
5,800
250

250
FUTURE

500 1,800 1,200 2,860


1,670

1,700

1,940
6,100
DRAIN FILTER C
RECEIVER C 235
2,015

3,300
(4 TON)
LINE FILTER C MIST FILTER C LINE FILTER C

3,150
2,300
DES. AIR DRYER C 1,250 REF. AIR DRYER C
(1 TON) (1 TON)
1,600 2,000 2,000 1,195
200

2,000 2,000

3,600
1,000 1,000
2,050

2,000
1,500

200
1,000 1,000 0 20 Aug 19 FOR APPROVAL
FUTURE

REV DATE DESCRIPTION


5,305

3,000

2,685 940 375 REVISIONS


200

COMPRESSOR A

3,905
COMPRESSOR C COMPRESSOR B
1,500

2,540
(4 TON) CONTRACTOR:

3,150
(4 TON) (4 TON)
2,035

2-2-8, KORAKU, BUNKYO-KU TOKYO (112-8576) JAPAN


TEL: +81-338177182 FAX: +81-338177642
AIR COMPRESSOR 2,200 UTILITY ROOM
1,041

3,600 4,000
PUMP HOUSE AND EER
CIVIL & STRUCTURAL ENGINEER :
250

250
126
125

A DOOR

325 1,020 900 270 3,000 270 200 1,290 200 1,840 250 1,310 200 2,040 470 1,290 200 1,100 250 1,910 200 2,040 200 1,405 250
690 STEEL STRUCTURAL DESIGN:

B MECHANICAL DESIGN:
CONIC - MM ENGINEERING CO., LTD
1 LAYOUT PLAN 2 3 4 Address: No. B306, Pearl Condominium, Kabar Aye Pagoda Road,
Bahan Township, Yangon City - Myanmar
Tel: +951551757
SCALE:1/100 E-mail: info@coniccorp.com.vn
Website: www.coniccorp.com.vn

ELECTRICAL DESIGN:
TAMADA ENGINEERING & SERVICES COMPANY LTD
Yangon office: No.52 B Aung Chan Thar Housing Township, Yangon City,
Union of Myanmar.
Tel: +95 9422286688, Email: sonnguyen@tamadaco.com
Website: www.tamadaco.com

PREPARED BY CHECKED BY CHECKED BY APPROVED BY

CONIC PHYOKO T.J TAKARA

DRAWING TITTLE:

AIR COMPRESSOR SYSTEM


COMPRESSOR ROOM LAYOUT PLAN

DWG No: M-U-CA-05 REV: 0

SCALE: A3/ 1:100 A1/ 1:50 SHEET: 05

You might also like