Professional Documents
Culture Documents
A B C
North Elevation
5.975 5.975
A B C
12,000
75 5,900 5,975 125
200 11,800 200
1
50 5,725 250 5,725 250
PV PV
125
125
200
200
250
250
Plan Notes
GENERAL
5,350
5,100
5,100
6 5 4 3 2 1 3. All sec ons should be read as per the floor plan
and all drawings must be read in context with
each other . Any discrepancies must be no fied
immediately to the designer and clari fied by
4.600 4.600 4.600 4.600 6.450 consul ng the respec ve consultants
drawings .
Signed..
Construction Notes
NOTES CONSTRUCTION .........................................................
2 2
4. Damp proof course must be provided under all
external walls at grade . DPC to be minimum
150 mm above ground level .
250
250
5. All slab at ground to be poured on 1000 gauge
polythene on 50mm stone dust blinding on
compacted hardcore .
6. All soils under slab and around external
founda on to be treated for termite control .
.
7. Window sills must be finished before internal
plastering .
4,600
4,600
4,350
4,350
PV
S-01 S-01 Site Notes
East Elevation
CIVIL
CLIENT
ELEVATION 02 8. All soils on cut embankment to be stabilized . The
slope is not to exceed the natural angle of
C B A repose of the soil .
STRUCTURAL
3 3
West Elevation
5.975 5.975
9. All RC works to Structural Engineer ’s details .
P.O BOX 21200
250
250
10. Depth of founda on to SE ’s approval . NAIROBI
11 . All walls less than 200 mm thick to be reinforced
LOADING ZONE
with hoop iron at every alternate course .
MECHANICAL
.........................................................
23,600
23,600
24,000
24,000
12. All plumbing and drainage to comply with the
relevant approving local authority ’s specifica ons
4,600
4,600
4,350
4,350
PROJECT TEAM
B
13. All service ducts to be accessible from all flo ors.
PV 14. Deep seal or an -vac to all connected to
the SVPs or waste pipes . All bends and junc ons to have
inspec on plate ARCH C.K MUTHOGA
15. SVP to be provided at the head of the drainage .
16. Drain pipes passing beneath buildings and
driveways to be encased in 150 mm concrete ARCH LIDIEMA KEVIN
surround .
17. All underground foul and waste drain pipes
shall be UPVC and comply with BSS 4514 and
5255 .
18. All inspec on chamber covers and frames shal l
4 4 be cast iron to comply with BSS 497 table 6
grade C except ones in the driveway which shall
250
250
comply to BSS 556 .
19. Storm water drain shall comply with BSS 556 .
20. Minimum slopes to drains shall be 1%.
ELEVATION 03 21. No chasing will be allowed in the slabs for
pipes . Sleeves will be allowed in the slabs with
1 2 3 4 5 6 the wri en ap proval of the structural engine er.
22. All tes ng of pipes must be complted before
plastering .
4,600
4,600
4,350
4,350
6.450 4.600 4.600 4.600 4.600 23. All mechanical works must be coordinated with
PV electrical works . Any con flicts must be clarified
before work begins .
ELECTRICAL
5 5
FIRE NOTES
250
hose reel .
2. Provide emergency lights in staircase
3. Provide automa c to cover
project .
4. Provide fire exit signs .
5. Provide 1. No. 9kg dry powder
ex nguisher
6. Provide smoke detectors .
4,600
4,600
4,400
4,600
200
200
2,250
2,250
2,250
Proposed development of a
A rc slab
storage house in
Ruiru East Varsity Ville Estate
300
300
250 5,725 250 5,725 250 300m deep rc beem to
300
300
300
300
200 11,800 200 SEs details Drawing Title:
RUIRU EAST VARSITY
1,770
1,770
75 5,900 5,975 125
200mm thick masonry wall Project Data VILLE STORAGE
12,000 finished to clients approval
5,000
HOUSE
4,900
4,900
200mm thick masonry
2,530 300
2,530 300
4,000
A boundary wall B C 300mm thick rc slab to
SEs details finished to
Date: 06/03/2020
clients approval
South Elevation
Drawn: Lidiema Kevin
300
300
300
300
GROUND PLAN 150mm thick rc slab on 1000mm
gauge polythene sheeting dpm
on 50mm thick murram blinding Checked: C.K Muthoga
SECTION 01-01
on 300mm deep well compacted
hardcore to structural engineers Scale:
details. 1:65.00, 1:100
all foundations and blinding to be
treated against termite with Layout ID Revision
approved termicide. A.01
GSPublisherVersion 0.0.100.100
(termido or equal)