Professional Documents
Culture Documents
1,200
P.O BOX 100674, Kampala.
1,800
Tel: +256-(0)0776 003 799
eq.
Web: info@pmconsultuganda.com
592
1,200
Elevation
592 eq. GENERAL NOTES
(1) Contractor to verify dimensions on site
2,100
before commencement of works and
592 eq. report any discrepancies to consulting
1,500
Architect.
900
FLOOR SKIRTING
600
600
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
600
1,800
600
600
(E) 10mm quary tiles finish
beam soffit
2,400
SKIRTING
(A) 150mm Cement/Sand Plaster
600
600
600
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
571 eq.
600
600
WALLS
(A) 12mm thick painted Cement/Sand Plaster
Elevation 571 eq. (B) Wallpaper
1,500
(C) 6mm Ceramic Tiles
600
900
(E) Glass
floor finish level
300
eq.
592
Aluminium glazed Window ditto ditto CEILING
(A) Painted Cement/Sand Plaster
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 (B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
REVISIONS
600
600
600
600
600
2,400
2,400
571 eq. 600 eq.
600
Client:
Elevation GOVERNMENT OF UGANDA
Ministry of Health
600
600 eq.
2,100
2,100
P.O BOX 37392, Kampala-
600 eq. MINISTRY OF HEALTH
Uganda
900
Project:
floor finish level Aluminium glazed Window ditto ditto ditto REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
Location:
beam soffit
600
600
600
600
600
eq.
1,800
600
600
600
600
600
Date:
600
600
2,100
2,700
eq.
1,500
600
1,500
900
floor finish level Aluminium glazed Window ditto ditto ditto ditto
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
Quantity 1 1 1 1 1 1 2 4 3 7 3 6 6 15 1 2 2 2 2 1 3
GSPublisherVersion 0.1.100.100
Mark W4-10c W5-6b W3-4b W3-4c W3-4d W3-3b
5,710 6,365 2,400 2,400 2,400 1,800
beam soffit
600
600
600
Plot 20, Kenneth Dale,
1,200
Off Kira Road, Kamwokya,
1,800
600
600
600
P.O BOX 100674, Kampala.
2,540
2,740
2,540
600 eq. Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
3,000
600
600
Elevation
571 eq.
600
2,100
GENERAL NOTES
(1) Contractor to verify dimensions on site
1,500
600
1500
1500
1500
report any discrepancies to consulting
Architect.
floor finish level Aluminium glazed Window ditto ditto ditto
eq.
ditto ditto (2) Architectural drawings to be read with
300
1,058
relevant structural, mechanical and
electrical drawings.
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 (3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
FLOOR SKIRTING
beam soffit
600
600
600
600
600
600
FLOOR
600
1,200
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
1,800
1,800
600
600
600
600
600
600
600
(D) 25mm thick Granite
2,540
(E) 10mm quary tiles finish
600 eq. 600 600 eq.
SKIRTING
600
600
600
600
Elevation (A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
eq. 600 (C) 9mm, 150mm high Ceramic Tiles
600
(D) 150mm high Granite
600
2,100
2,100
WALLS
600 eq.
1,500
1,500
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
1500
600
(C) 6mm Ceramic Tiles
floor finish level Aluminium glazed Window ditto ditto ditto ditto (D) 12mm thick Granite
ditto ditto ditto (E) Glass
300
600
CEILING
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
Quantity 8 10 3 4 7 30 3 1 6 3 1 18 14 20 20 12 4 2 1 1 1 1 1 1 3 16 12 7 12 11 32 1 1 2 4 3 1 NO.
REVISIONS
DATE. DESCRIPTION
beam soffit
600
600
600
600
ISSUES
NO. DATE. ISSUED TO NO. DATE.
1,800
1,800
600
600
600
600
600
3,000
3,000
600
600
600
Elevation eq.
Client:
505
1,200 eq.
GOVERNMENT OF UGANDA
600
600
Ministry of Health
Uganda Heart Institute
1,500
1,500
P.O BOX 37392, Kampala-
600
MINISTRY OF HEALTH
Uganda
ditto
900
300
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY
Location:
Drawing Title:
Mark WX-3a WX-3b WX-3c WX-3d WX-3d
DRAWING NO :
Elevation
2,550
2,600
2,600
2,600
2,336
2,336
2,110
1,846
1,576
1,312
1,200
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
GSPublisherVersion 0.1.100.100
RESEACH BLOCK B
Window Schedule
Mark W2-12b W2-12c W2-12d
7,500 7,500 7,500
900
Off Kira Road, Kamwokya,
1,550
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799
1,750
625 eq. Web: info@pmconsultuganda.com
Elevation
625 eq. GENERAL NOTES
1,750
(1) Contractor to verify dimensions on site
eq. before commencement of works and
625
report any discrepancies to consulting
1,500
Architect.
900
FLOOR SKIRTING
1,500
(D) 25mm thick Granite
1,500
(E) 10mm quary tiles finish
SKIRTING
1,750
1,750
1,150
1,150
600 eq. 600 eq.
(C) 6mm Ceramic Tiles
900
900
REVISIONS
900
1,500
1,500
1,500
1,500
600 eq.
Elevation Client:
GOVERNMENT OF UGANDA
600 eq. 600 eq. eq. eq.
600 600 Ministry of Health
1,750
Uganda Heart Institute
P.O BOX 37392, Kampala-
1,150
1,150
1,150
MINISTRY OF HEALTH
Uganda
1,150
Location:
Quantity 10 10 4 5 6 6 2 2 4 8 1 1 1
Division, Kampala District
Drawing Title:
beam soffit
Job No.: Dwg Ref.
Revision No.
1,500
Scale:
beam soffit
1,550
Date:
1,750
Drawn by:
2,350
2,350
Elevation Checked by: Arch. Rubongoya. P
1,500
900
300
Aluminium glazed Window 600
Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
Quantity 14 42 8 8 8 8 2 3 5 1 2 2 2 6 2 1 2 2 6 2 2
GSPublisherVersion 0.1.100.100
CLINICAL BLOCK A
SECTION A: Alumunium Door Schedule Plot 20, Kenneth Dale,
Mark D-A1 D-A2 D-A3 D-A4 Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
5,879 10,881 Tel: +256-(0)0776 003 799
7,115 6,768
1,191 1,191 1,191 1,191 1,191 1,191 1,787 1,787 1,787 1,787 1,470 1,470 1,470 1,470 1,197 1,146 1,146 975 975 975 975 1,146 1,146 1,197 Web: info@pmconsultuganda.com
beam soffit
600
1,200
1,200
1,200
GENERAL NOTES
600
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
Elevation
3,300
3,300
3,300
3,300
(2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.
2,100
2,100
2,100
2,100
FLOOR SKIRTING
Location
WALLS CEILING
Quantity 2 1 1 1 FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
Mark D-A5 D-A6 D-A7 D-A8 D-A9 D-A10 WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
3,600 3,300 1,800 1,800 1,800
40,79
beam soffit 900 900 900 900 825 825 825 825
CEILING
1,020 1,020 1,020 1,020 800 800 900 900 900 900 (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
600
600
600
600
600
600
Elevation REVISIONS
2,700
2,700
2,700
2,100
2,100
2,100
2,100
2,100
Project:
REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY
Partitions SECTION D: Mild Steel doors
Mark Mark D-M1 D-D1 D-D2 D-D3 D-D4 D-D5 Location:
6,850
1,500 1,200
1,500
1,900
1,900
1,900
1,900
1,900
1,900
1,900
1,900
1,900
1,900
Date:
Push plate
Drawn by:
1,500
200
200
200
200
floor finish level floor finish level
DRAWING NO :
50-75mm topping screed 50-75mm topping screed
Structural Finish level Structural Finish level
1.5mm louvered doors in
Typical Aluminium glazed Partition of 1.5m with fixed glass on 1.5m wall high. Mild steel grilled door 50x50x3mm RHS frames and
50x50x4mm frames to duct opennigs ditto ditto ditto
Level 1 2 3 4 5 6 7 Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 ditto
4 5 6 7
Quantity 4 5 Quantity 2 2 2 2 2 2 2 2 2 2 22 21 21 21 21 21 1 1 1 1 1 1 1 3 2 4 1 3 3
GSPublisherVersion 0.1.100.100
SECTION B: Flush doors
Mark D-W1 D-W2 D-W3 D-W4 D-W5 D-W6
2,500
2,500
2,500
2,500
2,500
before commencement of works and
report any discrepancies to consulting
Architect.
Push plate
(2) Architectural drawings to be read with
relevant structural, mechanical and
floor finish level
electrical drawings.
kick plate kick plate (3) All retaining walls to be damp proofed
50-75mm topping screed civil engineer's specification and
Structural Finish level detailing.
(4) Drainage pipes under drive ways to have
solid core flush door ditto ditto ditto ditto ditto 150mm concrete surrounding.
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
KEY FINISHING
FLOOR SKIRTING
Quantity 10 10 10 10 10 11 4 4 4 4 4 4 4 4 9 9 9 9 12 9 9 20 20 20 22 20 20 20 56 56 58 56 56 56 56 43 43 43 48 43 43 43
WALLS CEILING
67 FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
SECTION C: Fire doors (A) 150mm Cement/Sand Plaster
Mark D-F1 D-F1' D-F2 D-F3 D-F3' (B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
beam soffit (D) 12mm thick Granite
(E) Glass
1,800 1,800 900
1100 900
CEILING
900 900 900 900
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
Elevation (C) Armstrong ceiling
(D) Gypsum plaster
2,100
2,100
2,100
2,100
2,100
REVISIONS
NO. DATE. DESCRIPTION
Quantity 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9 10 9 9 9 9 9 1 2 2 1 1 1 2
Client:
GOVERNMENT OF UGANDA
Ministry of Health
Uganda Heart Institute
P.O BOX 37392, Kampala-
MINISTRY OF HEALTH
Uganda
Project:
REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
SECTION B: special doors for Radiology , Nuclear medice and X-ray rooms PROPOSED 250 BEDS UHI FACILITY
2,100
2,100
2,100
2,100
Drawn by:
Checked by: Arch. Rubongoya. P
floor finish level
kick plate kick plate
50-75mm topping screed DRAWING NO :
Structural Finish level
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
Quantity 1 5 2 15 1
GSPublisherVersion 0.1.100.100
RESEACH BLOCK B
Door Schedule Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
SECTION E:Purpose Windows SECTION A: Alumunium P.O BOX 100674, Kampala.
Mark Mark D-A1 D-A2 D-A3 Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com
550
550
550
2,400 1,200 Architect.
800 1,000 (2) Architectural drawings to be read with
800 relevant structural, mechanical and
Elevation Elevation electrical drawings.
1,200
(3) All retaining walls to be damp proofed
800
1,000
2,650
2,650
2,650
civil engineer's specification and
800
600
detailing.
2,100
2,100
2,100
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
900
900
900
900
floor finish level floor finish level 150mm high terrazzo 150mm high terrazzo
haunching to take door frame haunching to take door frame
50-75mm topping screed 50-75mm topping screed KEY FINISHING
Structural Finish level Structural Finish level
Path throught box Normal viewing glass lead viewing glass cath lab lead viewing glass CT scan lead viewing glass X-ray scan Aluminium glazed door Aluminium glazed door Aluminium glazed door FLOOR SKIRTING
FLOOR
(A) 30mm Cement/Sand Screed
Quantity 8 5 8 3 3 Quantity 3 3 3 3 3
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
SECTION C: Fire doors SECTION B: Flush doors (C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
Mark D-F1 D-F3 Mark D-W1 D-W2 D-W3 D-W4 D-W5 D-W6 WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
1,800
beam soffit beam soffit 900 900
1,500
300
1,200
900
1100 900 800
CEILING
900 600
1,800 (A) Painted Cement/Sand Plaster
900
(B) Powder coated aluminiumsuspended
900 900
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster
Elevation Elevation
REVISIONS
2,650
2,650
2,650
2,650
2,650
2,650
2,650
2,665
2,665
NO. DATE. DESCRIPTION
2,100
2,100
Push plate
30min t0 1hr fire rated doors ditto rooms and bathrooms/stores resp. ditto ditto ditto ditto ditto NO. DATE. ISSUED TO NO. DATE.
Level 1 2 3 4 5 6 1 2 3 4 5 6 Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
Project:
Partitions REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
Mark WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY
6,850 7,500
Location:
650
Drawing Title:
Elevation
3,300
2,650
2,650
2,100
Quantity 7 5 7 5 5 15 21 8 2 7 7 1
GSPublisherVersion 0.1.100.100
STAFF ACCOMODATION BLOCK C
Mark D-1 D-2 D-3 900 D-4 750 F-1 D-5 W-1
3,000 1,500 900 4,070
450
450
beam soffit 900
1,000
600
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
2,550
2,550
P.O BOX 100674, Kampala.
600
2,100
2,100
1,900
1,900
Tel: +256-(0)0776 003 799
Elevation Web: info@pmconsultuganda.com
900
200
floor finish level
GENERAL NOTES
1.5mm louvered doors in 1.5mm louvered doors in (1) Contractor to verify dimensions on site
Aluminium glazed door Hardwood panneled door solid core flush doors to internal 30min t0 1hr fire rated doors Aluminium glazed window before commencement of works and
50x50x3mm RHS frames and 50x50x3mm RHS frames and
rooms and bathrooms/stores resp. report any discrepancies to consulting
50x50x4mm frames to duct opennigs 50x50x4mm frames to duct opennigs Architect.
(2) Architectural drawings to be read with
Level 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
Location civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
Quantity 8 8 8 8 8 8 1 1 2 9 36 36 36 36 36 36 6 4 12 12 12 12 12 12 6 4 4 4 4 4 4 4 4 10 10 10 10 10 10 4 1
KEY FINISHING
Mark W-2 W-3 W-4 W-5 W-6 W-7 W-8 FLOOR SKIRTING
3,208 3,267 2,400 1,200 1,200 600
450
beam soffit WALLS CEILING
1,350
FLOOR
600
1,650
1,650
1,650
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
2,250
1,500
600 eq. 600 eq. 600 eq. SKIRTING
1,200
(A) 150mm Cement/Sand Plaster
900
900
900
floor finish level (C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
300
Quantity 1 1 4 28 28 28 28 28 28 12 2 4 4 4 4 4 4 1 4 10 10 10 10 10 10 4 16 24 24 24 24 24 24 16 6 4 4 4 4 4 4 4
REVISIONS
1,800
1,800
1,800
2,500
2,500
3,000
Elevation Client:
GOVERNMENT OF UGANDA
1,500
1,500
1,500
1,500
Ministry of Health
Uganda Heart Institute
P.O BOX 37392, Kampala-
Heavy duty roller shutter with solid core flush doors to internal Project:
Aluminium glazed window ditto ditto ditto REVIEW OF ARCHITECTURAL, ENGINEERING
operating gear rooms and bathrooms/stores resp.
DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
Level HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY
W/Shop Gen. House W/Shop Gen. House W/Shop Gen. House W/Shop W/Shop W/Shop
Location Location:
Date:
1,200
1,200
Drawn by:
2,400
2,400
2,749
2,400
DRAWING NO :
900
900
200
GSPublisherVersion 0.1.100.100