CLINICAL BLOCK A

Window/ Fun Lights Schedule


Mark W1-12b W1-12c W1-12d
7,100 7,100 7,100

beam soffit Plot 20, Kenneth Dale,


Off Kira Road, Kamwokya,

1,200
P.O BOX 100674, Kampala.

1,800
Tel: +256-(0)0776 003 799
eq.
Web: info@pmconsultuganda.com
592

1,200
Elevation
592 eq. GENERAL NOTES
(1) Contractor to verify dimensions on site

2,100
before commencement of works and
592 eq. report any discrepancies to consulting

1,500
Architect.
900

(2) Architectural drawings to be read with


floor finish level relevant structural, mechanical and
Aluminium glazed Window ditto ditto electrical drawings.
(3) All retaining walls to be damp proofed
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.

Quantity 2 10 4 6 1 KEY FINISHING

FLOOR SKIRTING

Mark W2-12a W2-12b W2-12c WALLS CEILING


7,100 6,850 6,850
FLOOR
(A) 30mm Cement/Sand Screed
600

600

600
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
600

1,800
600

600
(E) 10mm quary tiles finish
beam soffit

2,400
SKIRTING
(A) 150mm Cement/Sand Plaster
600

600

600
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
571 eq.
600

600
WALLS
(A) 12mm thick painted Cement/Sand Plaster
Elevation 571 eq. (B) Wallpaper

1,500
(C) 6mm Ceramic Tiles
600

(D) 12mm thick Granite

900
(E) Glass
floor finish level
300

eq.
592
Aluminium glazed Window ditto ditto CEILING
(A) Painted Cement/Sand Plaster
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 (B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster

REVISIONS

Quantity 1 5 1 1 1 6 10 14 18 11 2 NO. DATE. DESCRIPTION

Mark W2-12d W3-8b W3-8c W3-8d


6,850 4,800 4,800 4,800
ISSUES
beam soffit
600

600
600

NO. DATE. ISSUED TO NO. DATE.


1,200

600
600

600
2,400

2,400
571 eq. 600 eq.
600

Client:
Elevation GOVERNMENT OF UGANDA
Ministry of Health
600

600 eq.
2,100

Uganda Heart Institute

2,100
P.O BOX 37392, Kampala-
600 eq. MINISTRY OF HEALTH
Uganda
900

Project:
floor finish level Aluminium glazed Window ditto ditto ditto REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL

Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 WORKS, MEDICAL EQUIPMENT AND


HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY

Location:

Plot 18-24, Naguru Avenue, Nakawa


Division, Kampala District
Quantity 5 1 4 6 3 4 1 3 2 4 1 2
Drawing Title:

Mark W4-10c W3-6b W3-6c W3-6d W3-6e


5,710 3,600 3,600 3,600 3,600

beam soffit

600

600
600
600
600

Job No.: Dwg Ref.

Scale: Revision No.


1,800

eq.
1,800
600

600
600
600
600

Date:

600 eq. Drawn by:


600

600
600

Checked by: Arch. Rubongoya. P


Elevation
.qe 571 eq.
600 DRAWING NO :
600

2,100

2,700
eq.
1,500

600
1,500
900

floor finish level Aluminium glazed Window ditto ditto ditto ditto
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

Quantity 1 1 1 1 1 1 2 4 3 7 3 6 6 15 1 2 2 2 2 1 3

GSPublisherVersion 0.1.100.100
Mark W4-10c W5-6b W3-4b W3-4c W3-4d W3-3b
5,710 6,365 2,400 2,400 2,400 1,800

beam soffit

600
600
600
Plot 20, Kenneth Dale,

1,200
Off Kira Road, Kamwokya,

1,800

600
600
600
P.O BOX 100674, Kampala.

2,540
2,740

2,540
600 eq. Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com

3,000
600

600
Elevation
571 eq.

600

2,100
GENERAL NOTES
(1) Contractor to verify dimensions on site
1,500

600 eq. 600 eq. 600 eq.


before commencement of works and

600

1500
1500

1500
report any discrepancies to consulting
Architect.
floor finish level Aluminium glazed Window ditto ditto ditto
eq.
ditto ditto (2) Architectural drawings to be read with

300
1,058
relevant structural, mechanical and
electrical drawings.
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 (3) All retaining walls to be damp proofed
civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.

Quantity 3 3 2 4 3 5 21 22 14 10 10 7 11 6 1 4 2 KEY FINISHING

FLOOR SKIRTING

Mark W3-3c W3-3d W3-2b W3-2c W3-1a W3-1c W3-1d W3-3d


1,200 1,800 1,200 600 600 600 1,200
WALLS CEILING

beam soffit
600

600

600
600
600
600
FLOOR

600

1,200
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
1,800

1,800
600

600
600

600
600
600

600
(D) 25mm thick Granite

2,540
(E) 10mm quary tiles finish
600 eq. 600 600 eq.
SKIRTING
600

600
600

600
Elevation (A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
eq. 600 (C) 9mm, 150mm high Ceramic Tiles
600
(D) 150mm high Granite

600
2,100

2,100
WALLS
600 eq.

1,500
1,500
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper

1500

600
(C) 6mm Ceramic Tiles
floor finish level Aluminium glazed Window ditto ditto ditto ditto (D) 12mm thick Granite
ditto ditto ditto (E) Glass

300
600

CEILING
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster

Quantity 8 10 3 4 7 30 3 1 6 3 1 18 14 20 20 12 4 2 1 1 1 1 1 1 3 16 12 7 12 11 32 1 1 2 4 3 1 NO.
REVISIONS
DATE. DESCRIPTION

Mark 5,047 WW-4b WW-4c WW-3a


4,800 4,800 3,599

beam soffit

600
600

600
600

ISSUES
NO. DATE. ISSUED TO NO. DATE.
1,800

1,800

600
600
600

600
600

3,000
3,000

600
600
600

Elevation eq.
Client:
505
1,200 eq.
GOVERNMENT OF UGANDA

600
600

Ministry of Health
Uganda Heart Institute
1,500

1,500
P.O BOX 37392, Kampala-

600
MINISTRY OF HEALTH
Uganda
ditto
900

floor finish level Aluminium glazed Window ditto


1,200 eq. ditto Project:
REVIEW OF ARCHITECTURAL, ENGINEERING

300
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY

Location:

Plot 18-24, Naguru Avenue, Nakawa


Quantity 1 1 1 1 1 1 1 2 2 5 2 4 3 2 2 Division, Kampala District

Drawing Title:
Mark WX-3a WX-3b WX-3c WX-3d WX-3d

Job No.: Dwg Ref.


Revision No.
beam soffit 3,200 Scale:
2,400
Date:
2,400
Drawn by:

2,400 Checked by: Arch. Rubongoya. P

DRAWING NO :
Elevation
2,550

2,600

2,600

2,600
2,336

2,336
2,110
1,846
1,576
1,312
1,200

floor finish level


850 eq. 800 eq. 800 eq. 800 eq. 800 eq.

Aluminium glazed Window ditto ditto ditto ditto

Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

GSPublisherVersion 0.1.100.100
RESEACH BLOCK B
Window Schedule
Mark W2-12b W2-12c W2-12d
7,500 7,500 7,500

beam soffit Plot 20, Kenneth Dale,

900
Off Kira Road, Kamwokya,

1,550
P.O BOX 100674, Kampala.
Tel: +256-(0)0776 003 799

1,750
625 eq. Web: info@pmconsultuganda.com

Elevation
625 eq. GENERAL NOTES

1,750
(1) Contractor to verify dimensions on site
eq. before commencement of works and
625
report any discrepancies to consulting

1,500
Architect.
900

(2) Architectural drawings to be read with


floor finish level ditto ditto relevant structural, mechanical and
Aluminium glazed Window electrical drawings.

Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 (3) All retaining walls to be damp proofed


civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.

Quantity 11 10 10 8 5 5 2 1 KEY FINISHING

FLOOR SKIRTING

Mark W3-8b W3-8b W3-6b W3-8c WALLS CEILING


4,800 4,800 3,096 4,800
FLOOR
beam soffit (A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles

1,500
(D) 25mm thick Granite

1,500
(E) 10mm quary tiles finish
SKIRTING

1,750
1,750

(A) 150mm Cement/Sand Plaster

Elevation (B) 25mm, 150mm high Hardwood


(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
600 eq.
WALLS
(A) 12mm thick painted Cement/Sand Plaster
516 eq. (B) Wallpaper

1,150

1,150
600 eq. 600 eq.
(C) 6mm Ceramic Tiles

900
900

(D) 12mm thick Granite


ditto ditto ditto
floor finish level (E) Glass
Aluminium glazed Window CEILING
(A) Painted Cement/Sand Plaster
Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 (B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster

REVISIONS

Quantity 4 2 2 2 3 3 11 1 4 4 NO. DATE. DESCRIPTION

Mark W3-6c W3-4c W3-4d W3-3c W3-2c


3,600 2,400 2,400 1,800 1,200
ISSUES
beam soffit NO. DATE. ISSUED TO NO. DATE.

900

1,500

1,500
1,500

1,500

600 eq.

Elevation Client:
GOVERNMENT OF UGANDA
600 eq. 600 eq. eq. eq.
600 600 Ministry of Health

1,750
Uganda Heart Institute
P.O BOX 37392, Kampala-

1,150

1,150
1,150

MINISTRY OF HEALTH
Uganda
1,150

ditto ditto ditto


floor finish level ditto Project:
Aluminium glazed Window REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY

Location:

Plot 18-24, Naguru Avenue, Nakawa

Quantity 10 10 4 5 6 6 2 2 4 8 1 1 1
Division, Kampala District

Drawing Title:

Mark W3-1c W3-4c W3-4b W3-2a W3-3a


600 2,400 1,200

beam soffit
Job No.: Dwg Ref.
Revision No.
1,500

Scale:
beam soffit
1,550

Date:
1,750

Drawn by:

2,350

2,350
Elevation Checked by: Arch. Rubongoya. P

600 600 eq.


DRAWING NO :
1,150

1,500

900

floor finish level ditto ditto ditto ditto


300

300
Aluminium glazed Window 600

Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

Quantity 14 42 8 8 8 8 2 3 5 1 2 2 2 6 2 1 2 2 6 2 2

GSPublisherVersion 0.1.100.100
CLINICAL BLOCK A
SECTION A: Alumunium Door Schedule Plot 20, Kenneth Dale,
Mark D-A1 D-A2 D-A3 D-A4 Off Kira Road, Kamwokya,
P.O BOX 100674, Kampala.
5,879 10,881 Tel: +256-(0)0776 003 799
7,115 6,768
1,191 1,191 1,191 1,191 1,191 1,191 1,787 1,787 1,787 1,787 1,470 1,470 1,470 1,470 1,197 1,146 1,146 975 975 975 975 1,146 1,146 1,197 Web: info@pmconsultuganda.com

beam soffit

600
1,200
1,200
1,200

GENERAL NOTES

600
(1) Contractor to verify dimensions on site
before commencement of works and
report any discrepancies to consulting
Architect.
Elevation

3,300

3,300

3,300

3,300
(2) Architectural drawings to be read with
relevant structural, mechanical and
electrical drawings.

2,100
2,100
2,100
2,100

(3) All retaining walls to be damp proofed


civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
floor finish level 150mm concrete surrounding.
50-75mm topping screed
Structural Finish level Aluminium glazed door ditto ditto ditto
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 KEY FINISHING

FLOOR SKIRTING

Location
WALLS CEILING

Quantity 2 1 1 1 FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
Mark D-A5 D-A6 D-A7 D-A8 D-A9 D-A10 WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
3,600 3,300 1,800 1,800 1,800
40,79
beam soffit 900 900 900 900 825 825 825 825
CEILING
1,020 1,020 1,020 1,020 800 800 900 900 900 900 (A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)

600

600

600

600
600
600

(C) Armstrong ceiling


(D) Gypsum plaster

Elevation REVISIONS
2,700

2,700
2,700

NO. DATE. DESCRIPTION

2,100

2,100

2,100

2,100
2,100

floor finish level


50-75mm topping screed
ISSUES
Structural Finish level
NO. DATE. ISSUED TO NO. DATE.
Aluminium glazed door ditto ditto ditto ditto ditto
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
Location
Client:
Quantity 1 2 3 2 4 4 4 4 4 4 4 4 4 3 4 GOVERNMENT OF UGANDA
Ministry of Health
Uganda Heart Institute
P.O BOX 37392, Kampala-
MINISTRY OF HEALTH
Uganda

Project:
REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY
Partitions SECTION D: Mild Steel doors
Mark Mark D-M1 D-D1 D-D2 D-D3 D-D4 D-D5 Location:

Plot 18-24, Naguru Avenue, Nakawa


Division, Kampala District
650

6,850

1,800 Drawing Title:


310

beam soffit beam soffit 900 900

1,500 1,200
1,500

750 750 600 600 450 450 450 300

Elevation Elevation Job No.:


Scale:
Dwg Ref.
Revision No.
2,700

1,900

1,900

1,900

1,900

1,900

1,900

1,900

1,900

1,900

1,900
Date:
Push plate
Drawn by:
1,500

50X50 Mild steel grills


Checked by: Arch. Rubongoya. P
200

200

200

200

200
floor finish level floor finish level
DRAWING NO :
50-75mm topping screed 50-75mm topping screed
Structural Finish level Structural Finish level
1.5mm louvered doors in
Typical Aluminium glazed Partition of 1.5m with fixed glass on 1.5m wall high. Mild steel grilled door 50x50x3mm RHS frames and
50x50x4mm frames to duct opennigs ditto ditto ditto
Level 1 2 3 4 5 6 7 Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 ditto
4 5 6 7

Quantity 4 5 Quantity 2 2 2 2 2 2 2 2 2 2 22 21 21 21 21 21 1 1 1 1 1 1 1 3 2 4 1 3 3

GSPublisherVersion 0.1.100.100
SECTION B: Flush doors
Mark D-W1 D-W2 D-W3 D-W4 D-W5 D-W6

Plot 20, Kenneth Dale,


Off Kira Road, Kamwokya,
1,800 P.O BOX 100674, Kampala.
beam soffit 1,500 1,200 1100 900 800
900 900 900 600 300 900 Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com

Elevation GENERAL NOTES


(1) Contractor to verify dimensions on site
2,500

2,500

2,500

2,500

2,500

2,500
before commencement of works and
report any discrepancies to consulting
Architect.
Push plate
(2) Architectural drawings to be read with
relevant structural, mechanical and
floor finish level
electrical drawings.
kick plate kick plate (3) All retaining walls to be damp proofed
50-75mm topping screed civil engineer's specification and
Structural Finish level detailing.
(4) Drainage pipes under drive ways to have
solid core flush door ditto ditto ditto ditto ditto 150mm concrete surrounding.
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
KEY FINISHING

FLOOR SKIRTING
Quantity 10 10 10 10 10 11 4 4 4 4 4 4 4 4 9 9 9 9 12 9 9 20 20 20 22 20 20 20 56 56 58 56 56 56 56 43 43 43 48 43 43 43
WALLS CEILING

67 FLOOR
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
SECTION C: Fire doors (A) 150mm Cement/Sand Plaster
Mark D-F1 D-F1' D-F2 D-F3 D-F3' (B) 25mm, 150mm high Hardwood
(C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
beam soffit (D) 12mm thick Granite
(E) Glass
1,800 1,800 900
1100 900
CEILING
900 900 900 900
(A) Painted Cement/Sand Plaster
(B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
Elevation (C) Armstrong ceiling
(D) Gypsum plaster
2,100

2,100

2,100

2,100

2,100
REVISIONS
NO. DATE. DESCRIPTION

floor finish level


50-75mm topping screed
Structural Finish level

30min t0 1hr fire rated doors ditto ditto ditto ditto


ISSUES
Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 NO. DATE. ISSUED TO NO. DATE.

Quantity 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9 10 9 9 9 9 9 1 2 2 1 1 1 2
Client:
GOVERNMENT OF UGANDA
Ministry of Health
Uganda Heart Institute
P.O BOX 37392, Kampala-
MINISTRY OF HEALTH
Uganda

Project:
REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
SECTION B: special doors for Radiology , Nuclear medice and X-ray rooms PROPOSED 250 BEDS UHI FACILITY

Mark D-S1 D-S2 D-S3 D-S4 D-S5


Location:

Plot 18-24, Naguru Avenue, Nakawa


Division, Kampala District

beam soffit Drawing Title:

1,800 1,500 1,200 1100 900


900 900 900 600 300 900

Elevation Job No.: Dwg Ref.

Scale: Revision No.


2,100

2,100

2,100

2,100

2,100

Push plate Date:

Drawn by:
Checked by: Arch. Rubongoya. P
floor finish level
kick plate kick plate
50-75mm topping screed DRAWING NO :
Structural Finish level

Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7

Quantity 1 5 2 15 1

GSPublisherVersion 0.1.100.100
RESEACH BLOCK B
Door Schedule Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,
SECTION E:Purpose Windows SECTION A: Alumunium P.O BOX 100674, Kampala.
Mark Mark D-A1 D-A2 D-A3 Tel: +256-(0)0776 003 799
Web: info@pmconsultuganda.com

1,500 GENERAL NOTES


beam soffit beam soffit 1100 900
(1) Contractor to verify dimensions on site
900 900
before commencement of works and
report any discrepancies to consulting

550

550

550
2,400 1,200 Architect.
800 1,000 (2) Architectural drawings to be read with
800 relevant structural, mechanical and
Elevation Elevation electrical drawings.

1,200
(3) All retaining walls to be damp proofed
800

1,000

2,650

2,650

2,650
civil engineer's specification and

800

600
detailing.

2,100

2,100

2,100
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.

900
900
900
900

floor finish level floor finish level 150mm high terrazzo 150mm high terrazzo
haunching to take door frame haunching to take door frame
50-75mm topping screed 50-75mm topping screed KEY FINISHING
Structural Finish level Structural Finish level
Path throught box Normal viewing glass lead viewing glass cath lab lead viewing glass CT scan lead viewing glass X-ray scan Aluminium glazed door Aluminium glazed door Aluminium glazed door FLOOR SKIRTING

Level 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 WALLS CEILING

FLOOR
(A) 30mm Cement/Sand Screed

Quantity 8 5 8 3 3 Quantity 3 3 3 3 3
(B) In situ Concrete finish
(C) 10mm thick Ceramic Tiles
(D) 25mm thick Granite
(E) 10mm quary tiles finish
SKIRTING
(A) 150mm Cement/Sand Plaster
(B) 25mm, 150mm high Hardwood
SECTION C: Fire doors SECTION B: Flush doors (C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
Mark D-F1 D-F3 Mark D-W1 D-W2 D-W3 D-W4 D-W5 D-W6 WALLS
(A) 12mm thick painted Cement/Sand Plaster
(B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
(E) Glass
1,800
beam soffit beam soffit 900 900
1,500
300
1,200
900
1100 900 800
CEILING
900 600
1,800 (A) Painted Cement/Sand Plaster
900
(B) Powder coated aluminiumsuspended
900 900
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster

Elevation Elevation
REVISIONS
2,650

2,650

2,650

2,650

2,650

2,650

2,650
2,665

2,665
NO. DATE. DESCRIPTION
2,100

2,100

Push plate

floor finish level floor finish level


kick plate kick plate
50-75mm topping screed 50-75mm topping screed
Structural Finish level Structural Finish level Solid core flush doors to internal ISSUES

30min t0 1hr fire rated doors ditto rooms and bathrooms/stores resp. ditto ditto ditto ditto ditto NO. DATE. ISSUED TO NO. DATE.

Level 1 2 3 4 5 6 1 2 3 4 5 6 Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6

Quantity 1 6 6 6 6 6 6 Quantity 4 4 4 4 4 2 4 8 4 4 4 4 3 5 3 3 3 3 23 13 13 13 13 3 19 22 11 11 11 Client:


GOVERNMENT OF UGANDA
Ministry of Health
Uganda Heart Institute
P.O BOX 37392, Kampala-
MINISTRY OF HEALTH
Uganda

Project:
Partitions REVIEW OF ARCHITECTURAL, ENGINEERING
DESIGN AND SUPERVISION FOR CIVIL
Mark WORKS, MEDICAL EQUIPMENT AND
HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY

6,850 7,500
Location:

Plot 18-24, Naguru Avenue, Nakawa


beam soffit
650

650

3,500 Division, Kampala District


550

Drawing Title:

Elevation
3,300

2,650

2,650
2,100

Job No.: Dwg Ref.

Scale: Revision No.

floor finish level Date:

50-75mm topping screed Drawn by:


Structural Finish level Typical Aluminium glazed Partition of 1m fixed glass and 1m bottom block board Typical Aluminium glazed Partition of 1m fixed glass and 1m bottom block board with door Typical Aluminium glazed Partition of 1m fixed glass and 1m bottom block board Checked by: Arch. Rubongoya. P
Level 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
DRAWING NO :

Quantity 7 5 7 5 5 15 21 8 2 7 7 1

GSPublisherVersion 0.1.100.100
STAFF ACCOMODATION BLOCK C
Mark D-1 D-2 D-3 900 D-4 750 F-1 D-5 W-1
3,000 1,500 900 4,070

450

450
beam soffit 900
1,000

600
Plot 20, Kenneth Dale,
Off Kira Road, Kamwokya,

2,550

2,550
P.O BOX 100674, Kampala.

600
2,100
2,100

1,900

1,900
Tel: +256-(0)0776 003 799
Elevation Web: info@pmconsultuganda.com

900
200
floor finish level
GENERAL NOTES
1.5mm louvered doors in 1.5mm louvered doors in (1) Contractor to verify dimensions on site
Aluminium glazed door Hardwood panneled door solid core flush doors to internal 30min t0 1hr fire rated doors Aluminium glazed window before commencement of works and
50x50x3mm RHS frames and 50x50x3mm RHS frames and
rooms and bathrooms/stores resp. report any discrepancies to consulting
50x50x4mm frames to duct opennigs 50x50x4mm frames to duct opennigs Architect.
(2) Architectural drawings to be read with
Level 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 relevant structural, mechanical and
electrical drawings.
(3) All retaining walls to be damp proofed
Location civil engineer's specification and
detailing.
(4) Drainage pipes under drive ways to have
150mm concrete surrounding.
Quantity 8 8 8 8 8 8 1 1 2 9 36 36 36 36 36 36 6 4 12 12 12 12 12 12 6 4 4 4 4 4 4 4 4 10 10 10 10 10 10 4 1
KEY FINISHING

Mark W-2 W-3 W-4 W-5 W-6 W-7 W-8 FLOOR SKIRTING
3,208 3,267 2,400 1,200 1,200 600

450
beam soffit WALLS CEILING

1,350
FLOOR

600
1,650
1,650

1,650
(A) 30mm Cement/Sand Screed
(B) In situ Concrete finish
2,250

(C) 10mm thick Ceramic Tiles


(D) 25mm thick Granite
(E) 10mm quary tiles finish
Elevation

1,500
600 eq. 600 eq. 600 eq. SKIRTING

1,200
(A) 150mm Cement/Sand Plaster

900
900

(B) 25mm, 150mm high Hardwood

900
floor finish level (C) 9mm, 150mm high Ceramic Tiles
(D) 150mm high Granite
WALLS
300

(A) 12mm thick painted Cement/Sand Plaster


Aluminium glazed Window ditto ditto ditto ditto ditto ditto (B) Wallpaper
(C) 6mm Ceramic Tiles
(D) 12mm thick Granite
Level 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 (E) Glass
CEILING
(A) Painted Cement/Sand Plaster
Location (B) Powder coated aluminiumsuspended
ceiling (Hunter doorglass)
(C) Armstrong ceiling
(D) Gypsum plaster

Quantity 1 1 4 28 28 28 28 28 28 12 2 4 4 4 4 4 4 1 4 10 10 10 10 10 10 4 16 24 24 24 24 24 24 16 6 4 4 4 4 4 4 4
REVISIONS

WORKSHOP and GENERATOR HOUSE


NO. DATE. DESCRIPTION

Mark D-1 D-2 D-3 W-1 W-2 W-3 W-4


3,500 1,100 800 5,555 2,222 1,111 555

beam soffit ISSUES


NO. DATE. ISSUED TO NO. DATE.
1,800

1,800

1,800

1,800
2,500
2,500
3,000

Elevation Client:
GOVERNMENT OF UGANDA
1,500

1,500

1,500

1,500
Ministry of Health
Uganda Heart Institute
P.O BOX 37392, Kampala-

floor finish level MINISTRY OF HEALTH


Uganda

Heavy duty roller shutter with solid core flush doors to internal Project:
Aluminium glazed window ditto ditto ditto REVIEW OF ARCHITECTURAL, ENGINEERING
operating gear rooms and bathrooms/stores resp.
DESIGN AND SUPERVISION FOR CIVIL
WORKS, MEDICAL EQUIPMENT AND
Level HOSPITAL FURNITURE EQUIPPING OF THE
PROPOSED 250 BEDS UHI FACILITY
W/Shop Gen. House W/Shop Gen. House W/Shop Gen. House W/Shop W/Shop W/Shop
Location Location:

Quantity 5 3 2 8 2 1 2 Plot 18-24, Naguru Avenue, Nakawa


Division, Kampala District

GATES Drawing Title:

Mark D-1 D-2 D-3 D-4 W-1 W-2


5,500
3,500 1,000 800
beam soffit
1,000 600 Job No.: Dwg Ref.

Scale: Revision No.

Date:

1,200
1,200
Drawn by:
2,400
2,400
2,749

2,400

Elevation Checked by: Arch. Rubongoya. P

DRAWING NO :

900
900
200

floor finish level


200

ditto solid core flush doors to internal


100x60x3mm framed with 25x2mm dia. infills at 200mm centersas gates ditto Aluminium glazed window Aluminium glazed window
rooms and bathrooms/stores resp.
Level
Main Gates Back Gate Sevice Gate Main Gates Back Gate Sevice Gate Main Gates Back Gate Main Gates Back Gate Sevice Gate Main Gates Back Gate Sevice Gate
Location
Quantity 4 2 1 1 2 2 10 6 5 1 5 2 1