EXHAUST

G R A N D

E03.01.01 MATCH LINE E03.01.01

E03.01.03 MATCH LINE E03.01.03

FFL. -10800
FFL. -10800 DRIVE WAY
STL - 11000
STL - 11000 CHAHAR BAG H
ISLAMABA D

OWNERS

BNP GROUP
PLOT #37, STREET #25, F-8/2,
ISLAMABAD, PAKISTAN
TEL: +92 51 111 87 36 39
email@bnp.com.pk

ARCHITECTS

arcop
6C, SUNSET COMMERCIAL STREET NO. 4,
DHA PHASE 4, KARACHI, PAKISTAN
TEL: +92 21 589 5196 / 97 FAX: +92 21 589 4894
arcop@arcopassociates.com

STRUCTURAL ENGINEERS:

MUSHTAQ & BILAL


PIT #304 NOOR ESTATE, SHARA-E-FAISAL,
FOR EQUIPMENT KARACHI, PAKISTAN

EXHST RM #3
ENTRY / EXIT TEL: +92 21 455 4153 FAX: +92 21 454 7692
mandb@multi.net.pk

B3-D-043
MECHANICAL/ELECTRICAL ENGINEERS
EX. ST-04
ST-04 S. MEHBOOB & COMPANY
SHAFT CONSULTING ENGINEERS

INTERIOR DESIGNERS

ARCHITECTURE / PLANNING
CITE' & DESIGN GROUP
79 I & T CENTRE G-8/1 ISLAMABAD.
PH. 2855431 - 2256997 www.citearchitecture.com

DRIVE WAY
43340.21 SQ.FTS. 265846.14 SQ.FTS.
4026.43 METERS MD1
MD1

24697.91 METERS LEGENDS

MD1
MD1
MD1
MD1

MD1
MD1
LOAD TAKE OFF
PANEL ROOM
LOBBY
CLIENT TRANSFORMER
EQUIPMENTs ENTRY / EXIT H.T ROOM ROOM
EXHAUST AIR DUCT

75 DEEP TRENCHDG-01 CORRIDOR


2000kVA
PHASE-01 CLIENT
MD1
MD1 H.T ROOM TRANSFORMER RM-07
RM SERVICE
PLANT ROOM B3-D-241 PASSAGE
TRANSFORMER
PHASE 2 1200x1200x1200 AIR INTAKE AIR INTAKE RM ELECTRICAL
ELECTRICAL RM-03
RM-05
EXHAUST AIR DUCT

DG-01 B3-D-241
2000kVA DRAIN SUMP ROOMROOM RM-01
PHASE-01 CH.W. PRIMARY PUMP
(PHASE - 1)
RM-04 RM-08
RM-02 RM-06
WATER COOLED
ELECTRICAL CHILLER (PH-1) CBS ROOM FOR TOWER B & C SERVICE PASSAGE
EXHAUST AIR DUCT

MD1
DG-01 MD1
2500kVA
PHASE-01
CBS CBS
ROOMROOM
FOR FOR RETAIL
RETAIL STAFF DORMITORY
FRESH AIR INTAKE

CBS ROOM FOR TOWER B & C JANITOR


RM-09
MD1
MD1
EXHAUST AIR DUCT

DG-01 CH.W.
2500kVA PRIMARY PUMP VANITY

PANEL IN WALL
PHASE-01
RM-10

LIFT LOBBY

LIFT LOBBY
KNOCK OUT

EXHAUST
STORE - 01

B3-D-300

B3-D-300
WATER COOLED
UP
EQUIPMENT ELECTRICAL CHILLER (PH-1)
MOVEMENT CORRIDOR BOH RM-11
EXHAUST AIR DUCT

GENSET SYNC.
DG-01 PANEL ROOM PL-01
2500kVA
PHASE-01
PLANT ROOM LIFT

SHOWER
TOILET
RM-12
STORE - 02
PHASE 1 STAIR #1
PIT PL-02
STAIR #1
SHAFT B3-C-ST-01 B3-C-ST-01
DG-01
EXHAUST AIR DUCT

2500kVA ABOVE
PHASE-01 CH.W.
PRIMARY PUMP

PANEL IN WALL
RM-13

EXHAUST
KNOCK OUT
STORE - 09
WATER COOLED
ELECTRICAL CHILLER (PH-1)
STORE - 03 STORES
B.O.H. STAFF DORMITORY
B.O.H. RM-14
EXHAUST AIR DUCT

DG-01
2500kVA
AND DRIVERS AREA AND DRIVERS AREA

CENTRAL PLANT ROOM FOR


PHASE-01

RM-21 RM-17
RM-19

TOWERS B & C
DG-01
RM-22 RM-20
EXHAUST AIR DUCT

2500kVA MD1
MD1
STORE - 04 STORE - 05 STORE - 06 STORE - 07 STORE - 08 RM-18 RM-15
PHASE-01
JOCKEY PUMP

FEEDER
INTAKE OOM ELECTRIC PUMP
STORE RM-16
EXHAUST AIR DUCT

DG-01 DIESEL PUMP


2500kVA
PHASE-01
DAY TANK
(DIESEL)

FEEDER INTAKE ROOM


EXHAUST AIR DUCT

DG-01
2500kVA
1200x1200x1200
DRAIN SUMP FFL. -10800
FFL. -10800
MD1
MD1
STL - 11000
PHASE-01
STL - 11000
VSD ROOM
CHANNEL GRATING (TYP.) (FOR FANS)

MD1
EXHAUST AIR DUCT

MD1 IESCO
FEEDER ROOMS (4 NOS.)
DG-01
2500kVA AT PL2
PHASE-01
DIESEL PUMP HOT WATER
200 DEEP
STATION HOT WATER
TRENCH RE CIRCULATING REV DESCRIPTION DATE DRAWN CH'CK'D
1200x1200x1200 PUMPS
DRAIN SUMP PUMPS PROJECT

FA RM FA RM #3
SEPTIC TANK ST-01 B2-D-050 B2-D-051 GRAND HYATT DEVELOPMENT
ONE CONSTITUTION AVENUE
ISLAMABAD, PAKISTAN

PROJECT STATUS

CONSTRUCTION DRAWINGS

E03.01.03

E03.01.04
KEY PLAN

N
E

MATCH LINE

MATCH LINE
G A J
D
F
K B C

E03.01.03

E03.01.04
DRAWN BY FILE NAME
R.A.S
JOB NO SCALE DATE PRINTED
1:250 JAN. 2022
DRG TITLE:
SYSTEM-I LAYOUT
FOR BASEMENT-02
(PART-III)
DRG NO REV

E03.01.03