0.5% SLOPE
0.5% SLOPE
0.
PE 5 % PE
O O
SL
SL
O SL New Al Falah PROJECT LOCATION
5% PE 5%
0. 0.
0.5% SLOPE
0.5% SLOPE
0. 0.
5% PE 5%
SL O SL
O SL O
PE 5% PE
0.
Ø 100mm GI RISER
PIPE (T/B)
0.5% SLOPE
RAMP SLOPE
1:12
THRUST
BLOCK
THRUST
Ø 160mm U/G HDPE PIPE (SDR9)
BLOCK
BOP:- 290@0.00 LEVEL
-0.206
UP
THRUST
BLOCK
3% slope
3% slope
3% slope
3% slope
3% slope
3% slope
3% slope
-0.206
B4-FF-VC-01
1
+6.972 m +6.972 m
APEX LEVEL APEX LEVEL
800x800
MANHOLE
800x800
MANHOLE
B4-FH-01 THRUST
BLOCK
EGDE FOOR
3% slope
3% slope
3% slope
3% slope
3% slope
3% slope
3% slope
PE
0.5% SLOPE
0.5 O
% SL
SL 5%
OPE 0.
10W 10F
10C 10S
0092
EARTHING PIT
TO BE RELOCATED
0525
EXISTING SOAKAWAY
EXISTING ROAD
EXISTING ROAD
TANK TO BE RELOCATED
RIDGE LINE RIDGE LINE
EGDE FOOR
EGDE FOOR
BATTERY
E +5.85 SSL
MOOR YRETTAB
LFF 03.0+
0092
30 -
LFF 03.0+
SA
EARTHING PIT
0525
Project :
TO BE RELOCATED
APOLLO 6 DATA CENTER
00131
00641
-0.206
C
ROOM
E
OP
SL
LFF 03.0+
0.
%
5%
20 - MOOR
EARTHING PIT
YRETTAB
10W 10F
0.5
10C 10S
Client :
0092
3
SL
TO BE RELOCATED 2175.40 O
PE
1275.30
0525
POD 7
B
LFF 03.0+
10 - MOOR
YRETTAB
10W 10F
10C 10S
0092
1
EGDE FOOR
THRUST THRUST
THRUST
R BLOCK BLOCK
BLOCK
DISMANTLING UP Design & Build Contractor
FLANGE B4-FH-04
THRUST UP
BLOCK CONCRETE CONCRETE
ENCASEMENT ENCASEMENT
Drawing Title :
DN BOP:- 1200@0.00 LEVEL BOP:- 1200@0.00 LEVEL DN BOP:- 1200@0.00 LEVEL
Ø 225mm U/G HDPE PIPE (SDR9) Ø 225mm U/G HDPE PIPE (SDR9) Ø 225mm U/G HDPE PIPE (SDR9) APOLLO 4 POD 7
THRUST
BLOCK THRUST RELOCATION OF EXISTING SERVICES
BLOCK
Designed Drawn Checked Scale Date
HWI-APO4BR-GE-LLD-0002 01 00