QUARTERLY SELF-MONITORING REPORT
DENR Permits/Licenses/Clearances
Environmental
Permits Date of Issue Expiry Date
Laws
A/C No. LC-02b-008-00024 11.Mar. 2018
P.D 984
PO No.
ECC 1 ECC-R4A-1304-0264 24.May 2013
PD 1586 ECC 2 N/A
ECC 3 N/A
DENR
Registry ID
GR-04-58-0340 07.Feb.2014
CCO Registry N/A
RA 6969 Importer
Clearance No
N/A
Permit to
Transport
N/A
A/C No.
RA 8749
PO No. With ongoing application
Operation
Operating hours/day Operating days/week # of shift/day
24 hrs/day 7 days/week
Maximum 720 hrs/month 30 days/month 3 shift /day
2160 hrs/quarter 90 days/quarter
Operation/Production/Capacity:
Average Daily
1500.00 Total Output this Quarter 135000.00
Production Output
Total Water Consumption Total Electric
this Quarter (cubic 108.00 Consumption this Quarter 45,000 kwh
meters) (KWH)
Please use additional sheet/s if necessary
2
MODULE 2: RA 6969
3
For producers: N/A
Average Daily
Total Output this Quarter
Production Output
Quantity of Stock Quantity of Stock
Inventory (Start of Inventory (End of
Quarter) Quarter)
Name of Buyer Quantity Date of Purchase
Not Applicable Not Applicable Not Applicable
NONE
Other Information:
Manner of handling storage on-site Treatment on-site
hazardous wastes storage off-site Treatment off-site
Chemical Substitute Yes (please attach copy if not submitted/included in previous report/s or had been revised)
Plan No
4
B. Hazardous Wastes Generator
HW Generation:
Remaining HW from
HW HW Generated
HW No. HW Class HW Nature Previous Report
Cataloguing
Quantity Unit Quantity Unit
Waste Storage, Treatment and Disposal: (Please fill-up one table per HW) N/A
HW No.: 110l (used oil, Rags with Oil and Fuel
Name: On Site
Storage
Method: with proper containment and labelling
ID: - Name:
Transporter
Date:
ID: - Name:
Treater
Method: Date:
ID: - Name:
Disposal
Date: Date:
HW No.: D49
HW Details Qty of HW Treated: 5 Unit: pcs.
TSD Location:
Name:
Storage Method: with proper containment and labelling
ID: - Name:
Transporter
Date:
ID: - Name:
Treater
Method: Date:
ID: - Name:
Disposal
Date: Date:
5
On-Site Self Inspection of Storage Area:
Corrective Action Taken
Date Conducted Premises/Area Inspected Findings & Observations
(if any)
in good condition
July 31, 2020 STORAGE AREA NONE
in good condition
Aug. 14, 2020 STORAGE AREA NONE
Type of
Transport Storage Time Table
Wastes Date of
HW Number Permit/Date Valid until Quantity Container/ for
Generator Transport
of Issue # of Treatment
containers
Residual Wastes Generated from the Treatment and/or Recycling Operation: N/A
Process by Type of
Type of which the Storage Disposal Time Table for
HW Number Quantity
Wastes Wastes is Container/ Option Disposal
Generated # of containers
6
MODULE 3: P.D. 984 (Water Pollution)
New/Additional
Investments in WTP
(Description)
Cost of New/Add
Investments
7
Detailed Report of Wastewater Characteristics for Conventional Pollutants
Outlet No. LLDA Jurisdiction
8
Detailed Report of Wastewater Characteristics for Other Pollutants
Outlet No. LLDA Jurisdiction
9
MODULE 4: R.A. 8749 (Air Pollution)
Summary of APSE/APCF
Process Equipment Location # of hrs of operations
Driveway
24 hrs/day
1.6000 gallons UGT for Diesel
720 hrs./month
2160 hrs./quarter
24 hrs/day
2. 6000 gallons UGT for Premium Diesel
720 hrs./month
Driveway 2160 hrs./quarter
24 hrs/day
3. 6000 gallons UGT for Unleaded Diesel
720 hrs./month
Driveway 2160 hrs./quarter
10
Detailed Report of Air Emission Characteristics
Description/Location
of PCF
________ ________ ________ ________
Flow Rate CO NOx Particulates (name) (name) (name) (name)
DATE
(Ncm/day) (mg/Ncm) (mg/Ncm) (mg/Ncm)
(mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm)
11
MODULE 5: P.D. 1586
12
Other ECC Conditions
Status of Compliance
ECC Condition/s Actions Taken
Yes No
I. OPERATION PHASE
1. The ECC covers the operation of Gasoline no expansion from the
Refilling Station. Which consist of four (4) existing operation
Underground Storage Tank, with capacity
of 22000 liters each within the total area of
300 square meters. Any Modification from
the approved project scope shall be
officially relayed to this office for its
information, evaluation and approved;
Our company comply
2.The proponent shall insure that the in the mitigating
commitment appropriate mitigating measure measures contained in
and monitoring requirements especially those the EMMoP)
contain in EMMoP in EIA reports , its Environmental
modification and additional information as Management Plan Shall
approved by the DENR during the EIA report be Properly
shall be institute and strictly implemented implemented during
throughout the project implementation and after the project
development.
Undertake and
continuing information,
education and
3. Undertake the continuing IEC program to
Communication (IEC)
explain to stakeholders the final approved
Program. We Already
EMMoP and the conditions in the ECC as
have done it during our
well as an update of project status
construction period,
including any significant changes on the
and we don’t encounter
EMMoP and overall performance against
problem in the
the ECC
construction phase that
will affect the
environment.
4. That the project proponent shall allow In case of inspection,
DENR –EMB personnel with proper inform our Supervisor
identification card and Travel/ mission or any personnel to tour
order to conduct inspection/monitoring in the inspector with
the entire premises without prior notice to proper Identification
oversee compliance to ECC Conditions card.
13
the DENR-EMB – Mainland, for approval, compliance.
in case the project proponent cannot
comply with with any conditions for
technical reasons.
9. That in case of abandonment, the project To comply in case of
proponent shall inform this office within abandoning the site
thirty (30) days before abandonment and
restore the site to its original conditions or
provide safety protective purposes and
prevents adverse environmental impacts.
14
per month Quarter
Average Quantity of .10 cum/month Total Quantity of Solid .30 cum/quarter
Solid Wastes Collected Wastes Collected this
per month Quarter
Entity in charge of Municipal Garbage Collector-Municipality of Teresa, Rizal going to
collecting solid wastes Municipal/ Provincial Sanitary Landfill of Rodrigues, Rizal.
Brief Description of
Solid Waste
Solid wastes generated in our station are commonly papers, plastics, tissues,
Management Plan (e.g.,
plastic bottle and newspaper.
waste reduction,
segregation, recycling)
MODULE 6: OTHERS
SUBSCRIBED AND SWORN before me, a Notary Public, this ________ day of
__________________2020, affiants are exhibiting to me their Community Tax
Receipts:
15
Name CTR No. Issued at Issued on
_____________________ _____________ _______________ ______________
_____________________ _____________ _______________ ______________
16