Professional Documents
Culture Documents
Training Needs Assessment Survey Questionnaire for Officials from Projects/Implementing Offices
Capacity Development Resource Centre
Date: ……………………………..
Namaskar!
Capacity Development Resource Center (CDRC) in partnership with ADB/NRM has been
providing capacity development trainings to EA/IA’s staff working in ADB funded projects since
November 2015. The information on trainings conducted by CDRC and their brief contents is
provided as annex to this questionnaire. The purpose of this questionnaire is to identify training
needs of officials working under ADB assisted projects/implementing agencies with a view to
provide appropriate capacity development training courses by introducing additional courses, and
revision./improvement of the existing CDRC courses. CDRC kindly requests you to provide
information by filling the questionnaire. Such information will remain confidential and will be
used only for TNA purpose. Thank you!
1. …………………………………………………………….
1
Training Needs Assessment Survey Questionnaire
2. ………………………………………………………
3. ………………………………………………………
4. ………………………………………………………
j. What are the problems that you face in completing task/functions that you are assigned?
1. …………………………………………
2. …………………………………………
3. …………………………………………
4. ………………………………………….
5. ………………………………………….
k. Do you think any capacity development program is needed to redress the problems that you
mentioned?
Yes No
l. If you require training to improve your major tasks/functions, what are your preferred areas
among the topics/contents listed below? Please tick mark (√) the selected training
topics/areas and suggest the contents that you would like to be included in the training
Training Topics/Areas Suggested Contents Training Methods
Note: please refer attached appendix For example,
for information on contents and Classroom/online
themes that could be covered under presentation, Clinics.
each training. Field visit , case studies.
exercises, experience
sharing, etc.
Procurement
Procurement of Works
Procurement of Consulting
Service
Procurement of Plant
Procurement of Goods
Other Procurement topics
2
Training Needs Assessment Survey Questionnaire
Contract Management
Contract Management (based
on ADB –Works –Small SBD)
Contract Management ( based
on ADB –Works –Large SBD)
Social Safeguards
Basic Social Safeguards
Professional Social Safeguards
Environmental Safeguard
Basic Environmental
Safeguards
Professional Environmental
Safeguards
Gender Equity and Social Inclusion
Gender Equality And Social
Inclusion (GESI) Concepts
GESI Framework and
Requirements
Financial Management
Disbursement, Audit and ADB
Financial Requirements
CPD training (Disbursement
Online System)
Training on APFS preparation
and Audit
Project Management
Project Management
Project Management Tool
(MS-Project)
m. In addition to the above trainings, what other areas of trainings/refresher trainings you think
needs to be conducted to enhance your capacity to perform your project specific task?
1. ……………………………………………………….
2. …………………………………………………………
3
Training Needs Assessment Survey Questionnaire
3. ………………………………………………………..
4. ……………………………………………..………….
n. How comfortable do you feel with online registration if CDRC makes it mandatory for
enrolling in training programs?
…………………………………….……………………………………………………………
…………………………………………………………………………………………………
………………………………………………………………………………………………….
o. Your view (including any good and bad experiences) regarding on-line training (virtual).
......................................................................................................................................................
......................................................................................................................................................
......................................................................................................................................................
......................................................................................................................................................
......................................................................................................................................................
......................................................................................................................................................
Procurement of Works ADB’s New Procurement Framework: Policy, Regulations, Staff Instruction, and
Guidance Note
Procurement Procedures
Preparation of Bidding Document
Bid Opening, Evaluation and Contact Award
Procurement of Consultant Selection Methods/Types of Proposals
Preparation of EOI/RFP
Consulting Service
Evaluation of EOI/Proposals and Contract Award
4
Training Needs Assessment Survey Questionnaire
Procurement of Plant ADB’s New Procurement Framework: Policy, Regulations, Staff Instruction, and
Guidance Note
Preparation of Bidding Document
Bid Opening, Evaluation and Contact Award
Insurance, Securities, Price Adjustment and Functional Guarantee, Technical
Requirements, (major & minor items, deviations), Maintenance and Operating Cost
Procurement of Goods Provision of PPA and PPR
Procurement of Other Services
Procurement of Goods
Project Cycle : Method & Practices; Preparation of Specification & Cost Estimate; LC
and Incoterm
Contract Management GCC Provisions
Variation Order, Rate Revision, Extension of Time & Liquidated Damage
(based on ADB –Works
Contract Management Activities
–Small SBD) Price Adjustment
Contract: Claims and Disputes
Contract Management ( FIDIC Contract Documents: Introduction & Principles
FIDIC General Provisions and Responsibilities of the Main Participants
based on ADB –Works
Management of Project
–Large SBD) FIDIC Financial Clauses & Procedures; Risk, Force Majeure & Termination
Variation Order, Price Adjustment , Extension of Time
Claim Applications under FIDIC, MDB Conditions of Contract
Processing of Claims and Resolution Disputes
Basic Social Safeguards ADB’s Involuntary Resettlement Safeguards Principles
Social Risk Assessment, Classification and Categorization
ADB’s Indigenous People Safeguards Principles
Legal & Policy Framework
Inventory of loss
Social Impact Assessment including vulnerability assessment
Communication and consultation:
Professional Social Understanding gaps between ADB and GoN Requirements
Inventory of loss (IOL) & Defining Project Affected Persons (PAPs)
Safeguards
Stakeholder Analysis, Community Consultation & Communication Strategy
Meaning, Methods and Procedure of Social Impact Assessment(SIA)
Project Site Observation & Fieldwork
Assessment of Differential Impacts & Vulnerability
Livelihood and Income Restoration
Modelling Mitigation Measures and SIA Report
Valuation, Compensation & Preparation/Updating RP & Budgeting
Designing Enhancement Measures and Preparation IPP
Grievances Redress Mechanism (GRM) & Monitoring
Basic Environmental ADB’s Environmental Safeguards Policies and Principles
Environmental Risk Assessment, Environmental Impacts and Mitigation
Safeguards
Legal & Policy Framework
Professional Sustainable Development, Paradigm shift in environmental safeguard requirements
National Policy and Principles
Environmental
EMP provision in Tender Document and BOQ
Safeguards SEMP / CEMP and its elements
Risk Analysis and Impact Rating System developed by IFC
Automated safeguard monitoring
Gender Equality And Socialization, Gender and Exclusion
Concepts of Gender Equality and Social Inclusion
Social Inclusion (GESI)
Achievements and Challenges of ADB Assisted Projects in addressing GESI
Concepts
GESI Framework and GESI Mainstreaming Framework, Policy Analysis
GESI Mainstreaming in Institutions, Planning, Programming and Budgeting, Monitoring
Requirements and Reporting
ADB gender policy and strategy and mainstreaming GESI in project design,
5
Training Needs Assessment Survey Questionnaire