PERMOHONAN BAGI PEMERIKSAAN (RFI)

CADANGAN PEMBANGUNAN PERUMAHAN BERCAMPUR SEBAHAGIAN LOT 6967 DAN TANAH KERAJAAN DI
KAMPUNG CERANG GULING MUKIM ALUR LIMBAT, DAERAH MARANG, TERENGGANU DARUL IMAN.

Tarikh : No. RFI :


Disiplin Kerja : Kerja Struktur Arkitek Kerja Civil Kerja M & E
Pakej/Lokasi :

Kehadiran anda diperlukan untuk pemeriksaan mengikut jadual dibawah :

Tarikh/Masa : Kawasan :

Pemeriksaan berkaitan :

PERMOHONAN OLEH : PEMERIKSAAN OLEH :

KONTRAKTOR UTAMA : KONSULTAN :


Nama : Nama : Nama :
Tandatangan : Tandatangan : Tandatangan :
Tarikh : Tarikh : Tarikh :

Laporan Pemeriksaan

Memuaskan dan kerja boleh diteruskan ke tahap seterusnya


Tidak lulus kerana

Laporan Pemeriksaan Semula Pemeriksaan Oleh :

Semua komen dan kerja pembetulan telah dibuat pada :


Tarikh & Masa : KONSULTAN

Tindakan Pencegahan Untuk Menghindarkan Kejadian Semula

REKOD PENGESAHAN EDARAN


Borang & Senaraitanda Siap Pengesahan Oleh : MAKLUMAT TINDAKAN
Lukisan / NA
Foto / NA
Sijil / NA
Tarikh : NO FAIL :
FORM NO. :

REQUEST FOR REF NO :

INSPECTION DATE :

PAGE NO :

PROJECT TITLE :
CADANGAN PEMBANGUNAN PERUMAHAN BERCAMPUR SEBAHAGIAN
LOT 6997 DAN TANAH KERAJAAN DI KAMPUNG CERANG GULING MUKIM
ALUR LIMBAT, DAERAH MARANG, TERENGGANU DARUL IMAN.

We request permission to proceed with the following works.


Following of works are/will be ready for inspection at ______ a.m/p.m_____ (______day)
Works are intended to commence at _____ a.m/p.m______ (_____ day)
Location :

Type of work (NOTE : Include detail material, labour and plant, and number of delivery trucks to be used)

……………………………………………………………………………………………………………………………………………….

……………………………………………………………………………………………………………………………………………….

……………………………………………………………………………………………………………………………………………….

Received at ______ a.m/p.m on ______ Signed ___________


Inspected by _______ at ______ a.m/p.m on______ (______ day)

Inspection Report

1. Delete if not applicable a) Inspection passed. Contractor is allowed to proceed with the work.
b) Remedial works listed below to be completed and reinspection is required
c) Remedial works listed below to be her inspection required

2. Remential works to be completed :

…………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………….……………..

………………………………………………………………………………………………………………………………...

Request By Contractor Approved BY Consultant

Submitted by : …………………………….. Submitted by : ……………………………..

at ………….. a.m/p.m……………… at ………….. a.m/p.m………………