DRILLING LOG
NAMA PROYEK = DERMAGA TIPE BOR : Rotary drilling machine Remarks.
KLIEN = PT. PELINDO PROPERTY INDONESIA MULAI : 26 April 2016 UD = Undisturb Sample
LOKASI = PANTAI BOOM MARINA, BANYUWANGI MASTERBOR : HARNO SPT = SPT Test
Relative Density or
General Remarks
Thickness in m
Consistency
N-Value Blows/30 cm
Depth in m
N - Value
Scale in m
cm
Legend
Colour
Sample Code
Sample Code
Depth in m
Depth in m
15 cm
15 cm
15 cm
0 10 20 30 40 50
0.00 0.00 START OF BORING 0
TIMBUNAN
1.00 -1.00 ABU-ABU 1
PASIR KERIKIL
5.00 -5.00 5
VERY
6.00 -6.00 SPT -6.00 SPT 3 7 3 5 2 6
LOOSE TO
3 S/D 8 -6.50
LOOSE
7.00 -7.00 7
9.00 -9.00 9
PASIR HALUS
10.00 -10.00 -10.00 SPT 5 6 1 2 4 10
ABU-ABU -10.50
13.00 -13.00 13
15.00 -15.00 15
17.00 -17.00 17
END OF BORING
LABORATORIUM MEKANIKA TANAH & BATUAN
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK SIPIL DAN PERENCANAAN - ITS
Kampus ITS, Keputih Sukolilo Surabaya
Telp. 031 5994251 - 55 Psw. 1140,
Telp/Fax: 031 5928601, e-mail : tanah.its@gmail.com
DRILLING LOG
NAMA PROYEK = DERMAGA TIPE BOR : Rotary drilling machine Remarks.
KLIEN = PT. PELINDO PROPERTY INDONESIA MULAI : 28 April 2016 UD = Undisturb Sample
LOKASI = PANTAI BOOM MARINA, BANYUWANGI MASTERBOR : HARNO SPT = SPT Test
Relative Density or
General Remarks
Thickness in m
Consistency
N-Value Blows/30 cm
Depth in m
N - Value
Scale in m
cm
Legend
Colour
Sample Code
Sample Code
Depth in m
Depth in m
15 cm
15 cm
15 cm
0 10 20 30 40 50
0.00 0.00 START OF BORING 0
1.00 -1.00 1
VERY
PASIR BERBATU SPT = 50
DENSE
2.00 -2.00 -2.00 SPT 1 >50 2
-2.50
3.00 -3.00 3
7.00 -7.00 7
ABU-ABU
8.00 -8.00 GELAP -8.00 SPT 4 3 1 1 2 8
-8.50
11.00 -11.00 11
15.00 -15.00 15
17.00 -17.00 17
PASIR HALUS COKLAT
VERY SPT
18.00 -18.00 BERLANAU KEABU- -18.00 SPT 9 >50 13 23 10/2 CM 18
DENSE 46 S/D >50
KERAS ABUAN -18.50
19.00 -19.00 19
END OF BORING