You are on page 1of 10

DESAIN NOTE

PERHITUNGAN
PILE FOUNDATION BEARING CAPACITY

PAKET PEKERJAAN:
PERENCANAAN TEKNIK (DED)
JEMBATAN MOLINTOGUPO

KONSULTAN PERENCANA:
PT. KINGSTOM TEKNITAMA KONSULTAN

Alamat: Jln. Rusli Datau No. 103 Kel. Dulomo Kec. Kota Utara
Kota Gorontalo Provinsi Gorontalo
Project : Perencanaan Teknik (DED) Jembatan Molintogupo 2019 Allowable Bearing Capacity (kN)
0
0
Location : Jembatan Molintogupo - BH01 158
Subject : Pile Foundation Design / Abutment 02 5 984
1204
1476
10
1595
Design Criteria PILE DIMENSION (circular/rectangular/triangle) 1713
Req. Capacity = - kN Diameter = 0.6 m <------- CIRCULAR 15 1832

Depth (m)
Water level = 10.0 m Perimeter = 1.88 m 1951
Pile top elev = 1.5 m Elevation
25.614
= Sectional area = 0.28 m2 20
2070
SF(Friction) 2205
= 3
2511
SF(End Bearing) = 3 TYPE = DRIVEN (BORED/DRIVEN)
0.0 depth of soil investigation (+) 25 2833
Pile elev. Required = 19.0 m= Elev.= 6.614 3172
Pile top elev. Ultimate Friction capacity = 3308.1 kN 3529
30
=
Ultimate End bearing capacity 3206.3 kN 3885
Pile length Allowable capacity = 2171.5 kN
35
0 2000 4000 6000

DATA FRICTION END BEARING CAPACITY

gtotal Sect. Friction Parameters Friction Capacity End Bearing Par. End Bearing, kN
Clay or seffective Allowable
Depth (m) N-SPT Dv N' Classification kN/m length Clay, Cu Sand,
Sand ? kN/m2 Fc sz (kPa) Unit, kN/m
2
Cumul., kN Nc Nq Calculated Normalized Capacity, kN
3 (m) (kPa) Ff
0.0 - 1.00 0 0 sand 16 16.0 0.0 - - 0.8 16 13 0 - 60 271 271 0
Kerikil Pasiran Sedang
1.0 - 3.00 27 0.32 37 sand 16 48.0 1.5 - - 1.5 48 72 204 - 180 2443 271 158
3.0 - 5.00 28 0.64 32 sand 16 80.0 2.0 - - 1.5 54 81 509 - 180 2748 2443 984
5.0 - 7.00 39 0.98 39 Kerikil Pasiran Halus sand 17 114.0 2.0 - - 1.5 63 95 865 - 180 3206 2748 1204
7.0 - 9.00 42 1.32 38 sand 17 148.0 2.0 - - 1.5 63 95 1221 - 180 3206 3206 1476
9.0 - 11.00 45 1.46 39 sand 17 162.0 2.0 - - 1.5 63 95 1578 - 180 3206 3206 1595
Pasir Sangat Halus Kerikilan
11.0 - 13.00 37 1.6 31 sand 17 176.0 2.0 - - 1.5 63 95 1934 - 180 3206 3206 1713
13.0 - 15.00 44 1.74 36 sand 17 190.0 2.0 - - 1.5 63 95 2290 - 180 3206 3206 1832
15.0 - 17.00 48 1.88 38 sand 17 204.0 2.0 - - 1.5 63 95 2646 - 180 3206 3206 1951
Kerikil Pasiran Halus
17.0 - 19.00 46 2.02 35 sand 17 218.0 2.0 - - 1.5 63 95 3003 - 180 3206 3206 2070
19.0 - 21.00 50 2.18 37 sand 18 234.0 2.0 - - 1.5 72 108 3410 - 180 3664 3206 2205
21.0 - 23.00 52 2.36 37 sand 19 252.0 2.0 - - 1.5 81 122 3868 - 180 4122 3664 2511
23.0 - 25.00 45 2.56 31 Pasir Halus Kerikilan sand 20 272.0 2.0 - - 1.5 90 135 4377 - 180 4580 4122 2833
25.0 - 27.00 55 2.78 36 sand 21 294.0 2.0 - - 1.5 99 149 4937 - 180 5038 4580 3172
27.0 - 29.00 57 3.02 36 Kerikil Pasiran Halus sand 22 318.0 2.0 - - 1.5 108 162 5547 - 180 5497 5038 3529
29.0 - 31.00 60 3.26 36 Pasir Halus Kerikilan sand 22 342.0 2.0 - - 1.5 108 162 6158 - 180 5497 5497 3885

07a - Pile Foundation Bearing Cap - BH09+BH10.xls


GEOLOGIC DRILLING LOG
PROJECT :: PERENCANAAN
PEMBANGUNANJEMBATAN
BENDUNG MOLINTOGUPO
RANDANGAN, KAB. POHUWATO, PROV.
GROUND :-
GORONTALO
ELEV. BH. NO PELAKSANA BOR TEKNIK
RIG : YBM-1
LOCATION : BH.01 (ABUTMENT KIRI ALIRAN SUNGAI) DRILL MASTER : SUPRIANA
DATE : 6 - 10 November 2019 LOGGED BY : BARI UYA BH-01 PT. KINGSTOM
TEKNITAMA KONSULTAN
TOTAL DEPTH : 30 meter CHECK BY : HENDRY TRI WIBOWO, ST
COORDINATE GWL(m) : X = 518765 ; Y = 58461 GWL (M) : 10,0 M

SAMPLING SPT UNCONFINED COMPRESSION STRENGHT

CASING OD (mm)
POCKET PENETROMETER (KG/CM 2)
ELEVATION (M)

SYMBOLIC LOG

KETERANGAN
DESCRIPTION
BH. NO BH-01
DEPTH (M)

DEPTH (M)
SOIL TYPE
DRILLING

N VALUE
BEFORE

CASING
DATE

TYPE

N1

N2

N3
0 10 20 30 40 50 60 70

0.00
0
Kerikil Pasiran sedang, berwarna abu-
PASIRAN
KERIKIL

SEDANG

CS
abu, densitas relatif tergolong lepas -

Φ 89 mm
1.00
agak lepas, perbandingan kerikil : pasir 1.50
sedang berkisar 55 : 45.

SPT
2.00 10 12 15 27
2.00 2
06/11/2019

CS
KERIKIL PASIRAN HALUS

3.00
3.50

SPT
Kerikil pasiran halus, berwarna abu- 4.00 10 13 15 28
4.00 4
abu, densitas relatif tergolong lepas -
agak padat, perbandingan kerikil : pasir

CS
5.00 halus berkisar 65 : 35.
5.50

SPT
6.00 14 17 22 39
6.00 6

CS
7.00
PASIR SANGAT HALUS

7.50

SPT CS UDS CS SPT


8.00 15 20 22 42
8.00 8
KERIKILAN
07/11/2019

Pasir sangat halus kerikilan, 8.50

berwarna abu - abu, densitas padat, 9.00


9.00
perbandingan 65:35.
9.50

10.00 18 20 25 45 GWL= 10m


10.00 10
CS

11.00
11.50
SPT

12.00 15 17 20 37
12.00 12
CS

13.00
KERIKIL PASIRAN HALUS

13.50
SPT

14.00 17 22 22 44
14.00 14
Kerikil pasiran halus, berwarna abu-
08/11/2019

abu, densitas relatif tergolong lepas -


CS

15.00 agak padat, perbandingan kerikil : pasir


halus berkisar 65 : 35. 15.50
SPT

16.00 17 23 25 48
16.00 16
CS

17.00
17.50
SPT

18.00 19 20 26 46
18.00 18
CS

19.00
19.00
SPT UDS

19.50

20.00 20 23 27 50
20.00 20
09/11/2019

PASIR HALUS KERIKILAN

CS

21.00
21.50
Pasir halus kerikilan, berwarna abu-
SPT

22.00 19 28 24 52
22.00 abu, densitas padat, perbandingan pasir 22
halus : kerikil berkisar 75 : 25.
CS

23.00
23.50
SPT

24.00 14 17 28 45
24.00 24
CS

25.00
25.50
KERIKIL PASIRAN

SPT

26.00 22 26 29 55
26.00 26
Kerikil pasiran halus, berwarna abu-
10/11/2019

HALUS

abu, densitas relatif tergolong lepas -


CS

27.00 agak padat, perbandingan kerikil : pasir


halus berkisar 75 : 25. 27.50
SPT

28.00 25 27 30 57
28.00 28
CS
KERIKILA

Pasir halus kerikilan, berwarna abu- 29.00


29.00
HALUS
PASIR

SPT UDS

abu, densitas padat, perbandingan pasir


N

29.50

30.00 halus : kerikil berkisar 75 : 25.


30.00 23 29 32 61
30

Keterangan :
CS : Core Sample (Disturbed Sample)
UDS :Undisturbed soil sample
SPT : Standard Penetration Test .
Project : Perencanaan Teknik (DED) Jembatan Molintogupo 2019 Allowable Bearing Capacity (kN)
0
0
Location : Jembatan Molintogupo - BH02 158
Subject : Pile Foundation Design / Abutmen 01 5 984
1204
1476
10
1595
Design Criteria PILE DIMENSION (circular/rectangular/triangle) 1713
Req. Capacity = - kN Diameter = 0.6 m <------- CIRCULAR 15 1832

Depth (m)
Water level = 8.0 m Perimeter = 1.88 m 1951
Pile top elev = 1.5 m Elevation
25.614
= Sectional area = 0.28 m2 20
2070
SF(Friction) 2205
= 3
2511
SF(End Bearing) = 3 TYPE = DRIVEN (BORED/DRIVEN)
0.0 depth of soil investigation (+) 25 2833
Pile elev. Required = 19.0 m= Elev.= 6.614 3172
Pile top elev. Ultimate Friction capacity = 3308.1 kN 3529
30
=
Ultimate End bearing capacity 3206.3 kN 3885
Pile length Allowable capacity = 2171.5 kN
35
0 2000 4000 6000

DATA FRICTION END BEARING CAPACITY

gtotal Sect. Friction Parameters Friction Capacity End Bearing Par. End Bearing, kN
Clay or seffective Allowable
Depth (m) N-SPT Dv N' Classification kN/m length Clay, Cu Sand,
Sand ? kN/m2 Fc sz (kPa) Unit, kN/m
2
Cumul., kN Nc Nq Calculated Normalized Capacity, kN
3 (m) (kPa) Ff
0.0 - 1.00 0 0 sand 16 16.0 0.0 - - 0.8 16 13 0 - 60 271 271 0
Kerikil Pasiran Sedang
1.0 - 3.00 46 0.32 63.61 sand 16 48.0 1.5 - - 1.5 48 72 204 - 180 2443 271 158
3.0 - 5.00 41 0.64 47.19 Kerikil Pasiran Halus sand 16 80.0 2.0 - - 1.5 54 81 509 - 180 2748 2443 984
5.0 - 7.00 43 0.98 43.37 Pasir Sedang Kerikilan sand 17 114.0 2.0 - - 1.5 63 95 865 - 180 3206 2748 1204
7.0 - 9.00 52 1.12 50.12 Kerikil Pasiran Sedang sand 17 128.0 2.0 - - 1.5 63 95 1221 - 180 3206 3206 1476
9.0 - 11.00 52 1.26 48.07 Pasir Sedang Kerikilan sand 17 142.0 2.0 - - 1.5 63 95 1578 - 180 3206 3206 1595
11.0 - 13.00 55 1.4 48.91 Kerikil Pasiran Sedang sand 17 156.0 2.0 - - 1.5 63 95 1934 - 180 3206 3206 1713
13.0 - 15.00 53 1.54 45.44 Pasir Sedang Kerikilan sand 17 170.0 2.0 - - 1.5 63 95 2290 - 180 3206 3206 1832
15.0 - 17.00 56 1.68 46.39 Kerikil Pasiran Sedang sand 17 184.0 2.0 - - 1.5 63 95 2646 - 180 3206 3206 1951
17.0 - 19.00 48 1.82 38.47 sand 17 198.0 2.0 - - 1.5 63 95 3003 - 180 3206 3206 2070
19.0 - 21.00 55 1.98 42.53 sand 18 214.0 2.0 - - 1.5 72 108 3410 - 180 3664 3206 2205
21.0 - 23.00 48 2.16 35.72 Pasir Sedang Kerikilan sand 19 232.0 2.0 - - 1.5 81 122 3868 - 180 4122 3664 2511
23.0 - 25.00 55 2.36 39.31 sand 20 252.0 2.0 - - 1.5 90 135 4377 - 180 4580 4122 2833
25.0 - 27.00 60 2.58 41.09 sand 21 274.0 2.0 - - 1.5 99 149 4937 - 180 5038 4580 3172
27.0 - 29.00 61 2.82 39.96 Kerikil Sedang Pasiran sand 22 298.0 2.0 - - 1.5 108 162 5547 - 180 5497 5038 3529
29.0 - 31.00 62 3.06 38.92 Pasir Sedang Kerikilan sand 22 322.0 2.0 - - 1.5 108 162 6158 - 180 5497 5497 3885

07a - Pile Foundation Bearing Cap - BH09+BH10.xls


GEOLOGIC DRILLING LOG
PROJECT :: PERENCANAAN
PEMBANGUNANJEMBATAN
BENDUNG MOLINTOGUPO
RANDANGAN, KAB. POHUWATO,GROUND
PROV. GORONTALO
ELEV. : - BH. NO PELAKSANA BOR TEKNIK
RIG : YBM-1
LOCATION : BH.02 (ABUTMENT KANAN ALIRAN SUNGAI) DRILL MASTER : SUPRIATNA
DATE : 11 - 14 November 2019 LOGGED BY : BARI UYA BH-02 PT. KINGSTOM
TEKNITAMA KONSULTAN
TOTAL DEPTH : 30 meter CHECK BY : HENDRY TRI WIBOWO, ST
COORDINATE : X = 518741 ; Y = 58579 GWL (M) : 8,0 M
GWL(m)

SAMPLING SPT UNCONFINED COMPRESSION STRENGHT

CASING OD (mm)
POCKET PENETROMETER (KG/CM2)
ELEVATION (M)

SYMBOLIC LOG

KETERANGAN
DESCRIPTION
BH-02
DEPTH (M)

DEPTH (M)
BH. NO
SOIL TYPE
DRILLING

N VALUE
BEFORE

CASING
DATE

TYPE

N1

N2

N3
0 10 20 30 40 50 60 70

0.00
0
PASIRAN

Kerikil Pasiran sedang, berwarna abu-abu,


KERIKIL

SEDANG

CS
Φ 89 mm

1.00 densitas relatif tergolong lepas - agak lepas,


1.50
perbandingan kerikil : pasir sedang berkisar 55 : 45.

SPT
2.00 17 24 22 46
2.00 2
PASIRAN

Kerikil pasiran halus, berwarna abu-abu, densitas


KERIKIL

CS
HALUS
11/11/2019

3.00
relatif tergolong lepas - agak padat, perbandingan 3.50
kerikil : pasir halus berkisar 65 : 35.

SPT
4.00 14 20 21 41
4.00 4

CS
5.00
PASIR SEDANG

5.50
KERIKILAN

SPT
6.00 11 18 25 43
6.00 Pasir Sedang kerikilan, berwarna abu - abu, 6
densitas padat, perbandingan 85:15.

CS
7.00
7.50
GWL= 8.0m

SPT
8.00 17 21 31 52
8.00 Kerikil pasiran sedang, berwarna abu-abu, 8
Kerikila PASIRA
KERIKI

densitas padat, perbandingan kerikil : pasir sedang


CS
N
L

9.00
9.00 berkisar 65 : 35.
Pasir Sedang kerikilan, berwarna abu - abu,
SPT UDS
Sedang

9.50
Pasir

densitas padat, perbandingan 85:15. 10.00 19 25 27 52


10.00 10
12/11/2019

PASIRAN

Kerikil pasiran sedang, berwarna abu-abu,


KERIKIL

SEDANG

CS

11.00 densitas padat, perbandingan kerikil : pasir sedang


11.50
berkisar 65 : 35.
SPT

12.00 17 23 32 55
12.00 12
Pasir Sedang kerikilan, berwarna abu - abu,
Kerikila
Sedang
Pasir

densitas padat, perbandingan 85:15.


CS

13.00
13.50
PASIRAN

SPT

Kerikil pasiran sedang, berwarna abu-abu,


KERIKIL

SEDANG

14.00 13 25 28 53
14.00 14
densitas padat, perbandingan kerikil : pasir sedang
berkisar 65 : 35.
CS

15.00
15.50
SPT

16.00 11 17 39 56
16.00 16
CS

17.00
17.50
SPT

18.00 16 11 37 48
18.00 18
13/11/2019

CS

19.00
19.00
SPT UDS

19.50

20.00 18 18 37 55
PASIR SEDANG KERIKILAN

20.00 20
CS

21.00
Pasir sedang kerikilan, berwarna abu-abu, densitas 21.50

padat, perbandingan pasir halus : kerikil berkisar 75 :


SPT

22.00 16 21 27 48
22.00 22
25.
CS

23.00
23.50
SPT

24.00 21 23 32 55
24.00 24
CS

25.00
25.50
14/11/2019

SPT

26.00 10 25 37 62
26.00 26
CS

27.00
27.50
SPT

28.00 17 21 39 60
28.00 28
Kerikil pasiran sedang, warna abu-abu, padat,
pasiran
sedang
Kerikil

CS

perbandingan 55 : 45. 29.00


29.00
Pasir Sedang kerikilan, berwarna abu - abu,
SPT UDS
kerikila
sedang

29.50
Pasir

30.00 densitas padat, perbandingan 85:15. 30.00 23 23 38 61


30

Keterangan :
CS : Core Sample (Disturbed Sample)
UDS :Undisturbed soil sample
SPT : Standard Penetration Test .
Project : Perencanaan Teknik (DED) Jembatan Molintogupo 2019 Allowable Bearing Capacity (kN)
0
0
Location : Jembatan Molintogupo - BH03 59
Subject : Pile Foundation Design / Pier 01 5 333
416
1000
10
1357
Design Criteria PILE DIMENSION (circular/rectangular/triangle) 1560
Req. Capacity = - kN Diameter = 0.6 m <------- CIRCULAR 15 1679

Depth (m)
Water level = 0.5 m Perimeter = 1.88 m 1798
Pile top elev = 1.5 m Elevation
23.614
= Sectional area = 0.28 m2 20
1916
SF(Friction) 2052
= 3
2358
SF(End Bearing) = 3 TYPE = DRIVEN (BORED/DRIVEN)
0.0 depth of soil investigation (+) 25 2680
Pile elev. Required = 19.0 m Elev.= 4.614 3019
Pile top elev. Ultimate Friction capacity = 2848.4 kN 3375
30
=
Ultimate End bearing capacity 3206.3 kN 3732
Pile length Allowable capacity = 2018.2 kN
35
0 1000 2000 3000 4000

DATA FRICTION END BEARING CAPACITY

gtotal Sect. Friction Parameters Friction Capacity End Bearing Par. End Bearing, kN
Clay or seffective Allowable
Depth (m) N-SPT Dv N' Classification kN/m length Clay, Cu Sand,
Sand ? kN/m2 Fc sz (kPa) Unit, kN/m
2
Cumul., kN Nc Nq Calculated Normalized Capacity, kN
3 (m) (kPa) Ff
0.0 - 1.00 0 0 sand 16 6.0 0.0 - - 0.8 6 5 0 - 60 102 102 0
Kerikil Pasiran Sedang
1.0 - 3.00 32 0.12 54.75 sand 16 18.0 1.5 - - 1.5 18 27 76 - 180 916 102 59
3.0 - 5.00 15 0.24 22.19 sand 16 30.0 2.0 - - 1 28.8 29 185 - 100 814 814 333
Kerikil Pasiran Halus
5.0 - 7.00 30 0.38 39.76 sand 17 44.0 2.0 - - 1.5 44 66 434 - 180 2239 814 416
7.0 - 9.00 40 0.52 48.82 sand 17 58.0 2.0 - - 1.5 58 87 762 - 180 2952 2239 1000
9.0 - 11.00 42 0.66 47.91 sand 17 72.0 2.0 - - 1.5 63 95 1118 - 180 3206 2952 1357
11.0 - 13.00 51 0.8 54.90 sand 17 86.0 2.0 - - 1.5 63 95 1474 - 180 3206 3206 1560
13.0 - 15.00 55 0.94 56.24 sand 17 100.0 2.0 - - 1.5 63 95 1830 - 180 3206 3206 1679
15.0 - 17.00 52 1.08 50.75 sand 17 114.0 2.0 - - 1.5 63 95 2187 - 180 3206 3206 1798
17.0 - 19.00 55 1.22 51.44 sand 17 128.0 2.0 - - 1.5 63 95 2543 - 180 3206 3206 1916
19.0 - 21.00 55 1.38 49.17 sand 18 144.0 2.0 - - 1.5 72 108 2950 - 180 3664 3206 2052
21.0 - 23.00 52 1.56 44.36 sand 19 162.0 2.0 - - 1.5 81 122 3408 - 180 4122 3664 2358
23.0 - 25.00 58 1.76 47.14 sand 20 182.0 2.0 - - 1.5 90 135 3917 - 180 4580 4122 2680
25.0 - 27.00 60 1.98 46.40 sand 21 204.0 2.0 - - 1.5 99 149 4477 - 180 5038 4580 3019
27.0 - 29.00 60 2.22 44.11 sand 22 228.0 2.0 - - 1.5 108 162 5088 - 180 5497 5038 3375
29.0 - 31.00 60 2.46 42.05 sand 22 252.0 2.0 - - 1.5 108 162 5698 - 180 5497 5497 3732

07a - Pile Foundation Bearing Cap - BH09+BH10.xls


GEOLOGIC DRILLING LOG
PROJECT :: PERENCANAAN
PEMBANGUNANJEMBATAN
BENDUNG MOLINTOGUPO
RANDANGAN, KAB. POHUWATO,GROUND
PROV. GORONTALO
ELEV. : - BH. NO PELAKSANA BOR TEKNIK
RIG : YBM-1
LOCATION : BH.03 (TENGAH ALIRAN SUNGAI BONE / PIER) DRILL MASTER : SUPRIATNA
DATE : 21 - 24 November 2019 LOGGED BY : BARI UYA BH-03 PT. KINGSTOM
TEKNITAMA KONSULTAN
TOTAL DEPTH : 30 meter CHECK BY : HENDRY TRI WIBOWO, ST
COORDINATE : x = 518820 ; y = 58566 GWL (M) : 0,50 M
GWL(m)

SAMPLING SPT UNCONFINED COMPRESSION STRENGHT

CASING OD (mm)
POCKET PENETROMETER (KG/CM 2)
ELEVATION (M)

SYMBOLIC LOG

KETERANGAN
DESCRIPTION
BH. NO BH-03
DEPTH (M)

DEPTH (M)
SOIL TYPE
DRILLING

N VALUE
BEFORE

CASING
DATE

TYPE

N1

N2

N3
0 10 20 30 40 50 60 70

0.00
0 GW
PASIRAN

Kerikil Pasiran sedang, berwarna abu-abu, densitas L=0.


KERIKIL

SEDANG

CS
Φ 89 mm

1.00 relatif tergolong lepas - agak lepas, perbandingan


kerikil : pasir sedang berkisar 75 : 25. 1.50 5m

SPT
2.00 12 15 17 32
2.00 2
PASIR HALUS

CS
KERIKILAN

3.00
21/11/2019

Pasir Halus kerikilan, berwarna abu-abu, densitas


3.50
relatif tergolong padat, perbandingan pasir halus :

SPT
4.00 7 6 9 15
4.00 kerikil berkisar 85 : 15. 4

CS
5.00
5.50
PASIR SEDANG KERIKILAN

SPT
6.00 11 13 17 30
6.00 6

CS
7.00 Pasir Sedang kerikilan, berwarna abu - abu,
7.50
densitas padat, kerikil berukuran 5-8 cm, well

SPT
8.00 13 18 22 40
8.00 rounded , perbandingan 60:40. 8

CS
9.00
9.00

SPT UDS
9.50

10.00 17 17 25 42
10.00 10
22/11/2019

CS
KERIKIL PASIRAN SEDANG

11.00
11.50
SPT

12.00 17 13 38 51
12.00 12
Kerikil pasiran sedang, berwarna abu-abu, densitas
padat, perbandingan kerikil : pasir sedang berkisar 65
CS

13.00
: 35. 13.50
SPT

14.00 13 18 37 55
14.00 14
CS

15.00
15.50
SPT

16.00 11 13 39 52
16.00 16
CS

17.00
PASIR SEDANG KERIKILAN

17.50
SPT

18.00 16 18 37 55
18.00 18
23/11/2019

Pasir sedang kerikilan, berwarna abu-abu, densitas


CS

19.00
19.00 padat, perbandingan pasir halus : kerikil berkisar 75 :
SPT UDS

19.50
25.
20.00 18 12 43 55
20.00 20
CS

21.00
21.50
SPT

22.00 16 21 31 52
22.00 22
CS

23.00
PASIRAN
KERIKIL

SEDANG

23.50
Kerikil pasiran sedang, warna abu-abu, padat,
SPT

24.00 21 26 32 58
24.00 perbandingan 55 : 45. 24
CS

25.00
25.50
PASIR SEDANG
24/11/2019

SPT

10 29 32 61
KERIKILAN

26.00
26.00 26
Pasir Sedang kerikilan, berwarna abu - abu,
densitas padat, perbandingan 85:15.
CS

27.00
27.50
SPT

28.00 12 21 39 60
28.00 28
PASIRAN
KERIKIL

CS
SEDANG

Kerikil pasiran sedang, warna abu-abu, padat, 29.00


29.00
perbandingan 55 : 45.
SPT UDS

29.50

30.00 30.00 21 25 39 64
30

Keterangan :
CS : Core Sample (Disturbed Sample)
UDS :Undisturbed soil sample
SPT : Standard Penetration Test .
Table 8.1 - Pile design parameters for non-cohessive soil
(BMS6-M.8E - Bridge Design Manual, 11 November 1992)

Condition of Soil Limiting depth/pile Ff Nq


Consistency N-SPT diameter ZL/d Driven Pile Bored Pile Driven Pile Bored Pile

Loose 0 - 10 6 0.8 0.3 60 25


Medium 10 - 30 8 1.0 0.5 100 60
Dense 30 - 50 15 1.5 0.8 180 100
Table 8.2 - Pile design parameters for cohessive soils
(BMS6-M.8E - Bridge Design Manual, 11 November 1992)

Condition of Soil Nominal Average


Remolding
Undrained Shear
Consistency N-SPT coefficients Fc
Strength, Cu (kPa)

exudes between
Very soft fingers 0 - 2 0 - 10 1.0
easily moulded
Soft with fingers 2 - 4 10 - 25 1.0
can be moulded 25 - 45 1.0
Firm with fingers by 4 - 8
strong pressure 45 - 50 1.0 - 0.95
50 - 60 0.95 - 0.8
cannot be moulded
Stiff with fingers 8 - 15 60 - 80 0.8 - 0.65
80 - 100 0.65 - 0.55
100 - 120 0.55 - 0.45
120 - 140 0.45 - 0.4
Very stiff brittle or tough 15 - 30 140 - 160 0.4 - 0.36
160 - 180 0.36 - 0.35
180 - 200 0.35 - 0.34
Hard hard > 30 > 200 0.34
Table 8.1 - Pile design parameters for non-cohessive soil
(BMS6-M.8E - Bridge Design Manual, 11 November 1992)

Condition of Soil Ff Nq
Limiting depth/pile
diameter ZL/d
Consistency N-SPT Driven Pile Bored Pile Driven PileBored Pile

0 6 0.8 0.3 60 25
1 6 0.8 0.3 60 25
2 6 0.8 0.3 60 25
3 6 0.8 0.3 60 25
4 6 0.8 0.3 60 25
Loose
5 6 0.8 0.3 60 25
6 6 0.8 0.3 60 25
7 6 0.8 0.3 60 25
8 6 0.8 0.3 60 25
9 6 0.8 0.3 60 25
10 8 1.0 0.5 100 60
11 8 1.0 0.5 100 60
12 8 1.0 0.5 100 60
13 8 1.0 0.5 100 60
14 8 1.0 0.5 100 60
15 8 1.0 0.5 100 60
16 8 1.0 0.5 100 60
17 8 1.0 0.5 100 60
18 8 1.0 0.5 100 60
19 8 1.0 0.5 100 60
Medium
20 8 1.0 0.5 100 60
21 8 1.0 0.5 100 60
22 8 1.0 0.5 100 60
23 8 1.0 0.5 100 60
24 8 1.0 0.5 100 60
25 8 1.0 0.5 100 60
26 8 1.0 0.5 100 60
27 8 1.0 0.5 100 60
28 8 1.0 0.5 100 60
29 8 1.0 0.5 100 60
30 15 1.5 0.8 180 100
31 15 1.5 0.8 180 100
32 15 1.5 0.8 180 100
33 15 1.5 0.8 180 100
34 15 1.5 0.8 180 100
35 15 1.5 0.8 180 100
36 15 1.5 0.8 180 100
37 15 1.5 0.8 180 100
38 15 1.5 0.8 180 100
39 15 1.5 0.8 180 100
Dense 40 15 1.5 0.8 180 100
41 15 1.5 0.8 180 100
42 15 1.5 0.8 180 100
43 15 1.5 0.8 180 100
44 15 1.5 0.8 180 100
45 15 1.5 0.8 180 100
46 15 1.5 0.8 180 100
47 15 1.5 0.8 180 100
48 15 1.5 0.8 180 100
49 15 1.5 0.8 180 100
50 15 1.5 0.8 180 100