SGSAM1
1. Introduction
A survey was carried out at SURAU AL-AMIN by our technical team and the site is
found to be suitable for our 2G & 3G system coverage.
We hereby propose for the possibilities doing the proposed work s requested by
Maxis. This document describes the technical issues involved.
2. Site Accessibility
Frequent movement of staff and workers is expected at the initial stage of site
preparations and equipment installation, testing and commissioning.
While at the operational phase, the site may be visited by maintenance staff
periodically. Hence, it is required that the site be accessible 24 hours.
TGBP Page 2 of 2
SURAU AL-AMIN
LRD : SGSAM1
State : CENTRAL
Surveyed By : KUMAR
RF :
Checked & Approved by (Maxis):
Signature
Date
Date
LRD : SGSAM1
State : CENTRAL
Contents
1. Photo
3. Site Layout
Proposed to
down the site
Proposed To and re-arrange
Relocate RRU Floor jumpers/RRU
Mounted Boom and DC power
turn all RRU facing cables and
front view CPRI cables to
insert inside
RRU Caging
SGSAM1
surrounding photo inside cabin
Date: 29-May-14
Attn: Pn Fauziah
Dear Madam,
Attached to this letter is the hard copy of the technical proposal including survey report sketches and Auto Cad
drawings for Maxis perusal.
Please kindly acknowledge receive of this document by signing on this letter. Your kind attention on this matter is
much appreciated.
Thank You.
Yours Sincerely,
Kumar
Name: KUMAR