Project : Molten Sulphur Tank Project PCS Rev. / Date : Rev.00 / DDMMYY
Location : Purwakarta, Jawa Barat, Indonesia Progress Month : MMYY
Owner : PT. South Pacific Viscose Currency : Rupiah

Subcontract No. : 0-0791-3154-001


Subcontract Works : Tank Field Installation Work Contract Amount : 4,685,590,000
Subcontractor : PT. Hydroraya Adhi Perkasa Advance Payment : N/A

CUMULATIVE CUMULATIVE THIS


DESCRIPTION THIS MONTH LAST MONTH MONTH
[A] [B] [A - B]

1. PROGRESS AMOUNT - ORIGINAL SCOPE/ITEMS

(Refer to "Monthly Progress Summary")


1.1 Unit Rate Category - - -

1.2 Lump Sum Category 819,978,250 527,128,875 292,849,375

TOTAL (1) = 819,978,250 527,128,875 292,849,375

2. PROGRESS AMOUNT - CHANGE ORDER ITEMS

(Refer to "Change Order Progress Summary")

2.1 Unit Rate Category - - -

2.2 Lump Sum Category - - -

2.3 Daywork Category - - -

TOTAL (2) = - - -

TOTAL (1) + TOTAL (2) = 819,978,250 527,128,875 292,849,375

3. REFUND OF ADVANCE PAYMENT ( %) - NOT APPLICABLE

3.1 Original Scope/Items [ Total (1) x % ] - - -

3.2 Change Order Items [ (2.1) x % ] - - -

TOTAL (3) = - - -

4. RETENTION (5%)

4.1 Original Scope/Items [ Total (1) x 5% ] 40,998,913 26,356,444 14,642,469

4.2 Change Order Items [ { (2.1) + (2.2) } x 5% ] - - -

TOTAL (4) = 40,998,913 26,356,444 14,642,469

5. PAYABLE PROGRESS AMOUNT

5.1 Original Scope/Items [ Total (1) - (3.1) - (4.1) ] 778,979,337 500,772,431 278,206,906

5.2 Change Order Items [ Total (2) - (3.2) - (4.2) ] - - -

TOTAL (5) = 778,979,337 500,772,431 278,206,906

PT. HYDRORAYA ADHI PERKASA PT. JGC INDONESIA

Prepared / Submitted : Checked / Verified : Approved :

……………………… Ikhwanudin Febrian Prasetyo Boediharto


Site Manager Subcontract Eng Site Manager Project Manager
MONTHLY PROGRESS SUMMARY - ORIGINAL SCOPE / BQ ITEMS
MPS Rev. / Date: Rev.00 / DDMMYY
Project : Molten Sulphur Tank Project Progress Month : MMYY
Location : Purwakarta, Jawa Barat, Indonesia Subcontract No. : 0-0791-3154-001
Owner : PT. South Pacific Viscose Subcontract Works : Tank Field Installation Work
Subcontractor : PT. Hydroraya Adhi Perkasa

PROGRESS QUANTITY (WEIGHT) PROGRESS AMOUNT (IDR)


CONTRACT UNIT
CONTRACT CONTRACT AMOUNT
FWBS RATE CUMULATIVE CUMULATIVE THIS CUMULATIVE THIS CUMULATIVE THIS
DESCRIPTION BQ UNIT BQ (IDR) REMARK
CODE (IDR/BQ) THIS MONTH LAST MONTH MONTH MONTH LAST MONTH MONTH

[A] [B] [C] [D] [E] [F]=[D - E] [G]=[C x D] [H]=[C x E] [I]=[G - H]

5 4 0 0 STORAGE TANK
5 4 1 0 Atmospheric Tank LS 1.00 4,685,590,000 4,685,590,000 17.50% 11.25% 6.25% 819,978,250 527,128,875 292,849,375

TOTAL 4,685,590,000 17.50% 11.25% 6.25% 819,978,250 527,128,875 292,849,375

PT. HYDRORAYA ADHI PERKASA PT. JGC INDONESIA

Prepared / Submitted : Checked / Verified : Checked / Verified : Approved :

………………………… Ikhwanudin Febrian Prasetyo Boediharto


Site Manager Subcontract Engineer Site Manager Project Manager
MONTHLY PROGRESS REPORT
MRP Rev. / Date: Rev.00 / DDMMYY
Project : Molten Sulphur Tank Project Progress Month : MMYY
Location : Purwakarta, Jawa Barat, Indonesia Subcontract No. : 0-0791-3154-001
Owner : PT. South Pacific Viscose Subcontract Works : Tank Field Installation Work
Subcontractor : PT. Hydroraya Adhi Perkasa

CONTRACT PROGRESS BQ
BQ WEIGHT THIS REMARK
FWBS CUMULATIVE THIS MONTH CUMULATIVE LAST MONTH
DESCRIPTION MONTH
CODE % Percentage Weight (%) Percentage Weight (%) Percentage Weight (%)
[A] [B] [C] = [A*B] [D] [E] = [A*D] [F] = [C-D] [G] = [A*F] [H]

5 4 0 0 STORAGE TANK
5 4 1 0 Atmospheric Tank
5 4 1 0 A Inner Tank Shell - SS
5 4 1 0 A a Bottom/Annular Plate 10.00% DETAIL
100% KALKULASI
10.00% MENGGUNAKAN
75% 7.50% 25% 2.50% Example
5 4 1 0 A b Shell Course #1 5.00% 75% 3.75% 50% 2.50% 25% 1.25% Example
5 4 1 0 A c Shell Course #2 5.00%
PERHITUNGAN
50%
DARI
2.50%
HYDRORAYA
25% 1.25% 25% 1.25% Example
5 4 1 0 A d Shell Course #3 5.00% 25% 1.25% 0% 0.00% 25% 1.25%
5 4 1 0 A e Shell Course #4 0%
5 4 1 0 A f Shell Course #5 0%
5 4 1 0 A g Shell Course #6 0%
5 4 1 0 A h Shell Course #7 0%
5 4 1 0 A i Shell Course #8 0%
5 4 1 0 A j Heating Coil 0%
5 4 1 0 A k Top Angle 0%
5 4 1 0 A l Rafter 0%
5 4 1 0 A m Roof 0%

5 4 1 0 B Outer Tank Shell - SS


5 4 1 0 B a Bottom/Annular Plate
5 4 1 0 B b Shell Course #1
5 4 1 0 B c Shell Course #2
5 4 1 0 B d Shell Course #3
5 4 1 0 B e Shell Course #4
5 4 1 0 B f Shell Course #5
5 4 1 0 B g Shell Course #6
5 4 1 0 B h Shell Course #7
5 4 1 0 B i Shell Course #8

5 4 1 0 C Plat Form / Ladder


5 4 1 0 C a Perimeter P/F on Outer Tank
5 4 1 0 C b P/F on Inner Tank
5 4 1 0 C c Stairway
5 4 1 0 C d Ladder
5 4 1 0 C e Roof Railing

5 4 1 0 D Nozzle

5 4 1 0 E Manhole

5 4 1 0 F Insulation
5 4 1 0 F a Shell Insulation
5 4 1 0 F a Roof Insulation

5 4 1 0 G Painting
5 4 1 0 G a Cleaning and Pickling of Inner Tank
5 4 1 0 G b Painting of Inner Tank
5 4 1 0 G c Painting of Outer Tank

5 4 1 0 H Hydrotesting

TOTAL 25.00% 17.50% 11.25% 6.25%

PT. JGC INDONESIA


PT. HYDRORAYA ADHI PERKASA CONST. DISCIPLINE SUBCONTRACT
Prepared / Submitted : Checked / Verified : Checked / Verified : Checked / Verified : Approved :

………………………………… ………………………… Ikhwanudin Febrian P. Boediharto


Site Manager Superintendent Subcon Engineer Site Manager Project Manager
MONTHLY PROGRESS SUMMARY - CHANGE ORDER
MPS Rev. / Date: Rev.00 / DDMMYY
Project : Molten Sulphur Tank Project Progress Month : MMYY
Location : Purwakarta, Jawa Barat, Indonesia Subcontract No. : 0-0791-3154-001
Owner : PT. South Pacific Viscose Subcontract Works : Tank Field Installation Work
Subcontractor : PT. Hydroraya Adhi Perkasa

PROGRESS QUANTITY PROGRESS AMOUNT (IDR)


CONTRACT UNIT CUM.
CONTRACT CONTRACT AMOUNT
FWBS RATE CUMULATIVE CUMULATIVE THIS CUMULATIVE THIS CUMULATIVE THIS PAYMENT
DESCRIPTION BQ UNIT BQ (IDR) REMARK
CODE (IDR/BQ) THIS MONTH LAST MONTH MONTH MONTH LAST MONTH MONTH %

[A] [B] [C] [D] [E] [F]=[D - E] [G]=[C x D] [H]=[C x E] [I]=[G - H] [J]=[G/B]
CHANGE ORDER

CO - SJU - 3120 - 001 - 001 Various Site Instruction Ls - - - - - - - -

TOTAL - - - - #DIV/0!

PT. HYDRORAYA ADHI PERKASA PT. JGC INDONESIA

Prepared / Submitted : Checked / Verified : Checked / Verified : Approved :

………………………….. Ikhwanudin Febrian Prasetyo Boediharto


Site Manager Subcontract Engineer Site Manager Project Manager
MONTHLY PROGRESS REPORT - CHANGE ORDER
MRP Rev. / Date: Rev.00 / DDMMYY
Project : Molten Sulphur Tank Project Progress Month : MMYY
Location : Purwakarta, Jawa Barat, Indonesia Subcontract No. : 0-0791-3154-001
Owner : PT. South Pacific Viscose Subcontract Works : Tank Field Installation Work
Subcontractor : PT. Hydroraya Adhi Perkasa

PROGRESS BQ
CONTRACT
FWBS BQ CUMULATIVE THIS CUMULATIVE LAST THIS
DESCRIPTION BQ UNIT REMARK
CODE MONTH MONTH MONTH

[A] [B] [C] [D]=[B - C]

PT. JGC INDONESIA


PT. HYDRORAYA ADHI PERKASA CONST. DISCIPLINE SUBCONTRACT
Prepared / Submitted : Checked / Verified : Checked / Verified : Checked / Verified : Approved :

……………………………………… …………………………… Ikhwanudin Febrian P. Boediharto


Site Manager Superintendent Subcon Engineer Site Manager Project Manager

You might also like